Infrastructure inventory and use G.Vandoni SRF Coordination, 15th June 2017
INFRASTRUCTURES for SRF - INVENTORY Surface & Heat treatments Warm inspections & tests Assembly & storage RF cold testing Degreasing Optical inspection Assembly on marble Vertical cryostat SM18 single cavity SUBU chem. etching Coarse tuning on bench Assembly, conventional Vertical cryostat Cryolab single cavity Bead-pull field profile Assembly, laminar flow "grey" EP light INFRASTRUCTURES for SRF - INVENTORY EP heavy Assembly, clean room (1000-10000) Cryomodule horizontal bunker testing BCP light Assembly, clean room (100) BCP heavy Vac firing Storage, conventional Vac bakeout Storage, clean-room quality HPR Thin film coating
INFRASRTUCTURE INVENTORY DOCUMENT Technologies Location Specification: sizes, forms, operational parameters Scope and physical limits Use, rate limits Space Location, surface Floor loading, ventilation Clean room class Use Foreseen evolution DRAFT INFRASRTUCTURE INVENTORY DOCUMENT A long DRAFT is under revision
INFRASTRUCTURE NEEDS by PROJECTS INFRASTRUCTURES Surface & Heat treatments Warm inspections & tests Assembly & storage RF cold testing PROJECTS LHC consolidation LHC operation HIE-Isolde INFRASTRUCTURE NEEDS by PROJECTS HiLumi crab-cavities High gradient WOW cavities FCC Thin films R&D SRF R&D Couplers R&D
INFRASTRUCTURE MANAGEMENT 1718 SEASON INFRASTRUCTURE MANAGEMENT PROJECT NEEDS infrastructure management ≠ use of infrastructure by projects infrastructure use by projects is not 100% of infrastructure availability: maintenance, consolidation, etc are taken into account by the infrastructure manager for availability
COLLECTION OF PROJECT NEEDS
COLLECTION OF PROJECT NEEDS Every project linkperson fills up to best knowledge the calendar of needs in infrastructure use
COLLECTION OF PROJECT NEEDS Every project linkperson fills up to best knowledge the calendar of needs in infrastructure use
CALENDAR June 15th Distribution of sheets to linkpersons Summer 2017 Filling up the sheets September 1st Collection of needs completed Sept-Oct WP mini-reviews October 15th Analysis of needs completed 30th Nov/ 1st Dec SRF workshop CALENDAR