LHC Performance Workshop (Chamonix 2016)

Slides:



Advertisements
Similar presentations
Status of Cryogenics at point 4 following the power cut L. Tavian 20 August 2011.
Advertisements

Cryogenic system in P4: Possible options S. Claudet & U. Wagner LHC Workshop, “Chamonix XlV” January 2005 (Mostly for RF & beam scrubbing)
Going towards LHC Run2 CRYOGENICS 5 th Evian Workshop 2-4 June 2014 SESSION 4 - Systems 2 - Status and commissioning plans (HW perspective) Krzysztof Brodzinski.
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
CRYOGENICS AND POWERING
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
H. Herzog, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN LARGE SCALE CRYOGENIC.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
1 Association Euratom-CEA P. Libeyre Pioneering superconductivity 23rd SOFT, Venice 21 September 2004 PIONEERING SUPERCONDUCTING MAGNETS IN LARGE TOKAMAKS.
Luigi Serio CRYOGENICS PERFORMANCE AND OPERATION L. Serio, on behalf of the LHC Cryogenics Operation and Cryogenics Performance Panel.
TE-CRG-OA Cryo availability for operation and scrubbing.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
Heat loads and cryogenics L.Tavian, D. Delikaris CERN, Cryogenics Group, Technology Department Accelerators & Technology Sector Friday, October 15, 20101HE-LHC'10.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
TE-CRG Activities D. Delikaris, TE-CRG.
LHC CRYOGENICS – new experience of run with increased beam energy and intensity Krzysztof Brodzinski CERN, Geneva, Switzerland With contribution from:
Cryogenics Fault Tree A. Niemi & E. Rogova. Contents 1.Introduction of the current tree structure 2.Failure rates observed in 2015 failure data 3.Unsure.
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
LHC Cryogenics From cool-down to 1st beams Serge Claudet (LHC Cryo OP), On behalf of cryo teams involved.
LHC Cryogenics, equipment & interventions around P3/P7 S. Claudet, “volunteer” for TE_CRG 16 Oct’14.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
LHC Performance Workshop LS1 Session Cryogenic system: strategy to achieve nominal performance and reliable operation J. Bremer, K. Brodzinski, J. Casas,
CONSOLIDATION day in view of HL-LHC Cryogenic aspects
M Chorowski, H Correia Rodrigues, D Delikaris, P Duda, C Haberstroh,
Minimum Hardware Commissioning – Disclaimer
Innovative He cycle Francois Millet.
Online Helium Inventory Monitoring of JLab Cryogenic Systems
N. Hasan1, P. Knudsen2 and V. Ganni2
Update of cryogenic activities
SPS cryogenic proximity equipment and SM18 validation
S. Claudet, Daniel Berkowitz & A. Perin (TE-CRG)
The LHC - Status Is COLD Is almost fully commissioned
CRYOGENICS – strategy, unavailability root causes and limitations
Update on HW commissioning
Coordination of Hardware Commissioning
Keeping LHC cold during LS periods Preliminary proposal
Hollow e- lens, Cryogenic aspects
MPE main activities planned for LS2
Daniel Berkowitz (TE-CRG)
Overview & baseline of LS2 and roadmap for CRG
The HIE—ISOLDE Cryogenic System, its Infrastructure and Considerations for Phase 3 O. Pirotte (TE/CRG)
BriXS – MariX WG 8,9 LASA December 13, 2017.
LHC status Benoit Salvant (Beams department, Accelerator and Beam Physics group) for the LHC complex teams With many thanks for their inputs to J. Boyd,
Mathew C. Wright January 26, 2009
Context at P8 Last slide presented at LMC early May 2012
SNS Cryoplant Commissioning Past Experiences
P8 cryogenic PLC problems on
Summary post TCC#54_02Aug’18
Review of hardware commissioning
Other arguments to train two sectors to 7 TeV
Cryogenic management of the LHC Run 2 dynamic heat loads
ESR2 Process Cycle Design
Laurent Delprat CERN, Geneva, Switzerland
Presentation transcript:

