Tunnelling under lake Geneva

Slides:



Advertisements
Similar presentations
Geosynthetics in Separation University of Strathclyde
Advertisements

Water Underground.
Design Parameters.
Sensitivity Analysis In deterministic analysis, single fixed values (typically, mean values) of representative samples or strength parameters or slope.
Mine dewatering for pit slope stability
Chapter (1) Geotechnical Properties of Soil
GROUNDWATER CONTROL.
Bank-Stability and Toe-Erosion Model Andrew Simon, Robert Thomas, Andrea Curini and Natasha Bankhead USDA-ARS National Sedimentation Laboratory, Oxford,
ENGINEERING GEOLOGY OF THE CHANNEL TUNNEL Richard Rae & Robert Hazelhurst March 2006.
The Boulou Fault Zone Its Geology and its Impacts on the Perthus Tunnel project The Boulou Fault Zone Eastern Pyrenees, France Its Geology and its Impacts.
Hybrid Pile n Definition –A pile installed by combining driven and auger/drilled techniques. n Why use a ‘Hybrid’? –by incorporating a ‘driven element’,
Tutorial 4: Two walls connected with struts Deep Excavation LLC DeepEX 2015 – Advanced course1.
CE HYDRAULICS ENGINEERING
Factors that Influence Erosion
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
SPRINGVILLE CITY WATER TANK AND WELL PROJECT WILLIAM GARNER, JEREMY FOWLER, AUSTIN JASPER The city of Springville has been experiencing a period of rapid.
Construction Dewatering
Foundation Engineering CE 483
LAGUNA at Fréjus LAGUNA/LAGUNA-LBNO General Meeting March 3 th -5 th, 2011, CERN Eng. Francesco Amberg.
8. Permeability (Das, chapter 7)
Investigation of FCC position Impacts on Hadron Injectors John Osborne, Charlie Cook, Yung Loo (ARUP) 16/09/2014.
Backbone Engineering Clark Larsen, Kendrick Shepherd, and Brett Thomas.
General meeting LAGUNA LAGUNA – Fréjus site
Laughton 7/04 Long Baseline Neutrino Program Tunneling Chris Laughton, Fermilab.
TOT-FCC: Tunnel Optimisation Tool for the Future Circular Collider Introduction and lessons learnt C. Cook, J. Osborne, P. Lebrun, Y. Robert, M. Jones,
- Water beneath the Earth’s surface in sediment and rock formations.
Geotechnical Exploration for Reach 2B of the San Joaquin River Restoration Program Nicholas Hightower Division of Engineering, Project Geology 2011 DWR.
Session 15 – 16 SHEET PILE STRUCTURES
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
Fundamentals of Groundwater Flow (Flow in the Natural Environment) A Watershed Dynamics Tutorial © John F. Hermance March 21, 2003 Go to main directory.
Indications of an Underground “River” beneath the Amazon River: Inferences from Results of Geothermal Studies Elizabeth Tavares Pimentel-UFAM/ON Supervisor:
Evaluation of the Geophysical Investigations for Rapid Mapping the Maha Sarakham Rock Salt Formation in the Northeast, Thailand.
FHI 32: FCC tunnel layout and transferline update Tuesday, 9 February 2016 CE Updates: Comparison of 100km Intersecting and Non-Intersecting options New.
Infrastructure and Operation meeting 20 th January 2016 Amberg’s Report Summary : Comparison of 100km Intersecting and Non-Intersecting options C. Cook.
CAISSON FOUNDATION.
Soil mechanics and foundation engineering-III (CE-434)
DIAPHRAGM WALLS.
LAGUNA-LBNO at Fréjus General Meeting June 2013, Geneva Giovanni Como, Francesco Amberg, Daniele Bronzetti 1.
Warmup 2/29/16 You’ve all seen wells before. Where does the water come from? (not just “underground”) Objective Tonight’s Homework To learn about sources.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
Hydrosphere Notes Parts 6 - Groundwater. Where is most of Earth’s useable freshwater found? ~97% is Groundwater.
RISK ASSESSMENT FCC draft, 2. September 2015.
GROUND IMPROVEMENT TECHNIQUES
FCC Civil Engineering Optimisation and Design Development
Drainage and Grading Creating stable ground surfaces
CHAPTER FOUR LATERAL EARTH PRESSURE. 3.1 Introduction 3.2 Definitions of Key Terms 3.2 Lateral Earth Pressure at Rest 3.3 Active and Passive Lateral Earth.
Physics Support Materials Higher Mechanics and Properties of Matter
Presented By: Sanku Konai
Chapter 8 Civil Engineering Part 2: Geotechnical Engineering
5th FCC Infrastructure & Operation meeting
Civil Engineering for FCC-eh IR
on soft clay using finite element method Road & Highway Engineering
MACH 112: Cutting Tools & Measurement
Geotechnical Engineering II
Risk Management – Correlation and Dependencies for Planning, Design and Construction Philip Sander Alfred Moergeli John Reilly.
The application of an atmospheric boundary layer to evaluate truck aerodynamics in CFD “A solution for a real-world engineering problem” Ir. Niek van.
PARAMETRIC SUB-BOTTOM PROFILER: A NEW APPROACH FOR AN OLD PROBLEM
Preliminary design of foundation for HEPS
Aquifer A body of rock or sediment that stores groundwater and allows the flow of groundwater.
Bellringer Copy down learning log Copy down homework
Water Table: is the level at which the groundwater pressure is equal to atmospheric pressure. Aquitard: is a zone within the earth that restricts.
Mitre III Building McLean VA Debra Schroeder Structural Option.
Scott McFarlane & Richard Merifield
Water Table: is the level at which the groundwater pressure is equal to atmospheric pressure. Aquitard: is a zone within the earth that restricts.
Factors to Consider in Foundation Design Chapter # 02
Groundwater.
Water Underground.
Graduation Project Bracing system for deep excavation.
Risk Management – Correlation and Dependencies for Planning, Design and Construction Philip Sander Alfred Moergeli John Reilly.
Presentation transcript:

