IWAA2014, 13th – 17th October 2014, IHEP, Beijing

Slides:



Advertisements
Similar presentations
Research Instrumentation Special Interest Group Sensors & Instrumentation Knowledge Transfer Network Report on American Light Source Facilities Oliver.
Advertisements

Muon g-2 Inflector AEM Meeting 11/25/2013 Chris Polly Muon g-2 Project Manager.
July 2004 Use menu "View - Header & Footer" for Presentation title - Siglum - Reference Integrated CAD-Metrology and Alignment of Key Features of A380.
Metrology and pre-alignment of the components of CLIC in the PACMAN project S. W. Kamugasa, V. Vlachakis CLIC Workshop January 2015 CERN, Geneva,
SpatialAnalyzer Advanced Uncertainty Analysis
Beam Based Alignment of High Intensity Gamma Source (HIGS) Targets at Duke University Free Electron Laser Laboratory (DFELL) M. Emamian, Changchun Sun,
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
1 Institute of High Energy Physics 13/09/2010 Comparison and Study in Measurement Accuracy of Height Difference between Laser Tracker and Level Men LingLing.
Metrology for NCSX Steve Raftopoulos and the NCSX Metrology Team.
Design and Scheduling of Proton Therapy Treatment Centers Stuart Price, University of Maryland Bruce Golden, University of Maryland Edward Wasil, American.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
Mission Planning and SP1. Outline of Session n Standards n Errors n Planning n Network Design n Adjustment.
Electromagnetic radiation sources based on relativistic electron and ion beams E.G.Bessonov 1.Introduction 2.Spontaneous and stimulated emission of electromagnetic.
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
10/7/ Innovative Solutions International Satellite Navigation Division ION NTM 01 Capabilities of the WAAS and EGNOS For Time Transfer SBAS, an Alternate.
8/28/07RTML EDR KOM1 Cornell Plans for RTML EDR Work G. Dugan Cornell LEPP.
BROOKHAVEN SCIENCE ASSOCIATES BIW ’ 06 Lepton Beam Emittance Instrumentation Igor Pinayev National Synchrotron Light Source BNL, Upton, NY.
Implantation of N-O in Diamond
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
Introduction to Synchrotron Radiation
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
First results from the far-infrared beamline at the Canadian Light Source: High resolution analysis of acrolein in the 600 cm -1 region A.R.W. McKellar.
SPring-8 (1436 m) since 1997 XFEL (700 m) From 2011 Hiroaki Kimura 1,3 ), Masafumi Yamashita 2 ), Yusuke Maeda 2 ), Yoshifumi Tsukamoto 2 ), Noriyoshi.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
Synchrotron Far Infrared Spectroscopy : Higher resolution and longer wavelengths at the Canadian Light Source A.R.W. McKellar National Research Council.
Sector 0 To improve the performance of FACET, sectors 2-6 and (a total of 900m beam-line) were realigned using the laser alignment system as their.
10-meter Interferometer Results M. Woods (special thanks to Steve Myers and Tim Slaton) Jan. 31, 2000 Commissioning Setup System Noise Monte Carlo simulation.
The NOnA Experiment Survey of the NOvA Far Detector Gary Feldman
Managing the survey activities during the Long Shut-down 1 Dominique Missiaen D. Missiaen, Iwaa14, October 2014, IHEP, Beijing, China1.
1 BROOKHAVEN SCIENCE ASSOCIATES 12th International Workshop on Accelerator Alignment September 10-14, 2012 Fermilab, Batavia, Illinois, U.S.A NSLS-II Girder.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Smoothing Based on Best-fit.
Alignment of Insertion Device at Siam Photon Source
CEA - Irfu – Mois 2011 – 1 Cavity-string alignment experience in the EXFEL prototype cryomodule assembly Michel Fontaine CEA – SACLAY DSM/IRFU/SIS TTC.
THE APPLICATION OF TRACKER WITH SA IN ALIGNMENT OF HIRFL-CSR
MSc-Student Activities at the European XFEL
Application and Research on the 3-D adjustment of control network in particle accelerator Luo Tao
The Comparison Of API T3 And Leica AT401 in the Test and Survey
Recent developments on micro-triangulation
The Primary Control network of HLSⅡ
Workshop on Tau-Charm at High Luminosity
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
Preparing the SPS complex alignment for future LHC runs
Coupling Correction at the Australian Synchrotron
Schedule and Priorities 2018 / 2019
InterActions Meeting--- October 2006 Report from Cornell
Beam Optics Set-Up at SLAC End Station A
What would you do if you had one of the world’s most powerful x-ray sources in your backyard? Prof. Sol M. Gruner, Director Sol M. Gruner, Director.
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
ALIGNMENT STRATEGY OF SESAME T. Abu-Hanieh, SESAME, Jordan
LCLS Ultrafast Science Instruments
The Storage Ring Control Network of NSLS-II
XAFS Spectroscopy Katarina Norén 23/11/2018.
Operations Department
SPEAR Summer/Fall Downtime Alignment Schedule
Introduction of IHEP.
Marcin Zieliński Paweł Moskal Andrzej Kupść
Introduction of IHEP.
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
Leveling.
Transverse size and distribution of FEL x-ray radiation of the LCLS
Status of ELI Beamlines
INSTITUTE OF HIGH ENERGY PHYSICS CEPC Survey and Alignment
Integrated CAD-Metrology and Alignment of Key Features of A380 Wings
Presentation transcript:

IWAA2014, 13th – 17th October 2014, IHEP, Beijing Establishing Control Survey Network for Long Beamlines at Diamond Light Source William Hoffman DLS,UK IWAA2014, 13th – 17th October 2014, IHEP, Beijing

