Saturday :12 Stable beams fill 3351 Initial luminosity

Slides:



Advertisements
Similar presentations
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Advertisements

LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Wednesday 5 th December until this morning 06:59 Stable beams fill #3375, L ~ 6.8e33 cm-2s-1. 10:40 Beam dump, trip of RD2.R5. Integrated L 72 pb-1 in.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Machine Coordinators: G. Arduini, J. Wenninger
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday 21st January & night
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Summary of Week 49 Machine coordination: Jorg Wenninger & Jan Uythoven
Monday fill with 1092 bunches (6 h stable beams)
LHC – Progress with Beam
Monday 11/07: Recovery Plenty of accesses.
Thursday 09:30 VdM scan for CMS, standard ADT gain.
LHC Morning Meeting - G. Arduini
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Thursday 10th May - morning
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Wire almost entirely through beam before BLM triggers dump
Tuesday 9th November 10:02 Fill beams dumped
Friday Morning 7:30 injection for fill 2908
Sunday
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Tuesday Access for RF & QPS (others in the shadow) until ~18:00.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday – Morning Fill 3265 stable beams since 1:31
Monday 24 October hours of 25ns MD
LHC Morning Meeting - G. Arduini
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
IP8 aperture measurements (07:30-10:30)
Thursday 26th July 13:21 Fill 2880 beam dumped
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Week 25 Summary Coordinators: Mike Lamont and Barbara Holzer
Wednesday 23/2 Thanks CRYO!!!.
Saturday 24 September 2011.
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Injection Studies: 50 ns ABT/BTP.
Monday 27th August & night
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Wednesday morning / afternoon
Wednesday morning Waiting for PS – problem on RF cavity.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Saturday 26th March 9:15 Problem with RB78 temporarily solved. It's running on one Thyristor bridge only and without the active filter LHCb polarity change.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Tuesday
Tuesday
Presentation transcript:

Saturday 1.12. 08:12 Stable beams fill 3351 Initial luminosity Atlas/CMS up to 6.9E33 cm-2s-1 ALICE at ~1E31 cm-2s-1 16:00 OP dump of fill 3351 120 pb-1 in 7.7 hours MKI8_C_Up at ~108% of temperature interlock

Afternoon Access: TI2 TED movement could block anytime – don’t move anymore before repair Attempt to put in place compensatory measures proposed by the DSO and disable TED in the “safe for beam” position; but not possible to get beam into the LHC when TED is disabled  reverted and updated procedure New configuration for PS extraction bump (extraction conditions at the extraction septum in the PS are constant) 19:30 injecting and steering transfer lines beam was dumped several times by LHCb injection was not reproducible - several 144 shots passed OK  revert the PS settings to those used on the last fill: extraction bump, extraction kicker and RF settings

From PS The problems encountered with the new cycle are not related to the new set of correctors used for the extraction but to a non conform copy of the RF settings and of the extraction kicker timing for the new cycle. This has resulted in larger satellite population and in particular of those in front and behind the main trains. These bunches are partly intercepted by the upper jaw of the TED and result in losses in LHCb As a result of that we have reverted back to the standard cycle with the same satellite population as in the last two fills.

TED TI2 Rails Repair to be done asap (next week)

TED TI2 Procedure LHC Access Safety System (LASS) EIS – Elements Importants pour la Sûreté (f-faisceau, m-machine) EDMS 1255294 2.0 In TI2 the three EIS elements are the beam stopper TED 29132, MBIBH29314 and MSIB29529. Currently a mechanical fault prevents the TED moving  ensure that SPS chain 4 is in access mode whenever access is needed in the LHC; this chain includes TED6103 thus providing a mechanical block to any potential beam Putting any LHC EIS out of chain makes it impossible to re-arm that chain for beam, so for each period of LHC access the TED must be removed and then replaced in chain in order to take beam This temporary procedure replaces the automatic positioning of a beam block with a manual check that another block is in place  repair estimated less than one week

Night 23:30 beam dump during injection by RF crowbar event on M1B1  reset 0:08 re-injecting fill 3359; Max losses at injection: 35% of dump threshold At start of ramp: 42% 1:23 beam dump in adjust: Slow losses close to roman pots (MQML 6R5) during collapse of IP1/5 separation bumps 2:30 injecting for fill 3360 IQC latched twice for B1 on TL BPMs Losses at start of ramp up to 36% 3:55 stable beams fill 3360 Initial luminosity Atlas/CMS up to 7.2E33 cm-2s-1 ALICE at ~0.9E31 cm-2s-1

Vacuum around roman pot 6R5

Last 24 hours

Pending issues: TI2 TED ODH sensor in UP62. In case of access fire brigade to intervene first. Intervention required. To come (next week): High brightness beam test. Tests ongoing in the SPS with new PS extraction timing. Monday: LHCb polarity change Reactivation ATLAS BCM