The Interaction Region

Slides:



Advertisements
Similar presentations
M. Sullivan Mini-workshop on the MEIC design Nov 2, 2012.
Advertisements

SuperB Damping Rings M. Biagini, LNF-INFN P. Raimondi, SLAC/INFN A. Wolski, Cockroft Institute, UK SuperB III Workshop, SLAC, June 2006.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
MAC Review December 13-15, 2004 IR Upgrade M. Sullivan 1 Interaction Region Upgrade M. Sullivan for the Machine Advisory Committee meeting December 13-15,
Super-B Factory Workshop January 19-22, 2004 Beam pipes M. Sullivan 1 Detector Beam Pipe Diameter Discussion M. Sullivan Super-B Factory Workshop Hawaii.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
Working Group 3 Summary M. Sullivan / Y. Funakoshi.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
1/18 The Distribution of Synchrotron Radiation Power in the IR C. H. Yu IR Overview SR Distribution in the IR The Protection of SR Power.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
Simulation of Beam-Beam Background at CLIC André Sailer (CERN-PH-LCD, HU Berlin) LCWS2010: BDS+MDI Joint Session 29 March, 2010, Beijing 1.
Page 1 Overview and Issues of the MEIC Interaction Region M. Sullivan MEIC Accelerator Design Review September 15-16, 2010.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
Interaction Region Issues M. Sullivan for the EIC User Group Meeting Jan. 6-9, 2016.
ILC EXTRACTION LINE TRACKING Y. Nosochkov, E. Marin September 10, 2013.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
ILC IP SR and PEP-II M. Sullivan for the ILC IR engineering workshop IRENG07 Sept 17-21, 2007.
Joint Belle SuperB Background Meeting Feb 9 – 10, 2012 SuperB SR bkgds 1 SR Backgrounds in SuperB M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni,
Initial Study of Synchrotron Radiation Issues for the CEPC Interaction Region M. Sullivan SLAC National Accelerator Laboratory for the CEPC14 Workshop.
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
Further SR Studies for the Electron Polarimeter M. Sullivan for the JLEIC Collaboration Meeting Oct. 5-7, 2016.
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
M Sullivan SuperB Workshop Elba, Italy May 31 - Jun 3, 2008
M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
M. Sullivan Apr 27, 2017 MDI meeting
M. Sullivan SuperB General Meeting Perugia, Italy June 15-20, 2009
Update of the SR studies for the FCCee Interaction Region
M. Sullivan for the SLAC SuperB Workshop Jan , 2009
M. Sullivan International Review Committee November 12-13, 2007
Beam-beam effects in eRHIC and MeRHIC
SuperB General Meeting XI
M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Large Booster and Collider Ring
E. Paloni, S. Bettoni, R. Pantaleo, M Biagini, et al.
Final Focus Synchrotron Radiation
2nd Workshop on a Super B-Factory INFN-LNF, Frascati, Italy
The PEP-II Interaction e+e- Factories Workshop
IR Design Update M. Sullivan For
The design of interaction region
Beam beam simulations with disruption (work in progress...)
Hongbo Zhu (IHEP, Beijing) On behalf of the CEPC Study Group
CEPC main ring magnets’ error effect on DA and MDI issues
Interaction Region Design Options e+e- Factories Workshop
SuperB CDR Machine P. Raimondi for the SuperB Team Paris, May 9, 2007.
Accelerator R&D Results from the B-factory
Design of Interaction Region
Sha Bai CEPC AP meeting Local double ring MDI Sha Bai CEPC AP meeting
IR Lattice with Detector Solenoid
IR Summary M. Sullivan For
Beam-Beam Effects in High-Energy Colliders:
Super-B Accelerator Overview
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Summary of the FCCee IR Workshop Jan 2017 at CERN
Energy Changes and the IR
Some of the Points Raised During my JLAB Visit
IR/MDI requirements for the EIC
SR Background Update for JLEIC
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Sha Bai CEPC AP meeting Work summary Sha Bai CEPC AP meeting
Presentation transcript:

The Interaction Region M. Sullivan 5th SuperB Workshop Paris May 9-11, 2007

Outline Design Issues IR Design Toward an improved design Summary

Detector Considerations Reasonable angular acceptance ±300 mrad Small radius beam pipe 10 mm radius Thin beam pipe SR backgrounds Rates comparable to PEP-II Few hits per crossing on Be beam pipe Little or no hits on nearby beam pipes

Detector Considerations (2) BGB backgrounds Keep nearby upstream bending to a minimum Suggest upstream bending further away from the detector (>10 m) to minimize the BGB integral Low vacuum pressure upstream of the detector

