Assembly procedure – Inner Region

Slides:



Advertisements
Similar presentations
5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.
Advertisements

Alice ITS L5,6 Integration 1 End wheels and local services design – services layout on the end wheels: patch panels, routing, cooling and qualification.
PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Pair backgrounds for different crossing angles Machine-Detector Interface at the ILC SLAC 6th January 2005 Karsten Büßer.
1 Installation of Delphi Frame  ITS Installation.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Tracking Integration Challenges Y. meeting 2013/9/25.
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
Aug/16/05 Su DongSiD Vertexing: Snowmass 05 SiD trk+vtx1 SiD VXD Geometry Update Su Dong SLAC.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
Team Lit Week 9 Deliverables: Layout Drawings Justin Ballenger Brian Barker Greg Hahn Chow He Jon Klopf Vi-Vi Nguyen.
Alignment Tools Used To Locate A Wire And A Laser Beam In The VISA Undulator Project Wire Finder CALIBRATION A special fixture was constructed to calibrate.
PMG Meeting February 2000 A Split Central Silicon Tracker W. E. Cooper on Behalf of the D0 Silicon Group 3 February 2000.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
Operating procedure for POF cables Comoss Electronic Co., Ltd. Date : May-05, 2008.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
A 128 fiber Slit-Plate assembly, Kinematic mount
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
T-THERMO-MECHANICAL MODEL FOR THE LC FORWARD TRACKER Ciemat, October 27 th, FPA2013ILC workshop D. Moya, I. Vila, Instituto de Física de Cantabria (CSIC-UC.
Coil-pack assembly procedure Paolo Ferracin LQS01 readiness review #3 Assembly LBNL July 28, 2009.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
Mechanical Upgrade Interaction Region IR1 Luigi Pellegrino Mechanical Engineering Group (LNF Scientific Committee, May 9, 2013)
G. GIRAUDO - D. ORECCHINI Beam-Target line for PANDA – GSI – 4 February 2013 Beam-Target line for PANDA – GSI – 4 February 2013 Central Trackers assembly.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Straw man layout for ATLAS ID for SLHC
Towards Snowmass Jul. 13, 2005 Y.Sugimoto. Charge for Detector WGs Charge for Concept Groups: work towards a baseline design define performance criteria.
BM&N STS ladders assembly in VLHEP
Assembly of the doorknob
Mechanics: (Tim).
Installation step 4. (3 days)
C.Clerc ILD session, ALCPG /03/2010
LumiCal mechanical design, integration with LDC and laser alignment
Integration issues at IHEP
Requirements of the support mechanics
Materials of Energy Car
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
Sub-Detector Assembly Area Summary of discussion at ALCW2015
First of all we will remind some numbers:
LUCID Mechanical support and cooling proposal Status of the current design development Erik Richards, Raphael Vuillermet December 10th 2013.
SIT AND FTD DESIGN FOR ILD
Methods and Procedure for adjusting eccentric cones in INFN configuration Peter Amnuaypayoat 5/14/04.
Integration and IR Hall
FRACTIONAL ARC TEST GIRDER DESIGN REVIEW
Inner DET. Integration Inner detector envelope Radial clearances.
Valve stem “gag” mechanism
as a prototype for Super c-tau factory
BGC Collaboration Meeting –
RE3/1 & RE4/1 Parameter Space Services
Presentation transcript:

Assembly procedure – Inner Region

Assembly procedure – Inner Region Reminder : 1 2 3 4 5 6 From « Integration status and open issues» of 22/06/11 by M. Jore

Assembly procedure – Inner Region Level 1 (1st assembly) SIT FTD 3 at 7 Inner Support Structure

Assembly procedure – Inner Region Level 1 FTD 3 at 7 fixed and located on ISS (external mounting) FTD 3 at 7 Inner Support Structure Mechanical support (in red)

Assembly procedure – Inner Region Level 1 « Supporting wheels » fixed and located on the ISS For the SIT (half part) For the FTD 1&2 SIT FTD 1 & 2 Inner Support Structure Mechanical support (in yellow)

Assembly procedure – Inner Region Level 2 Vertex clamped around the Beam pipe To need a tools and a special support VTX Beam pipe

Assembly procedure – Inner Region Level 2 Cables fixed on the Beam pipe With a clamp in « Epoxy » Cables (in red) Beam pipe Clamp in Epoxy

Assembly procedure – Inner Region Level 3 Beam pipe with VTX assembled and located on the 1st assembly By cables or « striplines » or « tie rod » on the ISS

Assembly procedure – Inner Region Level 4 Close the FTD 1 & 2 Located and fixed between half part Cables ? FTD 1 & 2

Assembly procedure – Inner Region Level 5 Close the SIT (inner and outer) « Supporting wheels » Maybe FTD 3 ? Interactions with SIT ? Cables ? Cooling ? FTD 3

Assembly procedure – Inner Region Level 6 Close the FTD 3 at 7 with ISS (same process) FTD fixed on the ISS ? (or not to see level 7) Cables ?

Assembly procedure – Inner Region Level 7 Close the ISS Fixed beam pipe on the ISS ( to see level 3) Measures and controls

Assembly procedure – Inner Region Conclusion Need informations : For SIT For FTD1&2 For the cooling Assembly procedure : Laser alignment Different support for the mounting A support to handle the beam pipe