Naming convention Rules

Slides:



Advertisements
Similar presentations
LINAC4 and 3 MeV test stand at CERN
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Linac 4 PSB BI LTB LT L4T m from PIMS to foil: m new line (to BHZ20) m present Linac2 line Active elements : 4+2bendings; quads,
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
Injector De-cabling Project Project Team Meeting #
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
Linac4 and SPL Linac4 and SPL R. Garoby for the linac team.
J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Implementation Plan WBS exists Working on a “bottoms up” cost estimate The following.
1 1. Some recent views ( ) 2 Linac tunnel
LINAC4 COMMISSIONING A.Lombardi BCC 8-19 Nov 09 Linac4 BCC Nov 2009Alessandra Lombardi.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
MEF - Machines & Experimental Facilities Linac4 project EN/MEF roles & responsibilities EN/MEF group meeting October J.Coupard1.
THE LHC INJECTORS UPGRADE PROJECT - Organisation Malika Meddahi for Roland Garoby and the LIU Project Team.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Linac4 Status 1 M. Vretenar sLHC public event
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
LIU Day – 11 th april 2014 ALESSANDRA LOMBARDI LINAC4 COMMISSIONING OVERVIEW.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Ch. Vuitton – BE/BI Presented by R. Veness – BE/BI 18th October
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
European Organization For Nuclear Research PS2 Naming Conventions: the Options Ronny Billen 15 June 2009 Accelerators and Beams Department Controls Group.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
Booster identification/disconnections Follow-up Enlarged project meeting, E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
Mid Term Review Meeting, 26 September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
LIU-PSB Overview K. Hanke for the LIU-PSB Working Group K. Hanke, LIU-2011, 25 Nov 2011.
Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
WBS2.11 Vacuum systems G.Vandoni …brainstorming presentation… VAT Technical & Scientific7 th July 2008.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
RISK ASSESSMENT IN THE NEXT INJECTORS COMPLEX MACHINE PROTECTION WORKSHOP ANDREA APOLLONIO TE-MPE-PE A. Apollonio TE-MPE-PE Thanks to: J.B. Lallement,
ESS Front End diagnostic
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
Vacuum Considerations on ESS-DTL Carlo Roncolato 06/09/2012 Istituto Nazionale Fisica Nucleare Laboratori Nazionali di Legnaro.
Status and Future Perspective of the HIE-ISOLDE Project CERN, November 19-20, 2012
Linac4 status and perspectives
LIU – EVM status and next steps
Experience with beam instrumentation at Linac4
Linac4 M. Vretenar for the Linac4 design team
Linac4 Beam Characteristics
LIU – EVM status and next steps
Accelerator layout > 1000 components (almost 300 magnets and power converters, 153 beam diagnostic devices, about 400m of vacuum pipes, a not neglectable.
PS Booster Energy Upgrade
LINAC4 Vacuum Control System Review
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
Planning and Installation
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
C.Carli Budget and Planning ELENA Project Review, 15th October 2013
Update on the Ethernet Network Installation Campaign
WPs concerned by L4 connection:
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
HIE-ISOLDE Project: Planning & Resources
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
LINAC4 commissioning plans etc.
Advanced Research Electron Accelerator Laboratory
commissioning and measurements
Beam Line to the HiRadMat Test Facility
Ion Source and LEBT control system topology, Interlock strategy
ISRC and LEBT Vacuum System Design
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
Presentation transcript:

Naming convention Rules PS Complex machine Layout component name L 4 X . Machine Sector L= Low energy D= DTL C=CDTL P=PIMS T=Transfer Line PS Identifier Girder Tank Cell Progression Number

