SUPER - T6 (Short slide version)

Slides:



Advertisements
Similar presentations
The Rossway Safeway Roof Safety Protection system is installed on top of roof purlins. The Rossway Safeway system consists of a platform deck with handrail.
Advertisements

Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Working at Height Learning Lite Module. Why do we need to understand the risks? In 2008/09 there were 35 fatalities, 4654 major injuries and a further.
1 Installation of Delphi Frame  ITS Installation.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Health and Safety Manual Section F9 Working at Height.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Be unobtrusive (avoid any interference with worker performance) Sample needs to be representative of the people and the work performed (e.g., demographics,
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Design for Elderly and Disabled Environments Making Homes More Comfortable and Accessible Doors Part 2 of 10.
Setting up the Ricoh C305 Press F5 to start the Presentation
34a. Bending/twisting the body and repetitive motions at work, selected occupations.
Learning the features. *Right Click Collections. *Choose Create New Collection *Name the Project.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
LAr sLHC detector engineering meeting MAX-PLANCK-INSTITUT FÜR PHYSIK München S.Vogt Page 1 1 Cost estimate for Cleanroom Radioprotection.
ASSO HEC 2001 Organisation & Responsibilities Chris Oram Oct 2001.
Preparation Of Carrot Explants 1.) Wash carrot taproots in warm, soapy water. Break or cut carrot taproots into pieces 7 cm or less in length. Be careful.
Radiation Protection optimisation 3D planning tools and their applicability to occupational exposure at a fusion power plant F.Vermeersch SCKCEN EFDA 24.
SOLDERING is the process of bonding together two or more metal parts with a thin alloy or soldering lead. Soldering is accomplished by heating the metals.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
CHEMICAL HANDLING Standard Operating Procedures and Personal Protective Equipment For REACT-OX® Program Applications.
Application: Telecommunications Electronics Housing Functional Requirements: Magnetic isolation, heat dissipation, easy assembly Competing Technologies:
Warm Up Week 2. Section 10.6 Day 1 I will write the equation of a circle. Circle Equation Must know the coordinate of the center and the radius.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
The Improvement of ALARA for the Steam Generator Maintenance Radiation Safety Department The 3 rd Plant, Ulchin Nuclear Power Site.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
CPA: Decisions, Issues, Next steps Francesco PIETROPAOLO CERN / INFN-Padova Field Cage CPA and Integration/Installation week, BNL, March 11th, 2016.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
Isolate isolated (A) Physically separated, electrically and mechanically, fromall sources of electrical energy. Such separationmay not eliminate the effects.
March 01 st, 2010 LAr sLHC Engineering – March 01 st, 2010 Prepared by Michel RAYMOND Follow up of the action list.
Mikhail Ovsienko TE-MPE-EE
Planning for Proto-DUNE PD Installation and Cabling at CERN
This picture shows what the wiring of a new alternator looks like
Light Bulb Changing Procedure
Welcome to: Air Conditioning Maintenance & Repair Course
BA6 – crab cavity activities in EYETS
News about the WA104 Programme
TIRE BALANCING.
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Update of experimental hall in Japanese mountain site
PROJECT 5C2 Total execution period of the project: 12 weeks.
Design Concept Update – Platform Moved on Hillman Rollers
Functional specification for the consolidated LHC dipole diode insulation system and consolidation strategy C. Scheuerlein on behalf of the LHC dipole.
Extension SR1 WP3 Electrical installations
The 11T cryo-assembly: summary of design and integration aspects
MR KITCHEN MODULAR KITCHEN DESIGNERS & MANUFACTURERS IN PUNE
Call to Fix Dell Printer Error Code
Installation plans from mid 2005
ATLAS Canada Collaboration
FOOD PREP & SERVICE COUNTERS
Adding 2-Digit Numbers Name: ___________________________
WARM UP AND EXIT SLIP NOTEBOOK
FOOD PREP & SERVICE COUNTERS
Integumentary System The Skin.
Cryomodule Assembly Plan
Inner DET. Integration Inner detector envelope Radial clearances.
Code of Practice for Access & Working Scaffolds
Superposition Principle of “Superposition”
The Improvement of ALARA for the Steam Generator Maintenance
Limited Streamer Tube Project Summary
Electrical and fluid couplings
Polarized 3He target installation
Man-Hours – Answer Maze
TERMS AND CONDITIONS   These PowerPoint slides are a tool for lecturers, and as such: YOU MAY add content to the slides, delete content from the slides,
Presentation transcript:

SUPER - T6 (Short slide version) TRIUMF - University of Victoria LAr week March, 2010 Objective: Remove the HEC-1 & HEC-2 modules in order to replace circuit boards located circumferentially on the HEC modules. Provide a stable platform to facilitate FCal handling and servicing. Requirements: Provide supporting structure for the HEC modules and FCal removal tooling. Incorporate a coordinated push/pull mechanism to manipulate HEC modules. Allow for worker access to key parts of the modules to facilitate circuit board replacement. Place suitable radiation shielding and/or exclusion barriers to reduce over exposure and protect workers. Have a clean room with a removable roof and change room incorporated onto T6.

SUPER T6 SUPPORT BASE page - 1

SUPER T6 SUPPORT BASE page - 2

SUPER T6 WARM & COLD COVERS REMOVED page - 3

SUPER T6 HEC2 HANDLING (SHIELDING + PUSH/PULL) page - 4

SUPER T6 HEC2 HANDLING page - 5

SUPER T6 HEC2 HANDLING (INNER SHIELDING ADDED) page - 6

SUPER T6 HEC2 PARKED page - 7

SUPER T6 HEC1 HANDLING (SHIELDING + PUSH/PULL) page - 8

SUPER T6 HEC1 & HEC2 PARKED page - 9

SUPER T6 HEC1 HEC2 SHED + SCAFFOLD page – 10

SUPER T6 CLEAN ROOM page - 11

SUPER T6 CLEAN ROOM + CHANGE ROOM + BRIDGE page - 12

SUPER T6 page - 13

SUPER T6 HEC1 HEC2 SIDE VIEW page - 14

SUPER T6 END VIEW (SHIELDING + PUSH/PULL) page - 15

SUPER T6 END VIEW (CLEAN ROOM + BRIDGE) page - 16

SUPER T6 END VIEW (+ SCAFFOLD) page - 17

SUPER T6 SHIELDING AND PUSH/PULL TOOLING page - 18

SUPER T6 SHIELDING PUSH/PULL TOOLING + CABLE TRAY page - 19

SUPER T6 HEC2 SHIELDING PUSH/PULL + CABLE TRAY page - 20

SUPER T6 SHIELDING AND PUSH/PULL TOOLING page - 21

SUPER T6 SHIELDS & PUSH/PULL TOOLING - OVERALL VIEW page - 22

SUPER T6 CIRCUIT BOARD ACCESS - SECTIONAL VIEW page - 23