Micromegas tests ̶ Test beam 2010 plans ̶ RD51 Mini Week - CERN

Slides:



Advertisements
Similar presentations
D. Peterson, “The Cornell/Purdue TPC”, LCWS05, Stanford, 21-March The Cornell/Purdue TPC Information available at the web site:
Advertisements

D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
D. Peterson, “The Cornell/Purdue TPC”, ALCPG, Snowmass, 23-August The Cornell/Purdue TPC Information available at the web site:
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
LCTPC WP Phone Meeting #71 – Micromegas module1 D. Attié, P. Colas Analysis Meeting, DESY 11 February 2009 LP test beam Micromegas analysis -
Zeuthen, January 16, 2008 P. Colas - Micromegas panels1 Micromegas panels Status and plans D. Attié, P. Colas, X. Coppolani, M. Dixit, M. Riallot, F. Sénée,
Status and outlook of the Micromegas modules D. Attié, D.S. Bhattacharya, P. Colas, S. Ganjour, et al. LCTPC Collaboration meeting DESY, 30/05/2014.
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
ILD Large Prototype TPC tests with Micromegas D. Attié, A. Bellerive, P. Colas, E. Delagnes, M. Dixit, I. Giamatoris, A. Giganon J.-P. Martin, M. Riallot,
Preliminary Micromegas Data Analysis Results D. Attié, P. Colas, M. Dixit, M. Riallot, Yun-Ha Shin, S. Turnbull, W. Wang 20/05/20101Wenxin Wang - LC-TPC.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
TPC Large Prototype cosmic trigger and Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Large.
RD51-WG VI 28/04/2009M. Alfonsi (CERN)1 RD51 common test beam: specifications and installation status Matteo Alfonsi (CERN)
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, E. Delagnes, M. Dixit, M. Riallot, Y.-H. Shin, S.
Micromegas TPC Results from beam tests 7-module design ILD TPC mechanics and integration D. Attié, M. Carty, P. Colas, G. De Lentdecker, M. Dixit, M. Riallot,
RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.
June 22, 2009 P. Colas - Analysis meeting 1 D. Attié, P. Colas, M. Dixit, Yun-Ha Shin (Carleton and Saclay) Analysis of Micromegas Large Prototype data.
LCTPC WP Phone Meeting #71 – Micromegas module1 D. Attié, P. Colas, M. Dixit, Yun-Ha Shin, R. Woods TPC Tests Analysis Meeting, DESY 28 May 2009.
Resistive anode studies D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Micromegas Large Prototype panels Studies.
29/09/2010 1Wenxin.Wang_EUDET annual workshop D. Attié, P. Colas, M. Dixit, M. Riallot, YunHa Shin, S. Turnbull, W. Wang and all the LC-TPC collaboration.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
Status 29/09/15. Trigger system: - Scintillator system : scintillator+pmt, discriminator+ coincidence module -TLU module + PC + USB cable Detectors :
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, M. Dixit, M. Riallot, W. Wang Micromegas tests ̶
P. Colas on behalf of LCTPC. Strategy for Micromegas The Micromegas option is studied within the same (EUDET) facility as the other options (see R. Diener’s.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
Six modules Micromegas TPC beam test & Test bench 12/4/2012W.Wang_RD51 mini week1 D. Attié, P. Colas, M. Dixit, P. Hayman, W. Wang.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
Astrophysics Detector Workshop – Nice – November 18 th, David Attié — on behalf of the LC-TPC Collaboration — Beam test of the.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
NoV. 11, 2009 WP meeting 94 1 D. Attié, P. Colas, E. Ferrer-Ribas, A. Giganon, I. Giomataris, F. Jeanneau, P. Shune, M. Titov, W. Wang, S. Wu RD51 Collaboration.
WG7 summary 5 th RD51 Collaboration Meeting in Freiburg WG7 summary M. Alfonsi (CERN)
Zeuthen, January 16, 2008 P. Colas - Micromegas panels1 Micromegas panels Status and plans D. Attié, P. Colas, X. Coppolani, M. Dixit, M. Riallot, F. Sénée,
D. Attié, P. Colas, K. Fujii,T. Matsuda, M. Riallot, A. Sugiyama, W. Wang Thanks to M. Dixit, Yun-Ha Shin, S. Turnbull,Yulan Li Construction and tests.
Wenxin Wang (D. Attié, P. Colas, E. Delagnes, Yuanning Gao, Bitao Hu, Bo Li, Yulan Li, M. Riallot, Xiaodong Zhang)
TPC R3 B R3B – TPC Philippe Legou Krakow, February nd
Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, Y-H Shin S. Turnbull, R. Yonamine (Carleton, KEK, Saclay)
TPC for ILC and application to Fast Neutron Imaging L. An 2, D. Attié 1, Y. Chen 2, P. Colas 1, M. Riallot 1, H. Shen 2, W. Wang 1,2, X. Wang 2, C. Zhang.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
ATLAS muon chamber upgrade Within the MAMMA collaboration Arizona, Athens(U, NTU, Demokritos), Brookhaven, CERN, Harvard, Istanbul, Naples, CEA Saclay,
Update of Prototype AT-TPC May 6, 2010 Weekly meeting Daisuke Suzuki, NSCL.
Test beam check list Michael JECKEL EN-EA-EC.
Test Beam Request for the Semi-Digital Hadronic Calorimeter
High-Resolution Micromegas Telescope for Pion- and Muon-Tracking
Large TPCs for HEP ILC-TPC & Fast Neutron detector
RD51-WG X June test beam experience: useful information for October
Large Area Endplate Prototype for the LC TPC
Nikhef/Bonn LepCol meeting
Power pulsing of AFTER in magnetic field
‘Octopuce’ beam test D. Attié, X. Coppolani, P. Colas, M. Lupberger, M. Riallot, J. Timmermans, W. Wang Thanks to K. Dehmelt & U. Renz I’m here to present.
Recent test results from a fully integrated Micromegas TPC prototype
Recents Analysis Results From Micromegas TPC
Micromegas TPC D. Attié, M. Carty, P. Colas, G. De Lentdecker, M. Dixit, M. Riallot, YunHa Shin, S. Turnbull, W. Wang, and all the LC-TPC collaboration.
The Pixel Hybrid Photon Detectors of the LHCb RICH
Dan Burke1, P. Colas2, M. Dixit1, I. Giomataris2, V. Lepeltier3, A
in a high intensity beam
7-Module beam test D. Attié, P. Colas, W. Wang,
TPC chamber for Medipix2/TimePix
a TPC with resistive Micromegas
News from Micromegas modules
MICROMEGAS DHCAL Intro
D. Attié, P. Colas, K. Fujii,T. Matsuda,
Covering a Large Area ILC-TPC endplate
News from Micromegas modules
Presentation transcript:

