PANDA Collaboration Meeting , BINP Sergey Pivovarov.

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

Rosier Ph. – IPNO – Detector Dpt. – 27/05/2011APRIME HPS collaboration meeting 1/24 1- Vacuum chamber proposal 1.1- Stainless steel chamber design and.
BaBar: The Detector Richard F Boyce 21 October 2003.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Joint Institute for Nuclear Research Further optimization of the solenoid design A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov, A.Vodopianov GSI, Darmstadt,
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
IPN Lyon ILD Mechanical structure April 2012 DHCAL Assembly, Tooling, Cooling J.C Ianigro - IPN Lyon -
10/28/2015Pierre Moyret1 Production of SQXF Magnet Components: Return on experience P.MOYRET EN-MME-FS.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
DHCAL m3 module Ciemat status Enrique Calvo Alamillo EVO meeting 1 July 2010.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
Hcal Geometry and Assembly Videoconference January 2008, 24th.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
Joint Institute for Nuclear Research Deformations and stresses in the flux return yoke A.Efremov, Yu.Lobanov, A.Makarov Darmstadt,
PANDA Yoke unsolved Interface problems Presented by E. Koshurnikov (Dubna) December 9, 2011, GSI.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
Kitakami Side AHCAL Assembly or anywhere in any detector.
Panda Forward Dipole Magnet design status International Workshop on Antiproton Physics and Technology at FAIR November 2015 Budker Institute of Nuclear.
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
STEP 1: ASSEMBLE ANGLE PLATES
S.Movchan Straw manufacturing and QC
Status of the PANDA Solenoid Magnet Production in BINP
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
PANAGIOTIS FARANTATOS(TE/MSC-MNC)* WP3, ESR 4: New Magnet
Status of the PANDA Magnet mechanics (yoke & cryostat)
LBNF CAD models, Drawings and Component list
Platform Design for the Target Spectrometer using Heavy-Weight Rollers J. Lühning, GSI Darmstadt, Three design goals for Platform: Low construction.
Introduction BaBar Components The Problem IFR Upgrade: 2004 & 2005
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
Update of MVD services and requests
Hcal Geometry and Assembly
Present status of the flux return yoke design
Status of design and production of LEP connection cryostat
Status of the Mechanics at Ciemat.
PANDA Yoke of the Magnet
MICE Partial Return Yoke Mechanical Design
Status of works on the Collaboration Contract between IHEP and FAIR
Status of straw production straw module assembling
ERMC/RMM activities May 2017
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
Structure and etc Shoji Uno (KEK) at B2GM
SiD Muon Yoke Structure - Deformation Studies -
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Status of the PANDA Magnet
FRESCA2 Update on the dipole design and new calculations
STEP 1: ASSEMBLE ANGLE PLATES
Pierre-Alexandre Thonet
ILD-0 overall dimensions C.Clerc ILD meeting, Seoul 17/02/09
Status of the PANDA Solenoid Magnet Production in BINP
Assembly, survey, alignment of the CBM Dipole Magnet
Status of the PANDA Solenoid Magnet Production in BINP
PANDA The conceptual design of the control Dewar
as a prototype for Super c-tau factory
Neutron guide Shielding Concept
ISO view of pipe w/ individual EC detector installed
Budker Institute of Nuclear Physics,
After service guide for changing PCB
PANDA Cryostat and Yoke
BaBar LST Upgrade Richard F Boyce
Presentation transcript:

PANDA Collaboration Meeting 04-08.09.2017, BINP Sergey Pivovarov.

PANDA Yoke of the Magnet Status of work PANDA Collaboration Meeting 04-08.09.2017, BINP, Sergey Pivovarov.

3D model of the Magnet, Yoke, Platform and Frame. The main parts of the detector PANDA for production at BINP

Dimensions of the Assembling Magnet, Yoke and Frame. The total weight of the Magnet, Yoke and Frame is ~335 t.

Configuration 12th layers of Yoke For a successful insertion of the muon chambers it was removed one sheet of barrel part of the yoke and increased the gap between the layers up to 35 mm. It was increased the gap to 35 mm in the door too.

New Barrel part of the Yoke of the PANDA Detector After contact with the plant it was proposed to change the design of the octants of the yoke.

The old design of the octant of the Yoke The Octant consists of the plates and bars. The bars connect the plates of the octant by welding. Disadvantage of such design: 1. A lot of welds. 2. Final machining on the surface of welded joints. It's very bad for a tools. 3. Octant construction is not so rigid.

The modified octant of the Yoke The bars was replaced by a side plates. The side plates are manufactured using water cutting machine. Advantage of such design: The number of welds is reduced. Final machining on the surface of the side plates (not welded joints). 3. Octant construction is more rigid.

The Octant of the Yoke of the PANDA Detector For moving, rotation, assembling to be used the ears which will be removed after final assembly

Drawing of the Octant.

Drawing of the Octant.

Drawing of the Octant.

Drawing of the Octant.

Drawing of the Octant.

3D-Model of the Front Door of Yoke. For moving, rotation and assembling the doors to be used the ears which will be removed after final Assembly (if necessary).

Drawing of the Front Door.

Drawing of the Front Door.

Drawing of the Front Door.

3D-Model of the Back Door of Yoke.

Drawing of the Back Door.

Drawing of the Back Door.

Drawing of the Back Door.

Drawing of the Back Door.

Drawing of the Back Door.

Beam of the support of Yoke.

Drawing of the Beam.

Drawing of the Beam.

Drawing of the Beam.

Drawing of the Beam.

3D model of the Magnet, Yoke, Platform and Frame.

Conclusion The drawings of the main assemblies will be ready on September 15. PDR – end of September. All drawings will be ready on the end of October. FDR – beginning of November. Start of production – December.

Thank you for your attention!