External Payload Installation Challenges

Slides:



Advertisements
Similar presentations
The Cold Stowage group retrieves payloads that have returned from the International Space Station via the SpaceX Dragon Capsule. They utilize NASAs C9.
Advertisements

Dr. Rob Ambrose Chief, Software, Robotics and Simulation Division NASA JSC May 2011 Development and Deployment of Robonaut 2 to the International Space.
SHUTTLE PROCESSING (Before Flight Activities Rarely Seen By The General Public) DISCOVER --- DISCOVERY.
AMS-02 Rebaselining Outbrief ISS PIA/ICD & SSP MIP/ICD ISS Payload Mission Integration & Planning/OZ2 Space Shuttle Mission & Cargo Integration Office/MO3.
Inner Guides=Text Boundary Outer Guides=Inner Boundary Asteroid Redirect Mission and Human Exploration Michele Gates Human Exploration and Operations Mission.
C2V2 Technical Requirements and Constraints
1 SHOT II Communication System Experiment University of Minnesota Max Schadegg, Cole Christensen, Ian Macmillen, Steve Haviland June 10 th, 2010 University.
Canadarm By: Matthew Ho
Maximizing ISS Utilization for Small Satellite Deployments and External Hardware/Sensor Testing Photo credit: NASA.
May 21-25, 2007Phase II FSR1 ISS Hardware Magnetic Susceptibility Testing and Analysis Trent Martin NASA AMS Project Manager
LUNAR ROVER Concept proposal meeting Dr. Ashish Dutta Indian Institute of Technology Kanpur Kanpur, INDIA ( *** for private circulation only)
Overview of AMS-02 Changes due the addition of the Permanent Magnet
THE AVENGERS Measuring Atmospheric Ozone gases. General  The primary goal of the ITO sensor project is to measure the concentration of Ozone (O 3 ) as.
Ashley Clark Embry-Riddle Aeronautical University.
Why are Space Stations so Hard? Bill Dwyer, NASA-JSC ISS Command and Data Handling System Hardware System Manager Ex-Space Station Freedom Data Management.
Space : missions and telescopes. Space missions PASTMERCURY GEMINI APOLLO SPACE SHUTTLE World War 2 A2 1 st soviet in orbit.
Bob Dedalis, HST Payload Safety Manager
Universal Chassis for Modular Ground Vehicles University of Michigan Mars Rover Team Presented by Eric Nytko August 6, 2005 The 2 nd Mars Expedition Planning.
TFAWS Paper Session International Space Station Passive Thermal Control System Analysis Top Ten Lessons-Learned Presented By John Iovine NASA Johnson Space.
Communication, Navigation, and Networking reConfigurable Testbed (CoNNeCT): An International Space Station National Lab Ann P. Over Project Manager NASA.
Kelley Case Concept Design Methods Chief JPL Innovation Foundry Caltech Space Challenge March 24, 2013.
SuitSat-1 A Unique Satellite By Gould SmithWA4SXM By Gould Smith, WA4SXM.
The final Space Shuttle has landed… Now what??. The Space Shuttle Since 1981, NASA space shuttles have been rocketing from the Florida coast into Earth.
Space Shuttle Challenger Lee Gray. Shuttle Program: First flight 1983 Began to use the Flight Numbers STS (Space Transport System) Challenger Began.
ESCG\L. D. Hill AMS-02 Permanent Magnet Safety Impact 1 AMS-02-PM Design Review - May 4-5, 2010.
Unit 4 ● Week 5 decisions Key Words. Unit 4 ● Week 5 communicate Key Words.
Mission Integration OZ2/Winston J. Reid/(281) Page No. 1 International Space Station Alpha Magnetic Spectrometer-02 AMS-02 Ops TIM - Ops Assessment.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
1 Columbus Control Center - Teams and Responsibilities - Roland Luettgens ESA Columbus Lead Flight Director Tel:
The Cloud-Aerosol Transport System (CATS) Patrick Selmer, CATS Operations Lead Matthew McGill, PI & PM John Yorks, Science Lead & Algorithms A New Earth.
Cyclops Splinter With SpinSat and Lonestar. Cyclops Splinter With SpinSat and Lonestar Cyclops provides the ISS Program with a method to transfer internally.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
MISSION AND PROGRAM INTEGRATION (MAPI) CONTRACT Pre-Decisional, Internal Use Only Speaker Name This presentation is intended solely for the audience.