LHC Performance Workshop (Chamonix 2016) Cryogenics Sessions 3 : LHC Hardware Performance G. FERLIN on behalf of TE-CRG group With contribution from K. Brodzinski, S. Claudet, D. Delikaris, L. Delprat, E. Rogez and L. Tavian

Agenda Hardware status and Availability 2015 Performance aspect 2016 Expected Hardware performance 2016 Improvement foreseen all along the year Cryogenic power studies BS thermal load IT movement investigation 26 Jan 2016 TE-CRG-OA

Hardware configuration 2015 Run2 configuration Two 4.5 K cold boxes + one cold pumping unit except P18/P2 w.r.t scenario for Run 1 (1 Cryoplant /2 sectors) Pro Additional installed capacity for BS scrubbing Better availability expected (less rotating component running). One parallel quench/sector could be recovered without delay Lower energy consumption (-2 MW) as collateral bonus Cons In case of multiple quenches in parallel (more than 3 cells !!!) , the recovery time should be affected. (never occurs during 2015) In case of 1.9 K trip, two sectors will be lost. (never occurs, as mostly seen in S12/S23 not concerned by this configuration) Tuning of this new configuration at P18/P2 not yet possible. More than 3 parallel quenches will increase the recovery delay 26 Jan 2016 TE-CRG-OA

Overall Availability 2015 [Cryo Maintain] Statistic for run 2 from April 5th to Dec 14, TS excluded Supply failures mainly during spring (Post LS1 effect Users failures mostly due to quenches @ 6.5 TeV Downtime in line with Run 1 despite higher beam induced heat loads 26 Jan 2016 TE-CRG-OA

Overall Availability 2015 [Cryo Maintain] Statistics in line with our Cryo monitoring Downtime is to be considered as average for each category. PLCs: average downtime = 18h12min /// frequency = 1 every 2 months Cold Compressors: average downtime = 6h34min /// frequency = 1 every 3,5 weeks OP / Human Factor: average downtime = 4h32min /// frequency = 1 per month Elec / Instrum / Tunnel: average downtime = 1h45min /// frequency = 1 every 10 days DFBMI: average downtime = 0h4min /// frequency = 1 every 2 days DFBAF: average downtime = 0h3min /// frequency = 1 every 4 days 4 contributors for 75% of total cryo downtime Most frequent contributors OP factor: Mostly new OP staff (<30% experienced with Run 1) and no more capacity margin 26 Jan 2016 TE-CRG-OA

Overall Availability 2015 [Cryo Maintain] Downtime per categories and mitigation action undertaken Most frequent CM losses: - DFBMI: 39 losses; Should be solved during YETS - DFBAF: 29 losses; Trigger origin should be discussed with stakeholders (thresholds, timer…) Most time-consuming CM losses: - 1.8 K units: 8 losses, Average equivalent to Run 1; should devrease if new configuration P18/P2 works well. - PLCs: 4 losses, should be solved with new firmware during YETS - OP/Human factor: 9 losses; should be partially solved by process optimization under high BS load - Elec/Instrum/Tunnel: 22 losses; Average equivalent to Run 1 26 Jan 2016 TE-CRG-OA

Hardware reliability 2015 2015 Hardware reliability for Cryoplants 0.7 0.8 0.3 2 1.5 1.8 1.6 Failure rate / unit / year 26 Jan 2016 TE-CRG-OA

Hardware reliability 2015 Hardware fault breakdown In line with 2012 good data + “Supply” in spring and Cryo PLC’s (Treated in TS or YETS) Multiple origins, less straight forward to improve Hardware fault in line with Run 1 26 Jan 2016 TE-CRG-OA

Hardware status 2015 Refrigeration Main hardware issue solved during YETS warm compressor degradation diagnosed preventively and replacement without damage nor impact Major leak on 18 kW plant 3 turbines failure, No impact, compensated by Liquid Nitrogen 26 Jan 2016 TE-CRG-OA

Hardware status 2015 Refrigeration: YETS improvement Distributed failures 16 valves for turbine Control 4 Cryo PLCs Activated charcoal replacement (P6/P4/P8); Risk identified with some oil removal systems, worth the effort and follow-up Software update all around LHC Partial Cold Compressor VFD & AMB exchange 24 VDC consolidation ……. 26 Jan 2016 TE-CRG-OA

