Evolution of the Virgo detector: The Virgo+ plans

Slides:



Advertisements
Similar presentations
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
Advertisements

September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
T1 task- update Mike Plissi. 2 Collaboration Groups actively involved INFN-VIRGO MAT IGR-Glasgow Groups that have expressed interest INFN-AURIGA CNRS-LKB.
Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
Virgo commissioning update - VSR1 first month summary E. Tournefier WG1 meeting, Cascina June 20 th,2007.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
COMMISSIONING PROGRESS G.LOSURDO – INFN Firenze for the Virgo Collaboration.
Present Superatttenuator performance vs. AdV & ET Requirements S.Braccini for Virgo Suspension group.
September 8, 2015 THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
G D Initial LIGO improvements & Advanced LIGO P Fritschel PAC Meeting LLO, 18 May 2005.
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Status of Virgo Gabriele Vajente INFN Pisa and Scuola Normale Superiore di Pisa On behalf of the Virgo Collaboration 11 th Gravitational Wave Data Analysis.
Plans for Advanced Virgo
Francesco Fidecaro STAC meeting, Cascina, May 28, 2009 Virgo status report.
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
Status of the Advanced Virgo detector F. Piergiovanni on behalf of The Virgo Collaboration GWPAW, Osaka, 06/17/2015.
Summary and Plans for the WG3 activity H.Lück, M.Punturo.
The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
1 ILIAS Birmingham, 10/07/2008 H. Heitmann The Virgo+ shutdown.
T1 task- update Mike Plissi. 2 Motivation  Thermo-elastic noise is higher than the ‘intrinsic’ noise in crystalline materials  There are several sources.
LISA October 3, 2005 LISA Laser Interferometer Space Antenna Gravitational Physics Program Technical implications Jo van.
Novemebr 5, 2006LSC meeting1 Virgo Update Prospects on detector performance and running schedules B. Mours.
Status of Virgo A. Viceré INFN-Firenze – Università di Urbino.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
G Z LIGO R&D1 Input Optics Definition, Function The input optics (IO) conditions light from the pre- stabilized laser (PSL) for injection into.
Virgo Upgrades Toward Virgo+ Michele Punturo Virgo Collaboration INFN Perugia.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
January 12, 2006ILIAS-WG3 Frascati1 Virgo+ & Advanced Virgo B. Mours With material from G. Losurdo, M. Punturo, A. Viceré and others.
Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Advanced VIRGO Input optics LIGO-G Z.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
Paolo La Penna ILIAS N5-WP1 meeting Noise analysis in Virgo Cascina, 7-8 July 2004 Analysis of noise in VIRGO.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration.
Virgo+ Commissioning Status. Main upgrades and activities Laser system: from 10  25 watt output power at the IMC TCS: ring + Central Heating Electronics:
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
“Detector activities” after the IB upgrade Michele Punturo.
WG3 Report Michele Punturo Harald Lück. WG3 composition Co-Chairmen M.Punturo INFN Perugia, Italy H.Lück MPI für Gravitationsphysik, AEI, Hannover, Germany.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
STREGA & ET - 4th ILIAS-GW general meeting 1 STREGA legacy for ET Michele Punturo INFN Perugia.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
Cascina, Nov. 4 th, 2008 AdV review 1 AdV Injection system E. Genin European Gravitational Observatory.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
Advanced Towards Advanced Virgo Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator on behalf of the Virgo Collaboration.
Advanced Advanced Virgo BASELINE DESIGN advanced Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator for the Virgo Collaboration.
Advanced Coll. Meeting – Cascina, Sept 11th, 2007 G.Losurdo – INFN Firenze/Urbino 1 SUPERATTENUATOR - IP BASELINE: VIRGO DESIGN with STIFFER IP LEGS TILTMETER.
GEO Status and Prospects Harald Lück ILIAS / ETmeeting Cascina November 2008.
MG 11 - Berlin Virgo status Marie-Anne Bizouard (LAL-Orsay) on behalf of the Virgo Collaboration.
Edwige Tournefier for the Virgo Collaboration The status of Virgo.
THE NEXT GENERATIONS OF GRAVITATIONAL WAVE DETECTORS (*) Giovanni Losurdo INFN Firenze – Virgo collaboration (*) GROUND BASED, INTERFEROMETRIC.
VIRGO Second part. Advanced VIRGO and the INFN VIRGO activity in 2010 Fulvio Ricci
Michele Punturo WP3 meeting, Cascina 9-July-2004
Reaching the Advanced LIGO Detector Design Sensitivity
THE NEXT GENERATION OF GRAVITATIONAL WAVE DETECTORS
Status of Virgo GWDAW Dec 13-16
Advanced VIRGO Experiment
Virgo Update B. Mours LIGO-G Z August 15, 2006 LSC meeting.
Virgo – Injection SYStem
GEO HF Limits/Goals/Options…
Virgo Update – LSC meeting
3rd generation ITF sensitivity curve
P Fritschel LSC Meeting LLO, 22 March 2005
The views of Virgo collaboration groups on upgraded/advanced Virgo
Status at the Prague meeting
Presentation transcript:

Evolution of the Virgo detector: The Virgo+ plans Michele Punturo Virgo collaboration LIGO-G070335-00-Z