Tunnelling under lake Geneva

Tunnelling under lake Geneva ILF Questions: We gather that the tunnel will be located mostly within the clays and silts type (6). The material type (5) seems to have very poor geotechnical properties (NSPT  < 2 means “pulpy”) and hence it is necessary to avoid alignments within it. As it stands an accordingly thick segmental lining might be required to cope with both the water pressure and the depth of tunnelling in soft ground. In order to assess the most possible challenges and risks facing this section, we would like to have an idea of: The cross section shows the bottom level of the lake, how accurate is this level? What would be the level of accuracy in meters? It is understood that the interfaces between the ground types will need to be determined more accurately upon further site investigation. What is the level of accuracy of these interfaces in meters? We are particularly interested to know how much deeper the interface between materials (5) and (6) and between soft ground and (15) might be. Can we have some nominal values for geotechnical parameters (for (6) to (13) such as ground Young’s modulus (E), internal angle of friction, drained cohesion, coefficient of lateral earth pressure at rest (k0). The values to be provided do not need to correlate to the existing ground investigation. Instead, probable parameters are sufficient as these are not intended to be used for design but for risk definition.

Tunnelling under The Rhone

Tunnelling under The Rhone ILF Questions: In principle, our advice would be to lower the alignment at this location. Although, tunnelling is possible, the practicalities of a TBM mode change for a small length and the limited space for ground treatment would be fairly expensive and, therefore, difficult to justify. There are conventional solutions such as umbrella pipe roofs, injections ahead of the advance, freezing but also quite costly and time consuming for approx. 600 m. The geotechnical report states that ground permeability’s of 10-3m/s are possible. For this location we would like to know: How much deeper should the alignment be moved to ensure the tunnel crown has a rockhead of at least 3m? This assessment should consider the level of accuracy of the interface shown on the current section. (JS can provide estimate) Nominal values for Young’s modulus (E). The values to be provided do not need to correlate to the existing ground investigation. Instead, probable parameters are sufficient as these are not intended to be used for design but for risk definition. Possible flow rates of the groundwater regime

Tunnelling at Point E

Tunnelling at Point E (L’Arve) ILF Questions: We plan to provide alternative layout for the structures to be placed underground at point E. Similarly to the alignment under Lake Geneve, we would like to know: It is understood that the interfaces between the ground types will need to be determined more accurately upon further site investigation. What is the level of accuracy of the shown interfaces in meters? We are particularly interested to know how much deeper the interface between the quaternary deposits and the rock might be. Can we have some nominal values for geotechnical parameters such as ground Young’s modulus (E), internal angle of friction, drained cohesion, coefficient of lateral earth pressure at rest (k0)?. The values to be provided do not need to correlate to the existing ground investigation. Instead, probable parameters are sufficient as these are not intended to be used for design but for risk definition. Hydrogeologically, what are the most likely ranges of permeability of the quaternary deposits? Again, probable parameters are sufficient as these are not intended to be used for design but for risk definition.