Source &LEBT: L4L girder 01 L4L.NFHR.0110 H- source L4L.VGP.0115 Penning gauge L4L.VGR.0115 Pirani gauge L4L.VPG.0120 Pumping Group L4L.VPG.01125 L4L.MLF.0130 solenoid1 L4L.MCHV.0135 stererer H&V L4L.TDI.0140 Beam stopper L4L.TDI.0145 L4L.BIF.0150 Faraday Cup L4L.BPS.0155 SEM Grid L4L.VVI.0160 gas injection valve L4L.MKV.0165 Kicker Vertical L4L.VPG.0170 L4L.VGP.0175 L4L.VGR.0175 L4L.VVGS.0180 Sector Valve L4L.BCT.0185 Current Transformer L4L.MLF.0190 solenoid2 L4L.MCHV.0195 Source &LEBT: L4L girder 01

Assumed convention: The quadrants (Trigonometric convention) L4L.ACRTP.0263 Tune piston 4th quad L4L.VF.0265 Vcuum port 1st quad (spare) L4L.VF.0266 Vcuum port 2nd quad (spare) L4L.VF.0267 Vcuum port 3rd quad L4L.VF.0268 Vcuum port 4th quad L4L.VPI.0267 Vacuum pump 3rd quad L4L.VPI.0268 Vacuum pump 4th quad L4L.ACRTP.0270 Tune piston 1st quad L4L.ACRTP.0271 Tune piston 2st quad L4L.ACRTP.0272 Tune piston 3rd quad L4L.ACRTP.0273 RFQ: L4L girder 02 Assumed convention: The quadrants (Trigonometric convention) are numbered seen by the RFQ beam input side.

Chopper: L4L girder 03 L4L.MQD.0310 type III L4L.BCT.0312 Current Transformer L4L.MQF.0314 L4L.VGP.0316 Penning gauge L4L.VGR.0318 Pirani gauge L4L.ACB.0320 Buncher cavity L4L.ACBTA.0322 Buncher tune actuator L4L.MQD.0324 L4L.BWS.0326 Fast Wire scanner L4L.MQF.0328 L4L.ACF.0330 Chopper cavity L4L.VPI.0332 Ion pump L4L.MQD.0334 type vII L4L.ACF.0336 L4L.VGP.0338 L4L.VGR.0340 L4L.MQD.0342 L4L.VPG.0344 Pumping group L4L.ACB.0346 Buncher cavity L4L.ACBTA.0348 Buncher tune actuator L4L.MCHV.0350 steerer H&V L4L.MQF.0352 type IX L4L.BPM.0354 Beam position monitor L4L.BWS.0356 Fast wire scanner L4L. VPI.0358 Ion Pump L4L.TC.0360 Collimator L4L.MQD.0362 type IV L4L.MQF.0364 Type IV L4L.VGP.0366 Penning gauge L4L.VGR.0368 Pirani gauge L4L.ACB.0370 L4L.ACBTA.0372 L4L.MQD.0374 type III L4L.BCT.0376 Current transformer L4L.MQF.0378 L4L.MCHV.0380

DTL: L4D Tank 1 L4D.MQDP.0130 Quadrupole 1; L4D.MQDP.0131 L4D.MQFP.0132 Quadrupole 3; L4D.MQFP.0133 Quadrupole 4; L4D.MQDP.0134 Quadrupole 5; L4D.MQDP.0135 Quadrupole 6; L4D.MQFP.0136 Quadrupole 7; L4D.MQFP.0137 Quadrupole 8; L4D.MQDP.0138 Quadrupole 9; L4D.MQDP.0139 Quadrupole 10; L4D.MQFP.0140 Quadrupole 11; L4D.MQFP.0141 Quadrupole 12; L4D.MQDP.0142 Quadrupole 13; L4D.MQDP.0143 Quadrupole 14; L4D.MQFP.0144 Quadrupole 15; L4D.MQFP.0145 Quadrupole 16; L4D.MQDP.0146 Quadrupole 17; L4D.MQDP.0147 Quadrupole 18; L4D.MQFP.0148 Quadrupole 19; L4D.MQFP.0149 Quadrupole 20; L4D.MQDP.0150 Quadrupole 21; L4D.MQDP.0151 Quadrupole 22; L4D.MQFP.0152 Quadrupole 23; L4D.MQFP.0153 Quadrupole 24; L4D.MQDP.0154 Quadrupole 25; L4D.MQDP.0155 Quadrupole 26; L4D.MQFP.0156 Quadrupole 27; L4D.MQFP.0157 Quadrupole 28; L4D.MQDP.0158 Quadrupole 29; L4D.MQDP.0159 Quadrupole 30; L4D.MQFP.0160 Quadrupole 31; L4D.MQFP.0161 Quadrupole 32; L4D.MQDP.0162 Quadrupole 33; L4D.MQDP.0163 Quadrupole 34; L4D.MQFP.0164 Quadrupole 35; L4D.MQFP.0165 Quadrupole 36; L4D.MQDP.0166 Quadrupole 37; L4D.MQD.0210 Quadrupole 38;

