EN-HE Group meeting 4th December 2015

Slides:



Advertisements
Similar presentations
TS WORKSHOP MAY. LHC & EXPERIMENTS I 4 MAY (08:30->12:30) Chair: K. Potter.
Advertisements

BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Accelerating Science and Innovation. Science for Peace CERN was founded in 1954 as a Science for Peace Initiative by 12 European States Member States:
2015 HM section activity Helder Lourenço. E119/EN Maintenance Contract Maintenance services on industrial trucks on the CERN site 1700 assets (CH,CS,LV,RTL,RTH,RH,TP,DS)
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
Users’ Office News Doris Chromek-Burckhart Head of Users Office New Users’ Office Web Pages Release of Pre-Registration Tool in July 2014 Insurance for.
EN-GMS Group Meeting S. Prodon – CERN News (scientific matters) 1 st collisions at 13 TeV on 20 May Stable beam as from 3 June = start of.
TENDERING PROCEDURE IT- 3927/EN
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
Organization, Projects and Activity Forecast 2012 Oliver Böttcher, 29 th of March 2012 EN-HE-HM Handling Maintenance Section at CERN.
Transport and handling at CERN for FAIR
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
6th ST workshop, Thoiry, 1-3 April ST-HM Design Section Strategy and working methods 3rd April 2003 C. Bertone ST-HM.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
LS1 – EN-HE Transport and Handling related issues 12 th June 2012 I. Rühl / EN-HE.
Transport & Handling of Detectors TAN Workshop S. Prodon –
EN-HE Group meeting 19 th June 2015 I. Rühl / EN-HE.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Cooling & Ventilation feed-back M. Nonis – EN/CV.
GMS (General Management & Secretariat) Group Meeting 10-jan-12.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
New Comers Information Emanuele Piemonti Spalazzi & Gaetan Richaud EN-GMS-Adm
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
GMS (General Management & Secretariat) Group Meeting 14-oct-10.
BUDGET 2012 EN-HE 29/03/ EN-HE CONTRACT LIST - OPERATION7’190 KCHF - PROJECT1’738 KCHF - CONSOLIDATION 4’239 KCHF JMS.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
BIDDERS’ CONFERENCE IT-3976 Provision of Specialized EOT Crane Maintenance Services on the CERN Site May 5 th 2014 Handling Engineering Group2 Introduction.
BIDDERS’ CONFERENCE IT-3972 Provision of Maintenance Services on the Industrial Trucks at CERN April 24th 2014 Handling Engineering Group2 Introduction.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Transport and Handling Manpower Planning S. Prodon – LEAF
Logo area Handling Engineering Requirements EN-HE Group Bruno Feral – EN/HE EDMS HL-LHC CE Consultant Kick-Off Meeting – 31/05/2016.
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Bidders’ Conference IT-4130/EN Replacement of Personnel Lifts (up to 2 t Capacity) I. Rühl / EN-HE.
Financial Matters Ferdinand HAHN 08/04/ Content Definition of Common Fund (MOF) in MoU MOF in 2010 (Budget – Contributions -Expenses) MOF in 2011.
I. Bergevoet - Training preparation
YETS & LS2 Works EN-EL / Power distribution
ACCU meeting - D.Chromek-Burckhart – Users’ Office
East Area Renovation Project Team meeting # 2 – EDMS News
Framework Schedule from EYETS 2016 to LS2
CLIC Handling Engineering Update
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
YETS & LS2 Works EN-El on LHC / Power distribution
EN-Handling Engineering Group
Equipment simplified model SMR UR safety
EN-HE group meeting
EN-GMS Group Meeting S. Prodon –
HSE rules & regulations
Looking back on 2014 and Perspectives for the MPE Group in 2015
the high-voltage network of CERN ToMORROW
TENDERING PROCEDURE IT-3981/EN
Installations, modifications, consolidation in 2005:
EN-HE SPS works during EYETS
SPS activities during LS2 TE-EPC (Power Converter Group)
EN-HE L2 – PS – PSB – TT2 works during YETS
YETS & LS2 Works EN-EL / Power distribution
IT-4328: Technical Specification
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
EN-HE SPS during LS2 J-L GRENARD on behalf of EN-HE 23/1/2019.
IT-4464/EN Bidders conference
ILO Industrial Opportunities Days, 6-7 June 2019
Welcome to all of you On behalf of Roberto Losito,
Presentation transcript:

EN-HE Group meeting 4th December 2015 I. Rühl / EN-HE

Agenda General issues I. Rühl 10min HH activities C. Bertone 20min HL-LHC B. Feral 10min HM activities H. Lourenco 20min LM activities D. Lafarge 20min Fondue in building 7 04.12.2015 EN-HE Group meeting

Agenda – General issues I. Rühl EN-HE organization Supply and service contracts Space management Consolidation Budget EN Department 2016 Divers Conclusion 04.12.2015 EN-HE Group meeting

