Design of TIDVG#4 A. Perillo-Marcone (EN-STI).

Slides:



Advertisements
Similar presentations
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
Advertisements

02/06/20141 WHAT ITEM IS COMPOSED OF ? INTEGRATION MODEL DETAIL MODEL SKELETON 3D ENVELOP PART 1 PART 2 PART XXX… EQUIPMENT ITEM INTEGRATION OFFICE RESPONSIBILITY.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
High Energy Dump LSS5 STI Cost Estimate A.PERILLO MARCONE & F.PASDELOUP 2015/04/16 With contribution of R.FOLCH & D.GRENIER.
1 M. Modena for the CLIC MDI magnet study Team (A. Aloev, P. Thonet, E. Solodko, A. Vorozhtsov) CLIC MDI Meeting,16 January 2015.
Contents of talk May 2 nd 2006 Y. Muraki on behalf of the LHCf 1. Physics goal 2. The BRAN detector 3. The particle distribution inside the BRAN 4. In.
Simulations on the EC detector in MU98 A. Romano, G. Iadarola, G. Rumolo LIU-PS Meeting 28 April 2015 Many thanks to: M. Taborelli, C. Yin Vallgren.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
BSY D10 replacement dump Proposal Dieter Walz Alev Ibrahimov March
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
E. Richards EE Chamber installation. Summary Position Of the EE chambers General view of EEL chambers EEL5 chamber Installation of other chambers ex.
INTO A LEarNeR© 7 KIT TO BE USED FOR THE PURPOSE OF LEARNING LENR AND RESULTING IN A USEFUL WATER HEATER POWERED BY A BATTERY 5/7/2012Copyright by Dale.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
Presentation at BBC, Linac 4 Commissioning Dump at 50 and 100MeV 1 Øyvind Dahle Lauten, EN-STI.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
ATLAS Inner Detector thermal study. The Inner Detector.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
TIDVG2014 PRODUCTION AND INSTALLATION STATUS 23/07/2014 – “TIDVG Follow-up Meeting” Ivo Leitão.
Discussion and preliminary conclusions LIU-SPS dump review.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
P8 Shutter Review July 26, 2005 P8 – Monochromatic Photon Shutter Presented by C. Chaffee and L. Gades.
Progress and Plans for Main Injector beam Pipe Coatings Dave Capista Linda Valerio Project X Collabration Meeting WG3 MI/Recycler September 8, 2010.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
HL-LHC-UK Thermal Shield Update Niklas Templeton 07/03/2016.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
RECENTLY OBSERVED PROBLEMS WITH PRESENT TIDVG 30/07/2014 – “LIU-SPS External Beam Dump” Ivo Leitão.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
HIRADMAT/ IRRADITION facilities Overall view with the biggest object to irradiat, T9 shielding with TED inside and the beam dump with 12 meters of cast.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
Pierre Delebecque Cooling – upgrade 2012 May 31 st 1 Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
SPS High Energy LSS5 Thermal contact & cooling aspects
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
Resistivity Definition Whiteboards. What determines the resistance of a piece of wire?
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
X PS Internal Dump Core Review François-Xavier Nuiry Giulia Romagnoli
Proposal TDIS-TZM WP14 TDIS jaw validation testing
Options and Recommendations for TL and Dumps
Impact of TIDVG problem on LSS5 dump design schedule
Challenges of vacuum chambers with adjustable gap for SC undulators
Preliminary Y-chamber specifications – First draft
Components for the Machine-Interface Regions
Arc magnet designs Attilio Milanese 13 Oct. 2016
Beam instrumentation for the upcoming TIDVG#5
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
Thermo-mechanical simulations jaws + tank
EN-STI activities in LHC during EYETS
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
Pierre-Alexandre Thonet
Summary of Session 5 Other Vibration Source
دانشگاه شهیدرجایی تهران
XFEL Collimation and Beam Switchyard Vacuum Issues
تعهدات مشتری در کنوانسیون بیع بین المللی
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
Current Design and Short Status
Additional Upstream Coil Shielding
CEPC-650MHz Cavity Cryomodule
Updates on TDIS design C. Bracco, A. Perillo Marcone, D. Carbajo Perez, L. Gentini, A. Lechner, M.I. Frankl.
Single Detector Design
Update on the SPS Impedance Model
n_TOF Target #3 Baseline Design
Presentation transcript:

Design of TIDVG#4 A. Perillo-Marcone (EN-STI)

Current Dump at LSS1 – TIDVG#3 Section A-A Iron Shielding (EN-GJL-200) Copper Core (OFE, C10100 H02) Graphite: 2.7m (2020 PT) Aluminium: 0.8m (EN AW 6082 T6) Copper Tungsten: 0.3m (Densimet 180) B A Beam Section B-B Shielding Cooling pipes for shielding Beam opening Copper core (Envelope+blocks) Cooling circuit for copper core 15th July 2016 Design of TIDVG#4 – A. Perillo-Marcone 2

Design of TIDVG#4 – A. Perillo-Marcone TIDVG#4 - Design CDD: SPSTIDV4XXXX Smarteam: ST0762531* 15th July 2016 Design of TIDVG#4 – A. Perillo-Marcone

Design of TIDVG#4 – A. Perillo-Marcone TIDVG#4 - Design Main modifications: Replacement of copper OFE by CuCrZr – less manufacturing time. The Aluminium blocks are removed. 15th July 2016 Design of TIDVG#4 – A. Perillo-Marcone

Design of TIDVG#4 – A. Perillo-Marcone TIDVG#4 - Design Main modifications: Two cooling circuits. More reliable springs. The copper block is integrated into the core. 15th July 2016 Design of TIDVG#4 – A. Perillo-Marcone

Summary of Changes in TIDVG#4 with respect to TIDVG#3 Geometry of beam opening slightly modified inside the dump. Flanges at upstream/downstream ends are identical. Modified shape of vacuum chamber upstream/downstream of dump. Addition of SS vacuum chamber around the dump. Removal of aluminium block inside the dump Modification of lengths and materials inside the dump. 15th July 2016 Design of TIDVG#4 – A. Perillo-Marcone

Thank you for your attention.

Design of TIDVG#4 – A. Perillo-Marcone 15th July 2016 Design of TIDVG#4 – A. Perillo-Marcone

Design of TIDVG#4 – A. Perillo-Marcone 15th July 2016 Design of TIDVG#4 – A. Perillo-Marcone

Design of TIDVG#4 – A. Perillo-Marcone 15th July 2016 Design of TIDVG#4 – A. Perillo-Marcone

Design of TIDVG#4 – A. Perillo-Marcone 15th July 2016 Design of TIDVG#4 – A. Perillo-Marcone