The theory: The Virgo nominal sensitivity Improvement of the detector: Reduction of the shot noise Reduction of the mirror thermal noise Reduction of the suspension thermal noise M.Punturo LSC-Virgo meeting

The reality: The Virgo noise “Actual” Virgo 7.9W injected instead of 10W G=40 instead of 50 Eddy current effects Perfect OMC Real life: technical noises Actuation and control loops noises at low frequency Un-modeled noises in the central frequency range M.Punturo LSC-Virgo meeting

Building up the Virgo+ plans The upgrade plan must take in account the two “visions”: Reduction of the “fundamental” noises Higher laser power Lower suspension (thermal) noises Identification and mitigation of the technical noises A series of “limited” upgrades, already foreseen before the Virgo+ project, entered in the Virgo+ global planning Long commissioning phase after the joint VSR1-S5 run Recovering of the intermediate frequency sensitivity Scattered light Actuation noise Recovering of the low frequency noise Control loops noise investigations MSC further investigations Eddy current possible mitigation Installation of small upgrades M.Punturo LSC-Virgo meeting

Virgo+ upgrades: new laser amplifier A 50W laser amplifier (produced by LZH) is already under test in the Virgo-Nice lab 20W laser (injection-locked ) 40WAmplifier module Nd-YvO4 crystal Crystal pumping module Pre Mode Cleaner Master Laser M.Punturo LSC-Virgo meeting

Cascade effect on the ITF Obviously the laser power increase will affects all the ITF Code responsible Title virchrq0022005 P. La Penna, N.Man Laser Improvements WP for Virgo+ virchrq0032006 (now) J. Van den Brand Replacement of the Virgo MC payload virchrq0012007 P. La Penna Suspended Injection Bench Faraday isolation remote adjustment virchrq0042007 ITF input power remote tuning virchrqXXXXXX V.Fafone Thermal compensation http://wwwcascina.virgo.infn.it/collmeetings/DMwebpages/CRE/index.html Reshuffling of the LB: Pre-MC, new FIs, remote tuning of the injected power Heavier mirror and payload, better quality mirror Cleaner mirror & thermal compensation Remote tuning of the FI, Thermal lensing issues, dihedron modification? Reshuffling of the EIB

New Last stage suspension Suspension and mirror thermal noises are still far to be a limit for the current Virgo sensitivity, but: “Scientific” Motivations Reduction of the shot noise (and the increase of the cavity finesse from 50 to 150) will “discover” the mirror thermal noise Virgo end mirrors are made in Herasil Lower coating mechanical losses Reduction of the suspension thermal noise will permit to completely benefit of the high filtering performances of the Virgo SA “Technical” motivations Suspension thermal “excess noise”, due to eddy currents in the RM could become quickly a limiting noise in the low frequency range RM in Aluminum aren’t compliant with the Virgo design Magnets intensity larger than the original design Intervention on the input mirror payloads also required by Wrong polarity of the magnets Cleaning of the mirror (is situ?) M.Punturo LSC-Virgo meeting

Monolithic suspension A fused silica monolithic suspension design is under development in Virgo Joint effort of the Perugia, Roma 1, Firenze labs with the EGO and LMA support Keywords Monolithic FS suspension Silicate bonding of the fibers to the standard (new) Virgo mirrors Metallic marionette (fully compatible with the current SA) Metal-to-fused silica clamps Dielectric reference mass Current status: See H.Vocca talk One suspension trial successful Design under development New mirrors under polishing now Realization foreseen in the Virgo+ scenario (big bet) M.Punturo LSC-Virgo meeting

New DAQ & Control electronics R&D activity started before the Virgo+ project Now “fully” integrated in the Virgo+ plan New coil drivers (to be installed before the Virgo+ shutdown) New DSPs Huge computational power See A.Gennai Talk Ready before Virgo+ shutdown, possible some preliminary test installation New timing electronics GPS receiver Timing distribution box See A.Masserot talk New ADCs M.Punturo LSC-Virgo meeting

M.Punturo LSC-Virgo meeting TBD activities Other developments are under investigations but their planning still must be defined DC detection (LIGO experience) Tiltmeters To improve the detector robustness against bad weather disturbances M.Punturo LSC-Virgo meeting

M.Punturo LSC-Virgo meeting Planning definition The Virgo+ planning is still under evolution and the milestones are defined through a series of reviews 3rd of April: First Virgo+ review Definition of the preparation plan http://wwwcascina.virgo.infn.it/collmeetings/DMwebpages/firstVirgoplusReview.html November 2007 Second Virgo+ review Selection of the mature upgrades Definition of the installation plan Detectors meetings M.Punturo LSC-Virgo meeting

M.Punturo LSC-Virgo meeting Current Plan A production and installation plan is currently available, but still under evolution The current view is: VSR2 Laser Instal- lation Small upg. Small upg. WSR WSR VSR1-S5 commissioning VSR2 Laser Instal- lation Suspen sions September 07 April 08 June 08 Sept 08 Dec 08 Target: To be back in science mode before the end of 2009 M.Punturo LSC-Virgo meeting

M.Punturo LSC-Virgo meeting Expected sensitivity (b) Virgo+ (NN) Mpc Curve (b) NSNS 114 (45.6) 121 (48.2) BHBH 584 (234) 664 (265) M.Punturo LSC-Virgo meeting