William Hoffman IWAA2014, 13th – 17th October 2014, IHEP, Beijing OUTLINE INTRODUCTION Measurement of Survey Network Pre-Analysis conclusion William Hoffman IWAA2014, 13th – 17th October 2014, IHEP, Beijing

INTRODUCTION Diamond Light Source is the UK’s National synchrotron 25 Operational Beamlines

I13& I14 Beamlines The I13 beamline comprises two branchlines(Imaging and Coherence) which provide complementary X-ray imaging techniques A Scanning Hard X-ray Nanoprobe beamline is to be built on sector I14 This beamline is dedicated to delivering very small beamsizes for phase-sensitive imaging and spectroscopy. The principal branch is scheduled to be ready for users in mid-2016 Switch between image and

IWAA2014, 13th – 17th October 2014, IHEP, Beijing The longest beamline at Diamond Light Source is 250m. IWAA2014, 13th – 17th October 2014, IHEP, Beijing

MEASUREMENT OF SURVEY NETWORK Transfer Storage Ring Datum 250m Baseline 23m

The SR datum was transferred to the I13 Optics Hutch(OH) at 13m and Experimental Hutch(EH) at 36m on the Experimental Hall Floor. A concern was that there could be a potential yaw (swing) error relative to the straight beamline. To enhance the network, several measurement setups were made from 2 operational beamline networks Beamline I18 and adjacent I12 would act as to act as a constraint to any swing error Switch slides All measurements were taken with a TDA5005 and imported to Spatial Analyzer(SA

IWAA2014, 13th – 17th October 2014, IHEP, Beijing SR Network I18 Network I12 Network P5 P6 P131 P141 P142 P137 P143 P145 P132 P136 P144 P133 P135 P134 IWAA2014, 13th – 17th October 2014, IHEP, Beijing

IWAA2014, 13th – 17th October 2014, IHEP, Beijing Measurement Setups IWAA2014, 13th – 17th October 2014, IHEP, Beijing

IWAA2014, 13th – 17th October 2014, IHEP, Beijing RESULTS 2D USMN Point Max Err Ux Uy Uz Umag P131 0.415 0.4 0.383 0.554 P132 0.17 0.465 0.361 0.589 P133 0.497 0.314 0.344 0.466 P134   0.386 0.565 0.684 P135 0.12 0.404 0.381 0.556 P136 0.647 0.302 0.321 0.441 P137 0.464 0.254 0.3 0.393 P5 0.41 0.185 0.232 0.297 P6 0.984 0.192 0.231 0.301 IWAA2014, 13th – 17th October 2014, IHEP, Beijing

IWAA2014, 13th – 17th October 2014, IHEP, Beijing PROOF Achieved First Light: Nov 2010 Number of users: 627 IWAA2014, 13th – 17th October 2014, IHEP, Beijing

IWAA2014, 13th – 17th October 2014, IHEP, Beijing In 2013 the Survey and Alignment team was invited to discuss the positioning of a survey network for I14 beamline IWAA2014, 13th – 17th October 2014, IHEP, Beijing

IWAA2014, 13th – 17th October 2014, IHEP, Beijing Using CAD drawings of building elevations and contours the positions and sightlines of the pillars were established Beam in天河way IWAA2014, 13th – 17th October 2014, IHEP, Beijing

IWAA2014, 13th – 17th October 2014, IHEP, Beijing Pre-Analysis First took all the TDA5005 measured data from I13 Beamline and run a pre-analysis using STAR*NET software MicroSurvey STAR*NET Station Coordinate Error Ellipses (Meters) Confidence Region = 68.26 Station Semi-Maj Semi-Min Azimuth P131 0.000495 0.000187 35-42 P132 0.000514 0.000329 37-19 P133 0.000258 36-15 P134 0.000645 0.000378 48-36 P135 0.000549 0.000243 36-38 P136 0.000245 36-36 P137 0.000219 35-28 P5 0.000462 0.000227 36-03 P6 0.000511 0.000255 34-53 IWAA2014, 13th – 17th October 2014, IHEP, Beijing

IWAA2014, 13th – 17th October 2014, IHEP, Beijing A second Pre-Analysis was run including the new pillar network for I14. The AT401 laser Tracker was used as the measurement instrument. The instrument uncertainties used for the simulation was previously obtained for the SR network surveys Station Coordinate Error Ellipses (Meters) Confidence Region = 68.26 Station Semi-Maj Semi-Min Azimuth P131 0.000174 0.000057 128-05 P132 0.00019 0.000099 130-17 P133 0.000193 0.00007 127-58 P134 0.000199 0.000094 129-27 P135 0.000197 0.000059 130-32 P136 0.000191 130-37 P137 0.000182 132-39 P141 132-31 P142 0.000188 0.000072 133-57 P143 0.000195 0.000077 136-48 P144 0.000196 131-20 P145 0.000058 130-40 P5 0.000124 0.000089 131-07 P6 0.00018 0.00009 160-39 IWAA2014, 13th – 17th October 2014, IHEP, Beijing

IWAA2014, 13th – 17th October 2014, IHEP, Beijing The Pre-Analysis show a significant improvement in the uncertainty simulation. IWAA2014, 13th – 17th October 2014, IHEP, Beijing

IWAA2014, 13th – 17th October 2014, IHEP, Beijing CONCLUSION The I13 beamline has taken beam successfully. As Beamline I14 is adjacent, it would be advantageous to improve the existing network at I13 by measuring it with the AT401 Laser Tracker The I14 Survey Network an then be established IWAA2014, 13th – 17th October 2014, IHEP, Beijing

IWAA2014, 13th – 17th October 2014, IHEP, Beijing Thank You ! IWAA2014, 13th – 17th October 2014, IHEP, Beijing