1 Space Test Program - Houston 4 Payload Overview POIWG, 26 Jul 2012.
Baseline Review 05/20/14 PARC/Martha Cash RapidScat EPF-SDX INSTALLATION-HEATERS ON ADAPTER and INSTRUMENT Crew Commanding Unattended Time Critical External.
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
Robonaut Setup and Taskboard Training 5/2/2013 Curtis Kershner/ ER Dennis Bentson/
Chip Scale Atomic Clock Contact Info: Captain Ruiz Perez (281) John Merk (617) Paige McClung (281)
NASA – MSFC, Huntsville, Alabama Muscle Atrophy Research and Exercise System (MARES) Operations Summary Part I/II Karen Somers EO20/ Operations Lead
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Cindy Grant SPACE-X & Orbital Lead POD Office/EO
First Spaceflight of an Educator Astronaut Barbara R. Morgan - B.A. Human Biology, Stanford University - Teaching Credential, College of Notre Dame, Belmont,
Photo/TV POIWG Presentation Compact Flash Cards on ISS MISSION OPERATIONS DIRECTORATE EVA, ROBOTICS & CREW SYSTEMS OPERATIONS DIVISION CX46/S. Berenzweig.
CPCG-HM Overview POIWG July 26, 2012 Brittney Macon 1.
Engineering and Science Directorate Organization Structure June 2016.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Radiation Environment Monitor Kevin Hargrave EO
National Aeronautics and Space Administration July 2015 POIWG Face-to-Face: Thruster Constraints Planning and Coordination Ben Honey ADCO Specialist Flight.
National Aeronautics and Space Administration POIWG External Payloads Splinter: ADCO Operations Overview Ben Honey ADCO Specialist Flight Operations Directorate.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Kelvin Nichols, EO50 March 2016 MSFC ISS DTN Project Status.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Japanese Experiment Module (JEM) Airlock Overview Jimmy Whitaker ISS.
Belgian User Support and Operations Centre B.USOC SOLAR Operations Concept and Services SOLSPEC Workshop 10 March 2015 BIRA/IASB.
Synthetic Division Examples
By Evelyn Miralles Principal Engineer/Lead VR Innovator
National Robotics Initiative
HP Introduced New Zero-Gravity Printer for the International Space Station
​The consequences of poor installation  practices, and how these relate to the catastrophic failure of External Wall Insulation Systems Paul Valentine.
Links and Information Bible verses referenced in presentation:
SHUTTLE PROCESSING DISCOVER --- DISCOVERY
Description of RFW Removable Front Window (RFW) will replace current window with no modification to the MSG Work Volume Structure (estimate 1.5 Hours for.
זכויות סוציאליות.
STARSHINE on Station Conceptual Configurations
Investigation X – Requirements/Resource Table
ACD transparency - gaps between tiles - holes in tile to attach them
SPDM Overview.
Briefings and Debriefings
Cat.
10 questions in 5 minutes .. Can you beat the time?
Industrial Robotics.
BCPSS SUMMER ROBOTICS CHALLENGE 1 OBSTACLE COURSE Date: July 6, 2012
Jeff Dutton/NASA COR August 26, 2019
GOLD-2 – Anticipating Customer Needs
Presentation transcript:

External Payload Installation Challenges FLIGHT OPERATIONS DIRECTORATE EVA, ROBOTICS & CREW SYSTEMS OPERATIONS DIVISION External Payload Installation Challenges Ian Mills 11/03/2015

Robotic Operations Challenges Direct Install or Payload Handoff Payload Attachment Hardware Thermal Constraints Trajectory Constraints

FRAM (Flight Releasable Attachment Mechanism)

FRAM Fully Installed

FRAM Fully Installed (Cont.)

RapidScat Install

CATS Handoff

CATS Handoff

SpaceX Latch

Multi-layer Insulation straps

Multi-layer Insulation straps (cont.)

ISS External Hardware

ISS External Hardware (cont.)

ISS External Hardware (cont.)

ISS External Hardware (cont.)

ISS External Hardware (cont.)

ISS External Hardware (cont.)

ISS External Hardware (cont.)

ISS External Hardware (cont.)

ISS External Hardware (cont.)

ISS External Hardware (cont.)

ISS External Hardware (cont.)

ISS External Hardware (cont.)