On-Site Leak Repair Dumisani Gubuza (M.Sc., M.Eng., Pr.Sci.Nat.)

Slides:



Advertisements
Similar presentations
2 nd International Conference Graz October, 10 th 2012 Techniques to save water quantity PP5 (LCA) PPs: LCA, LfULG, RNA.
Advertisements

May 18, 2005 Oakdale Irrigation District Water Resources Plan.
Regional Bulk Infrastructure Grant / Programme (RBIG) Grant and Policy
FEASIBILITY STUDIES INFORMATION SESSION. OVERVIEW  Background and approach the feasibility studies  Guidelines ♦Discussion of terms of reference ♦Sustainability.
RELIABLE SUPPLIERS Supply Chain Management and Procurement policies in place Supply Chain Management and Procurement policies in place Register all suppliers.
Pemerintahan Kota Bandung UNIVERSITAS PASUNDAN. POLICY GUIDELINE DEVELOPMENT ON ECO-EFFICIENT INFRASTRUCTURE.
Washington State Department of Health Division of Environmental HealthOffice of Drinking Water Mike Dexel Water Resources Policy Lead Municipal Water Law.
OUTCOMES AND STRATEGIC ISSUES FROM THE MCC WSLG 19 November
Case Study Leak Detection Program On Niue Island’s Water Resource.
IPN – Israel Water Week Improving the Water Service: The Case for Replicating Manila in Mexico Gerardo Angeles Castro Economic Development Network - IPN.
About Presentation About Rand Water Rand Water and MDGs Economic Policy and Implications Rand Water and its Role in Africa Conclusion.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
Water Performance of Buildings A study being conducted for DG ENV by Bio Intelligence Service in cooperation with BRE and ICLEI Water Resource Efficiency.
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
Systematic Municipal Water Use Accounting and GPCD Calculations John W. Longworth, P.E. -- Chief Water Use and Conservation Bureau NM Office of the State.
Applying scientific thinking in the service of society Water and Sanitation Low carbon cities meeting 04 – 06 October 2010.
Department of Water Affairs Water Requirements and Availability Reconciliation Strategy for Mbombela Municipal Area Water Conservation and Water Demand.
RAND WATER’s CONTRIBUTION TOWARDS SOCIO-ECONOMIC GROWTH THROUGH COMMUNITY DEVELOPMENT PROJECTS 18 OCTOBER 2006.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Developing a Non- Revenue Water Strategy
1 Presentation to the Portfolio Committee: Water & Environment Presentation by Mr Trevor Balzer Programme Manager: Special Projects 16 – 17 March 2010.
Alternative funding model for water conservation African Water Leakage Summit 7 September 2011, Midrand.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
STATE OF OREGON WATER EFFICIENCY STANDARDS PNWS-AWWA Conference Eugene, Oregon May 2014 Lisa Jaramillo Water Right Services Division Oregon Water Resources.
Water Conservation and Water Demand Management Progress with the Strategy Implementation 16 September 2010.
ILembe District Municipality Municipal Water Infrastructure Grant Projects and Project Readiness 13 TH SEPTEMBER 2013 iLembe District Municipality Municipal.
 About people in about households  About 67% of the households have an income less that R800 per month  About 60% households have yard.
Slide 1 Oakdale Irrigation District Water Resources Plan “What We’ve Learned” October 2005.
Presentation to the Portfolio Committee on Public Works 1 March 2016 GREEN BUILDING FRAMEWORK PROPERTY MANAGEMENT TRADING ENTITY.
Work Session Water Issues and Water Rate Study Topics: Fundamental Assumption Key Issues Areas of Concern / Focus Water Audit Water Meter Audit Water Rate.
A Sustainable Tourism Framework for the Caribbean Mercedes Silva Sustainable Tourism Specialist Caribbean Tourism Organization “Ma Pampo” World Ecotourism.
ETHEKWINI WATER & SANITATION: NON REVENUE WATER BRANCH YOUTH INNOVATION CHALLENGE Simon Scruton, Pr Eng, MSc. eThekwini Water and Sanitation Manager Non-Revenue.
@ContentsExecutive Summary Annexures A M A J U B A Umkhandlu Wesifunda District Municipality Distrik
Hydrology and Water Resources Engineering ( ) Government Engineering College Rajkot Civil Engineering Department Faculty Guide: Prof V.G.Yadav DROUGHT.
PILOT PROJECT ON NRW IN SHEETAL PARK AREA OF RAJKOT CITY IN GUJARAT Danish Water Forum AND Rajkot Municipal Corporation.
| Performance Based NRW Reduction Contracts The case of HoChiMinh City Bill Kingdom.
WATER DEMAND MANAGEMENT INITIATIVES RETROFITTING OF HOUSES.
Rand Water TARIFF CONSULTATION OCTOBER DWS / TCTA raw water pricing30 th September 2016 Customer consultation and information sharing Consultation.
CHIEF DIRECTOR: REGULATION October WHY IS REGULATION IMPORTANT? (VALUE CHAIN) To ensure the protection, use, development, conservation, management.
Asset Degradation Modelling at Townsville Water
Danube Water Conference 2017, Vienna
SC Rural Water Conference 2016
4/14/2018.
Managing future water resources
Overview of the CoJ Water & Sanitation Master Plan
Danube Water Conference, Vienna, May 2017
Presentation to the Portfolio Committee: Water & Environment
Water Loss Audit Findings (FY 13-14)
AMI Hidden Costs and Hidden Values
WATER SUPPLY & SEWERAGE AUTHORITY Bethlehem-Biet Jala-Biet Sahour
Housing Development Program (HDP) in Ethiopia
PRESENTATION TO SCOPA ON REVENUE SOURCES/ESKOM ACCOUNT – NALEDI LOCAL MUNICIPALITY (NW 392) 13 JUNE 2018.
Organisational NRW Management
WASTEWATER MANAGEMENT 19 September 2018
Presented by: Ms Siyabulela Bashe
INGONYAMA TRUST BOARD’S ANNUAL PERFORMANCE PLAN
Introduction to NRW Introduction to IWA Water Balance, NRW components and Performance indicators.
The State of Water Use Efficiency in South Africa
MASILONYANA LOCAL MUNICIPALITY
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Presentation to Water Services Forum by Kobie Mare 16 May 2018
City of Sunrise Wastewater Reuse Program
Ekurhuleni, South Africa
Gauteng Department of Local Government
STRENGTHENING/IMPROVING THE CAPACITY OF
DEPARTMENT OF DEVELOPMENTAL LOCAL GOVERNMENT AND HOUSING NORTH WEST
Professor Vasilis Kanakoudis
Presentation transcript:

