BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

Large-acceptance superconducting dipole magnet GLAD Magnet parameters: Large vertical gap ± 80 mrad High integrated field of 4.5 Tm Fringe field at the.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
UPDATE of RFCC MOUDLE Derun Li, Steve Gourlay Lawrence Berkeley National Laboratory MICE MICO Meeting December 21, 2011.
-1- Wang, Li The 23rd MICE Collaboration Meeting to 17 HIT/CHINA WANG, Li Institute of Cryogenics and Superconductivity Technology.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
CBM Superconducting Dipole Magnet
IHEP participation in SIS300 production UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Institute for High Energy Physics Protvino, Russia FAIR meeting.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
F. Savary. Click here to add footer 2 Outline Context Constraints & Boundary conditions Project plan Production strategy A few words on QA Conclusions.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
X LCLS SCU NbTi Prototype Schedule Version: February 12, 2015 Update 23JUN2015 X X System complete and ready for test X System complete & tested w/Hall.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
1. Introduction 2. Magnetic field design Optimization of yoke configuration in several conf. Boundary conditions -
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
TE-CRG Activities D. Delikaris, TE-CRG.
O. Kester, NuSTAR annual meeting, 27/02/2013
Status of the PANDA Magnet Yoke Presented by E. Koshurnikov GSI, February 7, 2013.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
PANDA, GSI, Electrically Cooled Ge-Detectors development Status Report I. Kojouharov.
Panda Forward Dipole Magnet design status International Workshop on Antiproton Physics and Technology at FAIR November 2015 Budker Institute of Nuclear.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Status of the PANDA Solenoid Magnet Production in BINP
The Status of the CBM Experiment
High energy beam transport.
Status of the PANDA Solenoid Magnet Production in BINP
Neutrino Platform Proximity Cryogenics 62th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
Update on PANDA solenoid design
CBM magnet overview of the BINP work
Oleksiy Dolinskyy December 1st, 2014
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Status, Schedule and EVM for the test facility project
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Status of the PANDA Magnet mechanics (yoke & cryostat)
Solenoidal magnet. The status of manufacture, forthcoming works
Testing of SC Magnets Status - November 2010
6th BINP-FAIR-GSI Workshop,
PANDA Yoke of the Magnet
Status of work on the cryostat design
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
MICE CM31 Schedule summary
(Procurement, testing of magnets)
Status of the PANDA Magnet
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Challenges for FCC-ee MDI mechanical design
Status of the PANDA Solenoid Magnet Production in BINP
CMS Goal of the experiment
Teleconference ACS – FREIA 20th February 2018
Assembly, survey, alignment of the CBM Dipole Magnet
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Updated concept of the CBM dipole magnet
Status of the PANDA Solenoid Magnet Production in BINP
PANDA The conceptual design of the control Dewar
Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt
as a prototype for Super c-tau factory
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Budker Institute of Nuclear Physics,
Teleconference ACS – FREIA 19th June 2017
PANDA Cryostat and Yoke
UPPSALA UNIVERSITY_GERSEMI PROJECT
East Hall under construction
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016 PANDA Solenoid Magnet Status of work BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016

Coil winding procedures; An agreement on the status of work at BINP was achieved and include the production of PANDA solenoid magnet, assemblies and tests: PANDA yoke; Cold mass; Cryostat; Coil winding procedures; Electrical, control and safety system (with CERN collaboration); Assembly procedures at BINP; Cold and magnet tests at BINP; Assembly at FAIR.

Yoke, Platform and Frame

BINP received the specification of Yoke, Platform and Frame of PANDA detector on May 2015. According this specification we began work with BINP design department, technology department, BINP workshop and Russian plants. The last 3D models from February 2016

3D model of the Yoke, Platform and Frame .

BINP prepared assembly drawings of the one octant of Yoke with all requirement for the first variant of yoke design and for the second one. BINP carried out a few meetings with technical specialists of Russian plants. Next step: preparation of documents for a call for tender in Russian Federation.

Assembly drawing of the octant of Yoke with 12 layers of muon chambers

Assembly drawing of the octant of Yoke with 12 layers of muon chambers

The last assembly with 11 layers of muon chambers BINP received the new sketch of Yoke of PANDA detector on February 2016.

The last assembly drawing with 11 layers of muon chambers

The last assembly drawing with 11 layers of muon chambers

According this drawings the cost of yoke with frames and platform was estimated. Schedule of manufacturing and delivery of Yoke:   Start of works 10.2016 Design works till 04.2017 Purchase raw material and instruments from 01.2017 till 01.2018 Manufacturing from 04.2017 till 06.2018 Tests in Novosibirsk side 09.2018 – 09.2019 Delivery to GSI according to contract Assembly and tests in GSI side according to contract

Cryostat and Valve Box

3D model of the Cryostat and Valve Box.

Assembly drawing of the Cryostat

BINP work in the near future, 2016: Agreement of the Technical Specification of Cryostat, cold mass, coil winding procedures, assemblies and tests; Cryogenic scheme should be approved together with CERN; Instrumentation should be approved together with CERN; Preliminary assembling drawings of Cryostat with coil; Preliminary technologic work; Manufacture and tests of PANDA solenoid magnet will be made at BINP.

Conclusion Manufactured assembly drawings of one octant are ready; Preliminary discussions with plants to produce of yoke held; Costs of Yoke, cryostat and coil are estimated; It is needed to prepare Technical Specification for delivery of PANDA solenoid magnet; It is planned to sign of contract with FAIR to delivery of PANDA solenoid magnet at September 2016

Thank for you attention!