Infrastructure inventory and use

Slides:



Advertisements
Similar presentations
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Advertisements

SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
SM18 Vertical/Horizontal Test Setup LHC Crab Cavity Engineering Meeting Session: Cavity Cryostat Testing & Integration in SM18Cavity Cryostat Testing &
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December.
Needs of a European SCRF Facility - the BIG plan Lutz Lilje DESY -MPY- DESY 11/2006 Planning Resource needs.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
SRF Test Infrastructure in Europe W. Weingarten with O. Brunner, S. Calatroni, B. Vullierme (CERN) and R. Eichhorn, E. Elsen, D. Gardès, J. Knobloch, G.
Lutz Lilje DESY -MPY- SCRF Infrastructure for ILC EGDE Meeting Lutz Lilje.
Orsay, Sergio Calatroni - CERN 1 CERN facilities for Superconducting RF S. Calatroni, J.-P. Delahaye, J. Tückmantel, B. Vullierme.
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
SCRF Lab and IHEP Jianping Dai On behalf of the SCRF facilities team First Mini-Workshop on IHEP 1.3GHz Superconducting RF project, June 10-11,
KEK R&D for LHC Plan of 800MHz Cavity Calculation of 400MHz Cavity 16 th September 2009, LHC-CC09 at CERN K.Nakanishi.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
Mid Term Review Meeting, 26 September 2012N. SURNAME1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
SPS D OUBLE -Q UARTER W AVE C RAB C AVITIES D ISCUSSION ON CAVITY PREPARATION PROCEDURES CERN, 28 October 2015 Silvia Verdú-Andrés, Toohig fellow at BNL.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Spoke test in vertical cryostat IPNO-UU Meeting on spoke test program, 2 nd -3 st October 2013 IPNO Team.
JRA1 – SRF report CARE Steering Committee meeting,
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
HIE-ISOLDE Project Status Report 52nd ISOLDE & nTOF Technical Committee meeting February 3rd 2016 Y. Kadi On behalf of the HIE-ISOLDE Project Team.
Report Working Group “Cavity design and construction” 1 SPL collaboration meeting Vancouver 8-9 May 2009revised by W. Weingarten on 30/4/2009  Status.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Explosive Events during V.T. in KEK ECFA (2013/5/30) 1.
A European SCRF Infrastructure DESY -MPY Goals of the Infrastructure – ILC – Other projects Timeline – Phasing of work Needs.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
Developing the Collaboration P McIntosh STFC Daresbury Laboratory.
ESS WP4 Strategy for series production ESS TAC10 – 5th to 6th November Lund Sébastien Bousson WP 4 leader.
Developments of new treatment techniques for SRF cavities at KEK HORIZONTAL HPR FOR PERFORMANCE RECOVERY Yoshiyuki MORITA Motivation of developing HHPR.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
July 5th,2006John Mammosser, Jlab ILC – Electropolish Development (EP) Plans/Progress/Problems/Performance Jefferson Lab J. Mammosser, L. Phillips, C.
WP1: Superconducting Cavity Developments and Tests Walter Venturini Delsolaro Mid Term Review Meeting, 26 September 2012 CATHI Marie Curie Initial Training.
Status of the M-ECCTD F. Peauger - P. Bosland
CC LLRF SM18 test plan and BA6 infrastructure
S1G Experiment Schedule Plan
CERN – Zanon discussions
Status and plans for the 3.9 GHz section of XFEL
MuCool Test Area Dedicated facility built at the end of the Linac to address MuCool needs RF power 805MHz, 201MHz)
ILC R&D Board Meeting: SRF Cavities Status and Plans
RF-SRF Infrastructure: Operation,Maintenance&Upgrades
ILC-SCRF Test Facilities considerations
STF Plan of gradient improvement
FNAL recent coupler troubles
FCC R&D WP5 Cavity Fabrication Status May 2017 M
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
SPS – RFD Experience and Evolution to LHC
Hollow e- lens, Cryogenic aspects
P. Maesen for CERN BE/RF-SRF team
SRF Section Cuvée 2014.
HIE-LINAC status report
Prototype cryomodule development
Cavity Degradation Experience at S1-Global
Facility for Research Instrumentation and Accelerator Development
Presentation transcript:

Infrastructure inventory and use G.Vandoni SRF Coordination, 15th June 2017

INFRASTRUCTURES for SRF - INVENTORY Surface & Heat treatments Warm inspections & tests Assembly & storage RF cold testing Degreasing Optical inspection Assembly on marble Vertical cryostat SM18 single cavity SUBU chem. etching Coarse tuning on bench Assembly, conventional Vertical cryostat Cryolab single cavity Bead-pull field profile Assembly, laminar flow "grey" EP light INFRASTRUCTURES for SRF - INVENTORY EP heavy Assembly, clean room (1000-10000) Cryomodule horizontal bunker testing BCP light Assembly, clean room (100) BCP heavy Vac firing Storage, conventional Vac bakeout Storage, clean-room quality HPR Thin film coating

INFRASRTUCTURE INVENTORY DOCUMENT Technologies Location Specification: sizes, forms, operational parameters Scope and physical limits Use, rate limits Space Location, surface Floor loading, ventilation Clean room class Use Foreseen evolution DRAFT INFRASRTUCTURE INVENTORY DOCUMENT A long DRAFT is under revision

INFRASTRUCTURE NEEDS by PROJECTS INFRASTRUCTURES Surface & Heat treatments Warm inspections & tests Assembly & storage RF cold testing PROJECTS LHC consolidation LHC operation HIE-Isolde INFRASTRUCTURE NEEDS by PROJECTS HiLumi crab-cavities High gradient WOW cavities FCC Thin films R&D SRF R&D Couplers R&D

INFRASTRUCTURE MANAGEMENT 1718 SEASON INFRASTRUCTURE MANAGEMENT PROJECT NEEDS infrastructure management ≠ use of infrastructure by projects infrastructure use by projects is not 100% of infrastructure availability: maintenance, consolidation, etc are taken into account by the infrastructure manager for availability

COLLECTION OF PROJECT NEEDS

COLLECTION OF PROJECT NEEDS Every project linkperson fills up to best knowledge the calendar of needs in infrastructure use

COLLECTION OF PROJECT NEEDS Every project linkperson fills up to best knowledge the calendar of needs in infrastructure use

CALENDAR June 15th Distribution of sheets to linkpersons Summer 2017 Filling up the sheets September 1st Collection of needs completed Sept-Oct WP mini-reviews October 15th Analysis of needs completed 30th Nov/ 1st Dec SRF workshop CALENDAR