Water Conservation and Water Demand Management in the City of Ekurhuleni: On-Site Leak Repair Dumisani Gubuza (M.Sc., M.Eng., Pr.Sci.Nat.) Rand Water Services Forum 24 May 2017

BACKGROUND

Ekurhuleni Water Infrastructure Reservoirs 73 Towers 32 Bulk Connections 186 Pipes (km) 11 448 Distribution Zones 124 Population (mill.) 3.5 Population Growth 2.5% W&S Dept. Staff 1 200

PLANNING

Water Demand Growth Scenarios

Prioritisation of DMAs from highest to lowest NRW Short Term: Revised DWA Target Saving for Ekurhuleni is 25,0 Mm³/annum within 5 years “Project15%” Sorted from highest to lowest NRW Medium Term: Top 25 DMAs are responsible for 80% of water losses Longer Term: Remainder

NRW and WUE Map

Business Plan for WDM

NRW Reduction Roadmap

SIV & NRW

STRATEGY REVIEW

WC/WDM initiatives over strategy period WC/WDM Objectives Actions NON-REVENUE WATER REDUCTION Real or Physical Loss Pipeline and Valve Assessment and Replacement Replacement of Mid-block Pipelines Pro-Active Leak Detection and Repairs Cathodic Protection of Steel Pipelines Sectorization of Distribution Areas Telemetry System Pressure Management “War on Leaks” Rapid Responses Apparent Loss Replacement of all aged Domestic Water Meters Consolidation & Replacement of all Large Water Consumer Meters Installation, Replacement & Maintenance of Water Meters Updating and cleanup of the meter data and billing database Reduce the level of unauthorised consumption. Unbilled Authorized Metering of all Informal Settlements Metering of all Unmetered Areas Metering of all Council buildings and facilities