Micromegas tests ̶ Test beam 2010 plans ̶ RD51 Mini Week - CERN D. Attié, P. Colas, M. Dixit, M. Riallot, W. Wang I’m here to present a TPC review RD51 Mini Week - CERN David.Attie@cea.fr Astrophysics Detector Workshop – Nice – November 18th, 2008

RD51 Mini-week, CERN – WG7 – February 24, 2010 Data taking diagram Goliath magnet Vdrift =1 kV CAEN 471A (NIM) SHV cables Vmesh = 380 V Beam trigger T2K electronics 1728 channels Back-end electronic (ML405) Optical fibre Lemo LV-TTL TCP/IP via ethenet LV (+5 V) PC T2K DAQ on Linux T2K gas (5L/h) 500 Go Standard PC Power supply HDD Hall Control room Micromegas TB2010 RD51 Mini-week, CERN – WG7 – February 24, 2010

Detector description 1/2 1726 pads Micromegas resistive Kapton bulk 17 cm 23 cm 24 rows x 72 columns; <pad size> ~ 3.2x7 mm2 Micromegas TB2010 RD51 Mini-week, CERN – WG7 – February 24, 2010

Detector description 2/2 Total weight: ~20 kg Radiation length: 40% (2×1.8 cm of aluminium) B field Top 27 cm 40 cm Bottom 35cm 11 cm Micromegas TB2010 RD51 Mini-week, CERN – WG7 – February 24, 2010

Requests for the beam tests Detector placed in the centre of the magnet for homogeneous B field Goal: precision tracking and performance measurement of the resistive Kapton coverlay with hadrons at different beam intensities in TPC mode Duration: 3-4 days Particles: muons preferably, the rest can be hadrons, from low to very high rates Intensity: scan necessary. Gas: premix bottle of T2K gas (ArCF4Iso) at 5 L/h Status: optical fiber, SHV cables, gas tube already installed improve the box installation: secured small lift table own beam trigger as close as possible to the gas box but out of the B field Micromegas TB2010 RD51 Mini-week, CERN – WG7 – February 24, 2010