General issues EN-HE Organization Chart Departures New LD contracts Handling Engineering Group I. Rühl Deputy Group Leader C. Bertone   Group Administrator – JM. Soudan Secretariat (50%) – A. Lambert   M. Morer-Olafsen Departures Loic FAVRE-REGUILLON (TS) Ghizlane JDAINI (TS) A. Lambert (→EN-ACE; 01.01.2016) A. Calderone (Retirement; 30.09.2016) New LD contracts VN Lift technician CP C (01.07.2016) New arrivals M. Czech (Fellow; 01.09.2015) M. Morer-Olafsen (01.01.2016) EN-HE Secretariat EN Department Event Organizer Handling Maintenance H. Lourenco Lift Maintenance D. Lafarge Heavy Handling C. Bertone Cranes G. Roche J.-P. Granchelli R. Rinaldesi O. Böttcher   Industrial trucks J.-M. Chevalley B. Feral Maintenance Methods C. Bal   A. Calderone J-P. Lappe N. Perez Team ‘Handling’ S. Pelletier P. Brunero F. Daclin E. Dugue S. Fumey Y. Seraphin P. Vallet   Team ‘Projects’ J.-L. Grenard J.-B. Bonnamy (VIA) M. Czech (F) Team ‘Transport’ T. Mazzarino R. Brun 04.12.2015 EN-HE Group meeting

General issues – New contract policy Proposal: Change from 5 years LD contract duration to 5 + 3 years – APPROVED BUT CONTRACT EXTENSIONS ARE NOT AUTOMATIC Rules, regulations, procedures, ratio applies 04.12.2015 EN-HE Group meeting

General issues – Supply & service contracts IT-4074 Transport and handling services Contract S172/EN approved by FC Sept. 2015 Contract started in October 2015 – AltéAd / CH IT-4123 Crane rail supply & consolidation works Contract proposal to be approved by FC December 2015 New contract to start in January 2016 – BEMO RAIL / NL Financed via GS consolidation budget IT-4056 Replacement and maintenance of LHC lifts Contract B1433/EN approved by FC March 2015 Contract started in April 2015 – VESTNER / DE First lift to be replaced – ALICE in WS 2015/2016 CANCELLED 04.12.2015 EN-HE Group meeting

General issues – Supply & service contracts IT-xxxx Access to height / EOT crane access / Life-lines consolidation works MS to released by February 2016 IT to be released by April 2016 New contract to start in July 2016 04.12.2015 EN-HE Group meeting

General issues - Space Bldg. 867 bis - 900 m2 (60 x 15 m) + PR 40t Maintenance, training and storage of LHC and SPS transport and handling equipment (i.e. MAFI tunnel transport vehicles for LHC cryo-magnets) + similar storage area on Meyrin side Storage of transport and handling equipment that cannot be stored in the experimental areas anymore 04.12.2015 EN-HE Group meeting

General issues - Consolidation EN-HE consolidation program follows ‘almost’ the original consolidation plan LHC lift consolidation contract failed → 2nd lowest conform bidder Rather interested to do a maximum of consolidation projects before LS2 Taken over crane rail consolidation from GS Department 04.12.2015 EN-HE Group meeting

Budget 2015 - Operation EN-HE Group meeting 04.12.2015

Budget 2015 - Consolidation EN-HE Group meeting 04.12.2015

Some numbers Head of Department’s Office (EN-HDO) R. Saban Cooling & Ventilation (EN-CV) M. Nonis Electrical Engineering (EN-EL) S. Baird Handlling Engineering (EN-HE) I. Rühl Machines & Experimental Facilities (EN-MEF) K. Foraz Sources, Targets & Interactions (EN-STI) R. Losito General Management & Secretariats (EN-GMS) S. Prodon Industrial Controls & Engineering (EN-ICE) Ph. Gayet Mechanical & Materials Engineering (EN-MME) F. Bertinelli Department Head: Deputy: S. Baird 4 57 Medium Term Plan – Operation Budget 66 11 25 32 82 76 40 04.12.2015 EN-HE Group meeting

EN Department 2016 Role 2016 DSO R. Folch DRO A. Pardons DPO E. Delachenal DAO P. Barriere (as from 4/2016) DTO O. Capatina (?) Space Manager I. Ruehl 04.12.2015 EN-HE Group meeting

afety 04.12.2015 EN-HE Group meeting

Site Access VERY LIMITED SITE ACCESS DURING CERNs CHRISTMAS BREAK FROM 19.12.2015 TO 03.01.2016. SPECIAL ACCESS LIST TO BE CREATED FOR PEOPLE WORKING / ON CALL DURING THIS PERIOD. THIS LIST SHALL BE ACCORDING TO THE DOCUMENT ‘EN-HE ACTIVITIES DURING CHRISTMAS BREAK’ THAT IS PREPARED BY H. LOURENCO. 04.12.2015 EN-HE Group meeting

Conclusion Consolidation – (Was) All set up Pushing for 900m2 in 867bis LS2/LIU & HL-LHC studies ongoing! Additional manpower (F, TS, PJAS, VIA) requirements (Almost) no changes or whatsoever following the restructering 04.12.2015 EN-HE Group meeting

Merry Christmas and Happy New Year ! 04.12.2015 EN-HE Group meeting

MERCI