DTL: L4D Tank 2 L4D.MCHV.0220 steerer H&V L4D.MQFP.0230 Quadrupole 2-1; L4D.MQDP.0231 Quadrupole 2-2; L4D.MQFP.0232 Quadrupole 2-3; L4D.MQDP.0233 Quadrupole 2-4; L4D.MQFP.0234 Quadrupole 2-5; L4D.MQDP.0235 Quadrupole 2-6; L4D.MQFP.0236 Quadrupole 2-7; L4D.MQDP.0237 Quadrupole 2-8; L4D.MQFP.0238 Quadrupole 2-9; L4D.MQDP.0239 Quadrupole 2-10; L4D.MQFP.0240 Quadrupole 2-11; L4D.MQDP.0241 Quadrupole 2-12; L4D.MQFP.0242 Quadrupole 2-13; L4D.MQDP.0243 Quadrupole 2-14; L4D.MQFP.0244 Quadrupole 2-15; L4D.MQDP.0245 Quadrupole 2-16; L4D.MQFP.0246 Quadrupole 2-17; L4D.MQDP.0247 Quadrupole 2-18; L4D.MQFP.0248 Quadrupole 2-19; L4D.MQDP.0249 Quadrupole 2-20; L4D.MQFP.0250 Quadrupole 2-21; L4D.MQDP.0251 Quadrupole 2-22; L4D.MQFP.0252 Quadrupole 2-23; L4D.MQDP.0253 Quadrupole 2-24; L4D.MQFP.0254 Quadrupole 2-25; L4D.MQDP.0255 Quadrupole 2-26; L4D.MQFP.0256 Quadrupole 2-27; L4D.MQDP.0257 Quadrupole 2-28; L4D.MQFP.0258 Quadrupole 2-29; L4D.MQDP.0259 Quadrupole 2-30; L4D.MQFP.0260 Quadrupole 2-31; L4D.MQDP.0261 Quadrupole 2-32; L4D.MQFP.0262 Quadrupole 2-33; L4D.MQDP.0263 Quadrupole 2-34; L4D.MQFP.0264 Quadrupole 2-35; L4D.MQDP.0265 Quadrupole 2-36; L4D.MQFP.0266 Quadrupole 2-37; L4D.MQDP.0267 Quadrupole 2-38; L4D.MQFP.0268 Quadrupole 2-39; L4D.MQDP.0269 Quadrupole 2-40; L4D.MQFP.0270 Quadrupole 2-41; L4D.MQDP.0271 Quadrupole 2-42; L4D.MQFP.0272 Quadrupole 2-43; DTL: L4D Tank 2