Performance aspects 26 Jan 2016 TE-CRG-OA

Expected Hardware performance 2016 W/hc p+/bunch bunch number installed capacity limit for 4.5-20K installed capacity + margin form 1.9K unit at lower flow than designed limit S23 36 bunch trains 72g72 bunch trains 144 bunch trains 72 bunch trains cleaning s12, 23, 81, 78 85 Theoritical LHC nominal heatloads cleaning s34, 45, 56, 67 after 8b4e bunch train test In 2016 we will be able to provide at least the same capacity as in 2015 26 Jan 2016 TE-CRG-OA K.Brodzinski_6th Evian_2015.12.15

Expected Hardware performance 2016 Main improvement foreseen all along the year Software improvements to fulfill the cryogenic power increase (continued effort as in 2015 Automatic adaptation to follow the thermal load on BS (must be tuned online!) Tuning of installation to prepare a scheme for high load Anticipation of the thermal load before beam Smooth Decrease of the thermal load by electrical heating after dump For FDBAF, a new settings of the threshold (absolute value and timer) should decrease drastically the quantity of losses of the Cryo Maintain signal. … “Data mining” to anticipate possible issues on tunnel components (1st studies started last year with former EN-ICE); On & Off line tracking of process deviations and abnormal behavior. 12 Jan 2016 TE-CRG-OA

Expected Hardware performance 2016 Hardware configuration This configuration will be tested before the end of YETS 2015 The aim is to decrease the number of rotation machine to improve the global availability The second target is to boost the cooling power of the Cryoplant in P2 and consequently the BS cooling power for the S23(cooling capacity margin to be evaluated during tests, to be used in addition to previously defined actions for S23) Specific configuration with non symmetry 12 Jan 2016 TE-CRG-OA

Cryogenic power studies BS thermal load (Maximum plant power validation) Due to a limited margin for sector S23 the proposition consists to define a road map to increase the margin and to reach the ultimate power; A first step consists to perform a power survey of the Cryoplant unit not connected to sector in P2 (same power survey for the twin plant in P8). (already foreseen during the restart of the plants). The second step consists to Perform a maximum BS load on the sector by using electrical heater installed on BS circuits. In parallel, perform the same test on the twin plant installed in P8 This second step is not included in the YETS time schedule and should be included if confirmed (3 to 4 days) 12 Jan 2016 TE-CRG-OA

Cryogenic power studies BS thermal load (Process upgrade to reach higher power) Cryogenic power recovery by using cold bypasses and associated issue / propositions Theoretical interest: Recover cooling power for BS cooling A new test is foreseen at P2 (see slide above) Practical limitations of this scheme do not shows a high margin on measured sectors This operation scheme was not foreseen originally. Hardware modification are necessary to be able to use this configuration with higher effects on all points. A prototype should be installed during EYETS and after validation the 3 others installation should be updated during TS2 12 Jan 2016 TE-CRG-OA

Cryogenic power studies He storage Compression Compression Refrigerator (economizer) Refrigerator (liquefier) A B 1.9 K circuit 1.9 K circuit 4.5 K circuit 4.5 K circuit Magnets supply Magnets supply 12 Jan 2016 TE-CRG-OA

Cryogenic power studies ITR8 movement investigation In order to investigate the ITR8 oscilation, a step by step check sequence is proposed to identify concerned circuit if any This sequence should be: Adjust Pressure difference with DFBX to stop refilling Block all valves Validation the oscillations during a significative period. This sequence is not yet planned and needs 2 to 3 days to be done (possibly during powering test of the sector?) 12 Jan 2016 TE-CRG-OA

Summary For 2016, Cryo team expect a global availability in the range 93 to 95 % with CRG origin fault below 5% Beam Screen heat load mitigation Installed power ~110 W/h-cel, 160 W/h-cel already reached except S23 with plan to understand the lower margin Software optimization on going to fit with 2800 bunches Data mining to detect online smooth drift and anticipate possible issues. Proposition to test an upgraded cold by-pass, during EYETS, for recovering additional margin. 26 Jan 2016 TE-CRG-OA