Detector Considerations (3) Luminosity backgrounds Beam lifetimes Radiative bhabhas Beam-beam Local HOM power Small diameter beam pipes trap higher frequencies Always get modes when two pipes merge to one

Accelerator parameters LER HER Energy (GeV) 4.0 7.0 Current (A) 3.95 2.17 No. bunches 3466 Bunch spacing (m) 0.63 Beat x* (mm) 20 20 Beta y* (mm) 0.2 0.2 Emittance x (nm-rad) 1.6 1.6 Emittance y (pm-rad) 4 4 Full crossing angle (mrad) 34 These parameters constrain or define the IR design

Summary of Present Design Crossing angle of ±17 mrad Beam pipe diameter of 20 mm at the end of QD0 for both beams (same size as IP pipe) This leaves enough room (~10 mm) to place a permanent magnet quadrupole and get the required strength (Using Br = 14 kG) We have placed small bending magnets between QD0 and QF1 on the incoming beam lines to redirect the QF1 SR The septum QF1 magnets for the outgoing beams are tilted in order to let the strong SR fans escape The outgoing beams B0 magnets are a C shape design in order to allow the strong SR fans to escape

IR design parameters Length Starts at Strength Comments L* 0.30 m 0.0 Drift QD0 0.46 m 0.30 m -820.6 kG/m Both HER and LER QD0H 0.29 m 0.76 m -820.6 kG/m HER only B00L 0.40 m -1.05 m -2.2 kG Incoming LER only B00H 0.40 m 1.05 m 1.5 kG Incoming HER only QF1L 0.40 m ±1.45 m 293.2 kG/m LER only QF1H 0.40 m ±1.45 m 589.1 kG/m HER only B0L 2.0 m ±2.05 m 0.3 kG LER only (sign?) B0H 2.0 m ±2.05 m 0.526 kG HER only (sign?) QD0 offset 6.00 mm Incoming HER QD0 offset 7.50 mm Incoming LER

SR Power Numbers The design (G3) has a total SR power comparable to PEP-II SR power in QD0 (kW) for beam currents of 1.44A HER and 2.5A LER No QD0 offsets Ver. F1 Ver. G3 PEP-II 3A on 1.8A Incoming HER 41 9 4 49 Incoming LER 28 1 1 16 Outgoing HER 41 152 93 49 Outgoing LER 28 67 55 16 Total 138 230 153 130

LER SR fans

HER SR fans

±1 meter

SR fans

Some SR background details We are using a gaussian beam distribution with a second wider and lower gaussian simulating the “beam tails” The beam distribution parameters are the same as the ones used for PEP-II We allow particles out to 10 in x and 35 in y to generate SR Unlike in PEP-II the SR backgrounds in the SuperB are dominated by the particle distribution at large beam sigma, so we are more sensitive to the exact particle distribution out there

Radiative Bhabhas The outgoing beams are still significantly bent as they go through QD0 Therefore the off-energy beam particles from radiative bhabhas will get swept out Knowing this, we will have to build in shielding for the detector

HER radiative bhabhas

LER radiative bhabhas

How to improve the design The best improvement would be to reduce the radiative bhabha background Note that there is only a small gain in beam separation from the strong outgoing bending because one has to allow the outgoing SR to escape (see slide 14) The only gain comes from the BSC moving away from the septum

Attempts to improve the design Three possibilities so far looked at Reduce the strength of the shared element Difficult to control beta functions (Can’t let the beta functions get too big) Try a high strength but very short and close to the IP shared element (minimal off-axis trajectories) Need a VERY high strength field to control beta functions High field still bends a beam even with a small off-axis traj. Eliminate the shared element Wants a maximum crossing angle (±24 mrads?) Can start one focusing magnet for one of the beams first and then follow with the focusing magnet for the other beam as soon as possible Still need to control beta functions Just got started on this option: no conclusion yet

More designs Other possibilities thought about A longer, weaker shared element End up with more bending at the outboard end Wants a minimal crossing angle Difficult to control beta functions Asymmetric IR (more like ILC?) Well controlled incoming beta functions Outgoing beta functions allowed to get bigger OK for ILC—not so good for storage rings

Summary We have an IR design that has acceptable SR backgrounds with a crossing angle of ±17 mrad and an energy asymmetry of 7x4 The BGB and coulomb scattered beam particles as a background need to be calculated and controlled (been done?) Radiative bhabha backgrounds are still high due to the strong bending of the outgoing beams The total SR power generated by the IR is high for the same reason. This can cause emittance growth. Especially vertical emittance growth since this is in a coupled region. A through exploration of parameter space is needed to find the best IR design