DTL: L4D Tank 3 L4D.MCHV.0310 steerer H&V L4D.MQD.0320 Quadrupole 3-1; L4D.MQFP.0330 Quadrupole 3-2; L4D.MQDP.0331 Quadrupole 3-3; L4D.MQFP.0332 Quadrupole 3-4; L4D.MQDP.0333 Quadrupole 3-5; L4D.MQFP.0334 Quadrupole 3-6; L4D.MQDP.0335 Quadrupole 3-7; L4D.MQFP.0336 Quadrupole 3-8; L4D.MQDP.0337 Quadrupole 3-9; L4D.MQFP.0338 Quadrupole 3-10; L4D.MQDP.0339 Quadrupole 3-11; L4D.MQFP.0340 Quadrupole 3-12; L4D.MQDP.0341 Quadrupole 3-13; L4D.MQFP.0342 Quadrupole 3-14; L4D.MQDP.0343 Quadrupole 3-15; L4D.MQFP.0344 Quadrupole 3-16; L4D.MQDP.0345 Quadrupole 3-17; L4D.MQFP.0346 Quadrupole 3-18; L4D.MQDP.0347 Quadrupole 3-19; L4D.MQFP.0348 Quadrupole 3-20; L4D.MQDP.0349 Quadrupole 3-21; L4D.MQFP.0350 Quadrupole 3-22; L4D.MQDP.0351 Quadrupole 3-23; L4D.MQFP.0352 Quadrupole 3-24; L4D.MQDP.0353 Quadrupole 3-25; L4D.MQFP.0354 Quadrupole 3-26; L4D.MQDP.0355 Quadrupole 3-27; L4D.MQFP.0356 Quadrupole 3-28; L4D.MQDP.0357 Quadrupole 3-29; L4D.MQFP.0358 Quadrupole 3-30; L4D.MQDP.0359 Quadrupole 3-31; L4D.MQFP.0360 Quadrupole 3-32; DTL: L4D Tank 3

CDTL: L4C Tank 4 Tank 1 Tank 5 Tank 2 Tank 6 Tank 3 Tank 7 L4C.MQF.0410 Quadrupole 10; L4C.MQD.0430 Quadrupole 11; L4C.MQF.0450 Quadrupole 12; CDTL: L4C Tank 1 Tank 5 L4C.MQD.0110 Quadrupole 1; L4C.MCHV.0120 steerer 1; L4C.MQF.0130 Quadrupole 2; L4C.MQD.0150 Quadrupole 3; L4C.MQD.0510 Quadrupole 13; L4C.MCHV.0520 steerer 3; L4C.MQF.0530 Quadrupole 14; L4C.MQD.0550 Quadrupole 15; Tank 2 Tank 6 L4C.MQF.0610 Quadrupole 16; L4C.MQD.0630 Quadrupole 17; L4C.MQF.0650 Quadrupole 18; L4C.MQF.0210 Quadrupole 4; L4C.MQD.0230 Quadrupole 5; L4C.MQF.0250 Quadrupole 6; Tank 3 Tank 7 L4C.MQD.0310 Quadrupole 7; L4C.MCHV.0320 steerer 2; L4C.MQF.0330 Quadrupole 8; L4C.MQD.0350 Quadrupole 9; L4C.MQD.0710 Quadrupole 19; L4C.MCHV.0720 steerer 4; L4C.MQF.0730 Quadrupole 20; L4C.MQD.0750 Quadrupole 21;

PIMS: L4P 1…6 7…12 L4P.MQF.0110 Quadrupole 1; L4P.MCHV.0120 steerer 1; L4P.MQD.0210 Quadrupole 2; L4P.MCHV.0220 steerer 2; L4P.MQF.0310 Quadrupole 3; L4P.MCHV.0320 steerer 3; L4P.MQD.0410 Quadrupole 4; L4P.MCHV.0420 steerer 4; L4P.MQF.0510 Quadrupole 5; L4P.MCHV.0520 steerer 5; L4P.MQD.0610 Quadrupole 6; L4P.MCHV.0620 steerer 6; L4P.MQF.0710 Quadrupole 7; L4P.MCHV.0720 steerer 7; L4P.MQD.0810 Quadrupole 8; L4P.MCHV.0820 steerer 8; L4P.MQF.0910 Quadrupole 9; L4P.MCHV.0920 steerer 9; L4P.MQD.1010 Quadrupole 10; L4P.MCHV.1020 steerer 10; L4P.MQF.1110 Quadrupole 11; L4P.MCHV.1120 steerer 11; L4P.MQD.1210 Quadrupole 12; L4P.MCHV.1220 steerer 12;