WC/WDM initiatives over strategy period WC/WDM Objectives Actions ALTERNATIVE WATER RESOURCE DEVELOPMENT Promulgate wastewater reclamation policy and by-law. Conduct feasibility studies to identify feasible alternative water resource development opportunities. Implement feasible alternative water resource opportunities. Promote/advertise the use of alternative water resources. WATER RESOURCE CONSERVATION MEASURES Formulate and implement education and awareness campaigns to promote water conservation Formulate and adopt a Drought Management Plan Implement and enforce water restrictions as per by-laws and/or Drought Management Plan. Formulate and enforce regulations to reduce demand growth from new developments. Implement retrofitting and leak repair projects in indigent households Implement retrofitting and leak repair projects in areas with very high NRW and water losses. Encourage retrofitting in schools, industries, and the commercial sector. Reduce water consumption in Council buildings and facilities. INSTITUTIONAL ARRANGEMENTS Collaboration and co-ordination with the Finance and Corporate Legal Departments on accurate and consistent meter reading, billing, revenue collection and by-law enforcement; All critical positions to be filled to increase capacity to implement this strategy; Develop and implement a comprehensive training programme on WC/WDM for staff

Alternative Water Resources Options Rainwater and stormwater harvesting Treated Effluent Reuse Ground Water use Acid Mine Drainage

Acid Mine Drainage

Rain Water Harvesting

Treated Effluent Reuse Plant Discharge per day Effluent reused per day % of reused water to total discharge Receiving Entity Purpose Hartebeestfontein 45 000 m3 3 000 m3 7% Serengeti Golf Estate Irrigation of Golf Course Ancor 34 760 m3 17 760 m3 51% Sappi Production JP Marais 15 000 m3 430 m3 3% Department of Correctional Services Irrigation of agricultural lands Herbert Bickley 12 500 m3 270 m3 2% 150 m3 1% Instant Lawn Irrigation of Instant lawn Rondebult 36 000 m3 10 000 m3 28% Rondebult Bird Sanctuary Nature reserve

IMPLEMENTATION

On-Site Leak Repair Projects PROGRAMME CATEGORIES PROG. NO. DESCRIPTION 2013/14 2014/15 2015/16 2016/17 REAL / TECHNICAL LOSSES 1 Pipeline and Valve Assessment and Replacement X 2 Replacement of Mid-Block Pipelines 3 Pro-Active Leak Detection and Repairs - 4 Cathodic Protection of Steel Pipelines 5 Sectorisation of Distribution Areas  - 6 Telemetry System 7 Indigent Properties Leak Fixing 8 Leak Fixing & Meter Installation Project in Tsakane 9 Metering of all Informal Settlements -  10 Pressure Management -  X - X  X  APPARENT / COMMERCIAL LOSSES 11 Metering of all Unmetered Areas 12 Replacement of all aged Domestic Water Meters 13 Consolidation & Replacement of Large Water Consumer Meters 21 Installation, Replacement & Maintenance of Meters SUPPORTING SYSTEMS AND OTHER INITIATIVES 14 Integration of IMQS, EMIS, Asset Management & Venus   15 Communication, Awareness and Education Programme 16 Water Tariffs as an instrument to reduce NRW 17 Training 18 Document and Information Management System 19 Risk Register: Monitoring and Mitigation Plan 20 “War on Leaks” Rapid Responses Business Plan for WDM

Household Water Supply

On-site Leak Repair Msunduzi: 77.1% of low-income households (Smith & Green, 2005) Sebokeng and Evaton in Emfuleni: 80% of households (Wegelin, et al., 2009) 50 000 m3/day or 18 million m3/annum. Johannesburg: 67% of investigated properties (Lugoma, et al., 2012) 12 kl/month/household. top 10% with the highest leakage would reduce the leakage rate by 63% Tampa, Florida: demand dropped 46.3% after retrofitting (Mayer et al., 2004) Toilets are the highest culprits in water leaks (Mayer et al., 1999; 2004 and Britton et al., 2013) Leaking toilets – sewage treatment plants By-laws and policies do not allow for work in private properties.

SUSTAINABILITY??? On-site Leak Repair (Mckenzie & Wegelin, 2009) in numerous case studies, the projected savings through a range of water demand management interventions have either not been achieved or have proved to be unsustainable

Ekurhuleni Indigent Leak Repair Project Targeted 2010/2011 Financial Year Implementation Phases: Assess indigent household water consumption and prioritise Auditing and investigation (pre-assessment) Repair or replacement of leaking or damaged fixtures Quality assurance and post assessment Customer awareness Obtained Council approval (2005)

Assess Indigent Household Water Consumption 43 439 registered indigents as at September 2010 73.7% consumed above 9 kl per month 51.5% consumed above 15kl Project approach: Area Based and Top Consumers

Data Handling & Analysis A dataset comprising 473 indigent households that were repaired was obtained details of leak repair that was carried out monthly water consumption over 66 months (25 January 2009 to 25 June 2014) Households with less than 95% of monthly water consumption data were excluded from the dataset The final dataset analysed below thus comprised of 257 stands.

