Location, Location, Location

Slides:



Advertisements
Similar presentations
Federal & State Regulatory Issues Elizabeth W. Whittle Nixon Peabody LLP 401 9th Street, N.W. Washington, D.C (202)
Advertisements

The Midwest ISO from a Transmission Owner Perspective.
Reliability in British Columbia
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
WECC Reliability Management System
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Revised Draft1 Distributed Generation Interconnections - Group Study Process Option: Voluntary Rolling Window Presented to Massachusetts Distributed.
Federal Energy Regulatory Commission Large Generator Interconnection Order on Rehearing (Order No A) RM March 3, 2004.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
1 Regulatory Developments and Impacts Involving Electricity Storage in Texas Elizabeth Drews 31 st USAEE/IAEE North American Conference Austin TX, November.
WELCOME Western Area Power Administration1. Where did the journey begin? Western Area Power Administration2.
Queue Reform at the Midwest ISO NARUC February, 2008.
Regional Transmission Organizations: The Future of Transmission? Dave Edwards 4/17/2004.
Energy Storage in California’s Grid of the Future Don Liddell, Douglass & Liddell Co-Founder and General Counsel, California Energy Storage Alliance ​
Federal Energy Regulatory Commission Proposed Rule on Small Generator Interconnection RM July 23, 2003.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
Topics to Cover Interconnection Process Overview
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Despite Order No Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013.
The Transmission Imperative November 3, 2011 Jay Caspary.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
MIDWEST ENERGY OUTLOOK THE ROLE OF COMPETITIVE POWER SUPPLIERS ENERGY MARKETS IN TURMOIL May 17, 2001 Freddi L. Greenberg.
The Value of Electric Transmission NASUCA Mid-Year Meeting June 25, 2012.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Pat Wood III, Chairman Federal Energy Regulatory Commission Bringing Power to California Customers Silicon Valley Manufacturing Group May 27, 2004.
WINDPOWER 2003 Austin, TX May 18-21, 2003 Session 4A: Regulatory Issues Monday May 19, :40-5:00 pm Wind Generation Interconnection to Transmission.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Federal Subsidies for Transmission Projects under the Recovery Act April 2009 By Deborah A. DeMasi.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
California Independent System Operator Joint Agency Energy Action Plan Meeting Generation Interconnection Queuing & Streamlining Dennis Peters, Lead Interconnection.
Updated 1/28/2011.
Cost Allocation Proposals associated with MISO Transmission Expansion WIEG Board Meeting May 6, 2010 WIEG Board Meeting May 6, 2010 Presented by: Kavita.
California Energy Commission Transmission Interconnection and the California Energy Commission Generator Licensing Process PANC 2010 Annual Seminar San.
Transmission Issues & Renewables Perspectives of a Wind Developer.
Midwest ISO Discussion February 5, 2009 Greg Levesque Manager – Regional Relations & Policy.
The Wind Coalition: Membership  Member Directory  AES Wind Generation | Acciona | Apex | Blattner Energy, Inc. | BP Alternative Energy North America.
Order 1000 Implementation in PJM – Challenges and Opportunities Jodi L. Moskowitz Senior Director – Transmission Development & Strategy October 13, 2015.
Overview of the Grid Clean Power Plan and Tribes October 15, 2015 webinar.
Bidders Conference December 2015
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
1.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
FERC Order 1000 Transmission Planning and Cost Allocation Key Points of Seminole Electric Cooperative, Inc.’s Proposal FRCC Regional Stakeholder Meeting.
Generator Interconnection Studies & Agreements Charles Hendrix.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
RTO WEST Summary of RTO West 9/18/02 Declaratory Order Presentation to The Committee on Regional Electrical Power Cooperation (CREPC) by John Carr 10/1/02.
Generation Interconnection Overview 2007 Transmission Summit July 31, 2007 New Orleans, Louisiana.
Mountain West Transmission Group
Operationalizing One Nation One Grid
CRE Public Consultation on new exempt interconnectors
Generation Interconnection Summary
Massachusetts Electric Restructuring Roundtable
Interconnection Practice, Policies, Procedures ComEd Illinois
T.O. Highway/Byway Recommendations
31st USAEE/IAEE North American Conference
Transmission As Enabler
Comments on Regional State Committee Proposal
Clair Moeller Mid-Continent ISO
FERC Guidance – Long Term Competition
2018 RTEP Report Key Maps, Tables & Figures
Solar Energy Commercialization Utility Scale Business:
Offshore Wind Transmission:
New England’s Response to FERC’s RTO Order No. 2000
Presentation transcript:

Location, Location, Location A wind project needs to be able to get its power output to the electric grid If there is not available physical access to transmission, that can’t happen If there is physical access, but the costs of transmission are too high, the project may be uneconomic Would you build a mall without good highway access?

Transmission Regulatory Scheme Transmission service is governed by utility tariffs. In many regions, transmission service is provided by an Independent System operator/regional transmission organization (RTO/ISO). RTO/ISOs do not own the transmission assets, but have operational control over them. Open-access, non-discriminatory transmission service is provided pursuant to a Tariff on file and approved by FERC.

Transmission Regulatory Scheme Tariffs govern: Interconnection Transmission Ancillary service Rates Dispute resolution

Interconnection The interconnection process has been standardized. Each Transmission Owner or RTO/ISO has tariff provisions governing the process from the filing of an interconnection request to the execution of the Interconnection Agreement. While the process is standardized, there are limited regional differences that are permitted by FERC. Milstones must be met to remain in the interconnection queue.

Interconnection The process includes a number of steps, many of which must be followed by deposits. Developer must pay for the costs of all studies. Interconnection Request - $10,000 System Reliability Study - $50,000 Facility Study - $100,000 Interconnection Agreement - $250,000 if can’t show evidence of site control

Interconnection Costs Studies tell you: - Costs of attachment facilities (the physical connection)(AFC) - Costs of upgrading the downstream system to accommodate new power injection (System Upgrade Costs)(SUC)

Interconnection Costs In addition, project must bear its own costs for transmission line between its project site and the point of interconnection (Interconnecting Line Costs)(ILC) Many sites with good wind resources are quite a distance from the transmission grid Total interconnection costs can, therefore, be significant

Interconnection Costs Total interconnection costs = SUC + AC + ILC Developers of projects often compete to attach to the same constrained transmission lines System for cost allocation is basically first come, first served So, earlier entrants may have lower SUC because they can utilize existing available capacity on system, without having to build system upgrades to enable their output to be accommodated

Key Considerations Developers should enter the interconnection process as early as they are willing to go public with their projects Developers need to understand interconnection costs Lenders and investors need to review and verify interconnection rights and costs Not every site with good wind will be workable from a transmission standpoint