Transfer Line: L4T L4T.MQF.1200 last PIMS ????? L4T.MBH.0150 horiz bending L4T.MQD.0210 Q1 L4T.MQF.0220 Q2 L4T.MBH.0250 L4T.MCHV.0260 STEERER h&v L4T.MQD.0310 Q3 L4T.MQF.0320 Q4 L4T.TS?.0355 Beam Stopper L4T.MCHV.0360 L4T.MQD.0410 Q5 L4T.MQF.0420 Q6 L4T.MCHV.0460 L4T.MQF.0510 Q7 L4T.MQD.0520 Q8 L4T.MCHV.0560 STEERER h&v L4T.MQF.0610 Q9 L4T.MQD.0620 Q10 L4T.MBV.0650 beNDING v L4T.MQD.0710 Q11 L4T.MQF.0720 Q12 L4T.MQD.0730 Q13 L4T.MBV.0750 L4T.MCHV.0760 L4T.MQF.0810 Q14 L4T.MQD.0820 Q15 L4T.MQF.0910 Q16 L4T.MQD.0920 Q17 OLD line BHZ20

L I N A C 4 WP PRESENTED WP to be PRESENTED New WP to be PRESENTED 1. Management, M. Vretenar + core team 1.1 Orphans equipments, R. Maccaferri, TE/MSC 2. Linac Systems 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2.1 RFQ Funct. design, Commissioning, C. Rossi, BE/RF 2.2 Radio Frequency Quadrupole 2.2.2 RFQ Mech. design, Fabrication, S. Mathot, EN/MME 2.3 Chopper Line, A. Lombardi, BE/ABP 2.4.1 Drift Tube Linac, S. Ramberger, BE/RF 2.4 Accelerating Structures, F. Gerigk, BE/RF 2.4.2 CCDTL and PIMS, F. Gerigk, BE/RF 2.5 Linac Beam Dynamics, A. Lombardi, BE/ABP 2.6.1 Low Level RF Systems, P. Baudrenghien, BE/RF 2.6 Radio Frequency Systems 2.6.2 High Power RF Systems, O. Brunner, BE/RF 2.7 Beam Instrumentation, U. Raich, BE/BI 2.6.3 Slow Tuning and Interlocks, L. Arnaudon, BE/RF 2.8 Transfer Line, S. Maury BE/ABP 2.6.4 Buncher Amplifiers, J. Broere, BE/RF 2.9 Magnets 2.9.1 Magnet Design and Procurement, T. Zickler, TE/MSC 2.10 Power Converters, C. De Almeida, TE/EPC 2.9.2 Magnetic Measurements, M. Buzio, TE/MSC 2.11 Vacuum Systems, G. Vandoni, TE/VSC WP PRESENTED 2.12 Control Systems, I. Kozsar, BE/CO 2.13 Beam Intercepting devices, Y. Kadi, EN/STI WP to be PRESENTED 2.14 Machine Interlocks, B. Puccio, TE/MPE LINAC4 WBS 2009 3. Booster Systems 3.1 Booster Injection Mod., W. Weterings,TE/ABT 3.2 PSB Beam Dynamics, C. Carli, BE/ABP New WP to be PRESENTED (still under definition) 4. Installation commiss. 4.1 Test Stand Operation, C. Rossi, BE/RF 4.2 Transport and Installation, C. Bertone, EN/HE 4.3 Survey, M. Jones, BE/ABP 4.4 Linac Commissioning, A. Lombardi, BE/ABP 4.5.1 PSB Commissioning to nominal, K. Hanke, BE/OP 4.5 PS Booster Commissioning 4.5.2 PSB Commissioning to ultimate, C. Carli, BE/ABP 5. Building, Infrastruct. 5.1 Building Design, Construction, L.A. Lopez, GS/SEM 5.2 Cooling and Ventilation, Y. Body, EN/CV Integration, Safety Coordination, S. Maury, BE/ABP 5.3 Electrical Systems, J. Pierlot, EN/EL Technical Coordination, R. Maccaferri, TE/MSC 5.4 Access Systems, D. Chapuis, GS/ASE