Repair or replacement of leaking or damaged fixtures

Consumption Pattern Analysis Consumption above 30 kl/month reduced from 30.7% to 10.5% in Year1; Consumption above 15 kl/month reduced from 56.8% to 36.7% in Year1;

Sustainability of Water Consumption Reduction Benefits? 32.72 29.52 16.11 17.15 19.12 More than 50% reduction in average in monthly water consumption; The June 2014 average consumption was ~42% lower than in June 2010; and ~65%  lower than what it may have been (54 kl/month ) had the project not been implemented.

Financial Efficacy of the Indigent Leak Repair Project Average cost per indigent household was R1 206.53 (ex. VAT) Benefit based on reduction in consumption x Rand Water tariff Description Cost (-) / Benefit (+) Nett Cost (-) / Benefit (+) Cost of project for 257 indigent households -R 310 078.21 End of Year 0 R 39 771.26 -R 270 306.95 End of Year 1 R 233 074.84 -R 37 232.11 End of Year 2 R 242 970.47 R 205 738.36 End of Year 3 R 233 199.74 R 438 938.10

Conclusion - Sustainability??? Extent of the reduction in leaks and water consumption Consumption above 30 kl/month reduced from 30.7% to 10.5% in Year 1; More than 50% reduction in average in monthly water consumption; Sustainability of the project benefits The June 2014 average consumption was ~42% lower than in June 2010; and ~65%  lower than what it may have been (54 kl/month ) had the project not been implemented. Financial efficacy: cost vs benefit The net benefit amounted to R438 938.10 at the end of the 3rd financial, payback was achieved early into the 2nd financial year. Toilets and taps most prolific sources of water leaks in indigent households;

Tsakane War on Leaks Project Outer Boundaries of “War on Leaks project intervention area shown in red Phase One: Wards 82, 83 & 84 11 500 stands (out of 43 000 stands)

EMM’s Objectives with the Project The Objectives of the Tsakane Project are as follows: To reduce the high levels of Water Losses in EMM by large scale Leak Fixing Project in the area with the highest NRW (88% in Tsakane). Maximise the utilization of LOCAL SMMEs, LOCAL Labour and CLOs (Management Contractor Contracting Model). Empowerment of the Community by providing Technical Training, Skills Development, Mentoring and Coaching. Eradicating the Backlog of Unmetered Areas in EMM (43 000 / 60 000 unmetered stands). Public Education & Awareness Campaign Enhanced Service Delivery in the area

TSAKANE : Reduction in Water Losses Achieved

Tsakane Meter Long-term Consumption History

Key Achievements of the War on Leaks Project Conversion of an unmetered area into a metered area 11 500 properties were metered Reduction in high water losses The project is currently saving EMM 4 096 656 Kl or R24.576 million per annum Enhanced service delivery The residents in Tsakane are now receiving a better level of water services resulting from the upgrading of the water infrastructure Job Creation: On average 123 people previously unemployed were recruited on a monthly basis. Empowerment via training The training provided on the Project has led to the empowerment of the Community by means of skills transfer and development.

IMPACT

SIV & NRW

SIV & NRW Financial Year System Input Volume (kl/annum) Difference from Previous Year (kl/annum) Change (%) 2012/13 346 582 721 7 839 969   2013/14 356 640 839 10 058 118 2.9 2014/15 364 906 484 8 265 645 2.3 2015/16 363 964 110 -942 374 -0.26 Apr 2017 340 550 313 -23 413 797 -6.43 Financial Year NRW (kl/annum) NRW (%) 2012/13 140 638 446 40.3% 2013/14 134 674 900 37.8% 2014/15 131 666 809 36.1% 2015/16 125 859 904 34.6% Apr 2017 117 016 091 34.4%

EMM Water Demand vs Vaal Recon Target

Conclusion Progress since June 2013: Reduction of the growth in water demand. 12.33% reduction in non-revenue water. EMM has met the Vaal Reconciliation Strategy Targets but the current momentum and traction has to be maintained. In line to meet the target of reducing NRW to 20% by 2023.

THANK YOU