Looking back on 2014 and Perspectives for the MPE Group in 2015

Slides:



Advertisements
Similar presentations
Dr. José Miguel JIMENEZ LS2 Coordinator LHC Performance Workshop (Chamonix 2014) Session 8 - Long Shutdown 2 Strategy and Preparation Chair: José Miguel.
Advertisements

Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
Discussion. Help Needed for Splice Consolidation Opening and closing W (20 FTE’s) Repair, reinstall and tack PIM’s (2) Orbital machining of M sleeves.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
RAMSES PROGRAMME F. SZONCSO CERN – DGS/DI 31 st March 2014 CERN – GREECE INDUSTRY day1.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Thomas Otto (TE DSO), Safety Officer in Charge of LS1. 37th LSC, Thomas Otto, Safety Officer in charge of LS11.
Wojciech Sliwinski BE/CO for the RBAC team 25/04/2013.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
R.Schmidt TE-MPE-PE: members of the section Michael Jonker Mike Koratzinos Rüdiger Schmidt Daniel Wollmann – from 1 st November 2011 Arjan Verweij Carlos.
TE- MPE PE members 1.Bernhard Auchmann; 2.Zinur Charifoulline; 3.Michael Jonker; 4.Arjan Verweij; 5.Daniel Wollmann; 6.Rüdiger Schmidt; 7.Vera Chetvertkova.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
New projects, priorities and main objectives for /12/15 TE-MPE Annual Meeting1.
E. Todesco MAGNET (RE)Training E. Todesco Magnets, Superconductors and Cryostats Group Technology Department, CERN LHC risk review, 5 th March 2009 Acknowledgements:
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
CLIC 23 rd Project Meeting: news and updates Philip Burrows John Adams Institute Oxford University 1.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
TE-CRG Activities D. Delikaris, TE-CRG.
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
 TE-MPE-PE Clean code workshop – R.Heil, M.Koza, K.Krol Introduction to the MPE software process Raphaela Heil TE-MPE-PE Clean code workshop - 9 th July.
EDMS N° V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]
Warm Magnets - LS1 Feedback J. Bauche, on behalf of the TE-MSC-MNC Team.
Operations Coordination Team Maria Girone, CERN IT-ES GDB, 11 July 2012.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Registered participants participants from outside Cern.
General Information & Templates S. Prodon. Medium Term Plan MTP approved by the Finance Committee in June Peaks at a cumulative deficit of 540.
Agenda Reorganisation MARS Offices Staff, fellows and students
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
CALIFES A proposed electron beam test facility at CERN
AFC 2017 (and 2018) AFC timeline:
Daniel Calcoen TE-MPE-EP
PH-DT Seasonal Group Meeting 21/1/14
LHC Enhanced Quench Protection System Review
Space Management and Logistics during LS2
June 22, 2017 Burkhard Schmidt for the DT coordination team
Safety in Construction and Upgrade Phases
TE-MPE LS1 review Vision from EN-EL(CF)
RELIABILITY OF 600 A ENERGY EXTRACTION SYSTEMS
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
J. Uythoven for the MPE-MI & MS Teams
MPE main activities planned for LS2
Machine Availability and Reliability Panel (MARP)
and Electrical Integrity Group First Plenary Group Meeting 22/01/2009
LIU, ABP-CWG, PBC, miscellaneous
RF operation of REX-ISOLDE
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
How to run ions in the future?
Overview & baseline of LS2 and roadmap for CRG
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Instrumentation CALIFES ideal for tests and development that requires frequent access to test setup. CERN BI members already using CALIFES and want to.
SRF Section Cuvée 2014.
DS Collimators TE-MSC-CI
MENU 20  MERRY CHRISTMAS tekhnologic.
Circuit Disconnector Boxes Implementation of our safety first policy
ILO Industrial Opportunities Days, 6-7 June 2019
Radiation Working Group RADWG
WP13 outsourcing: Hollow Electron Lens
R. Denz, TE-MPE-EP Acknowledgements: J. Steckert
Presentation transcript:

Looking back on 2014 and Perspectives for the MPE Group in 2015 CONCLUSION Looking back on 2014 and Perspectives for the MPE Group in 2015 15/12/2014 TE-MPE Annual Meeting

Looking back on 2014 The whole 2014 was a remarkably busy year for the whole MPE Group We have managed to reach all our objectives set for 2014 The LS1 spectacular success in 2013/2014 would not be possible without a team of dedicated MPE experts and our collaborators from all around the world Many thanks to all for contributing to the completion of the LS1 and resuming the operation of CERN accelerator complex: Staff and Fellows, Associates and Students, Administrative Support, Industrial Contractors 15/12/2014 TE-MPE Annual Meeting

Short-term and Medium-term Perspectives TE-MPE is and will be playing an important role in the accelerator complex: Restart and contribution to the operation of the LHC after LS1 Contribution to the restart and operation of the injector chain Completing HIE-ISOLDE interlocks Maintain efforts towards Consolidation of existing Accelerators and related Infrastructures 15/12/2014 TE-MPE Annual Meeting

Main Short-term Objective for the MPE … to climb to the “summit” of the LHC Hardware Commissioning by mid March 2015 15/12/2014 TE-MPE Annual Meeting

Short-term and Medium-term Perspectives Preparing the machine and magnet circuit protection technologies for new projects: HL-LHC, AWAKE and ELENA, SM18 upgrade and B180 Magnet Test Facility (FAIR magnets) In particular, in 2015 we will define a baseline for the QPS2, BIS2 and PIC2 Projects Searching new technologies for potential future projects such as CLIC and FCC We know what we have to do in 2015… 15/12/2014 TE-MPE Annual Meeting

Merry Christmas and Happy New Year to you and your families 15/12/2014 TE-MPE Annual Meeting