L I N A C 4 ONLY 12 over 26 registered !!!!! LINAC4 WBS 2009 1. Management, M. Vretenar + core team 1.1 Orphans equipments, R. Maccaferri, TE/MSC 2. Linac Systems 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2.1 RFQ Funct. design, Commissioning, C. Rossi, BE/RF 2.2 Radio Frequency Quadrupole 2.2.2 RFQ Mech. design, Fabrication, S. Mathot, EN/MME 2.3 Chopper Line, A. Lombardi, BE/ABP 2.4.1 Drift Tube Linac, S. Ramberger, BE/RF 2.4 Accelerating Structures, F. Gerigk, BE/RF 2.4.2 CCDTL and PIMS, F. Gerigk, BE/RF 2.5 Linac Beam Dynamics, A. Lombardi, BE/ABP 2.6.1 Low Level RF Systems, P. Baudrenghien, BE/RF 2.6 Radio Frequency Systems 2.6.2 High Power RF Systems, O. Brunner, BE/RF 2.7 Beam Instrumentation, U. Raich, BE/BI 2.6.3 Slow Tuning and Interlocks, L. Arnaudon, BE/RF 2.8 Transfer Line, S. Maury BE/ABP 2.6.4 Buncher Amplifiers, J. Broere, BE/RF 2.9 Magnets 2.9.1 Magnet Design and Procurement, T. Zickler, TE/MSC 2.10 Power Converters, C. De Almeida, TE/EPC 2.9.2 Magnetic Measurements, M. Buzio, TE/MSC 2.11 Vacuum Systems, G. Vandoni, TE/VSC ONLY 12 over 26 registered !!!!! 2.12 Control Systems, I. Kozsar, BE/CO 2.13 Beam Intercepting devices, Y. Kadi, EN/STI 2.14 Machine Interlocks, B. Puccio, TE/MPE LINAC4 WBS 2009 3. Booster Systems 3.1 Booster Injection Mod., W. Weterings,TE/ABT 3.2 PSB Beam Dynamics, C. Carli, BE/ABP 4. Installation commiss. 4.1 Test Stand Operation, C. Rossi, BE/RF 4.2 Transport and Installation, C. Bertone, EN/HE 4.3 Survey, M. Jones, BE/ABP 4.4 Linac Commissioning, A. Lombardi, BE/ABP 4.5.1 PSB Commissioning to nominal, K. Hanke, BE/OP 4.5 PS Booster Commissioning 4.5.2 PSB Commissioning to ultimate, C. Carli, BE/ABP 5. Building, Infrastruct. 5.1 Building Design, Construction, L.A. Lopez, GS/SEM 5.2 Cooling and Ventilation, Y. Body, EN/CV Integration, Safety Coordination, S. Maury, BE/ABP 5.3 Electrical Systems, J. Pierlot, EN/EL Technical Coordination, R. Maccaferri, TE/MSC 5.4 Access Systems, D. Chapuis, GS/ASE

Please, make un effort to write down your WP description using the right Template https://edms.cern.ch/cedar/plsql/doc.info?cookie=8151602&document_id=930015&version=6

Reminder: The WP 5.4 Access Systems will be presented by Louis Hammouti: Thursday June the 18th Room: 30-7-012 Time: 10h00