Ex/4-3: On the challenge of plasma heating in the JET Metallic Wall

Slides:



Advertisements
Similar presentations
Presentation on RF Heating by - Saurabh Kumar Vij
Advertisements

Progress with PWI activities at UKAEA Fusion GF Counsell, A Kirk, E Delchambre, S Lisgo, M Forrest, M Price, J Dowling, F Lott, B Dudson, A Foster,
Glenn Bateman Lehigh University Physics Department
H-mode characterization for dominant ECR heating and comparison to dominant NBI or ICR heating F. Sommer PhD thesis advisor: Dr. Jörg Stober Academic advisor:
1 1 – Experience of diagnostics used for LH grill protection 2 – Layout of the suitable diagnostics in ITER 3 – Info on fibre optics for wave guide arc.
Introduction to Plasma-Surface Interactions Lecture 6 Divertors.
ASIPP HT-7 belt limiter Houyang Guo, Sizhen Zhu and Jiangang Li Investigation of EAST Divertor Asymmetry in Plasma Detachment & Target Power Loading Using.
Enabling Technology on Alcator C-Mod Jim Irby MIT-PSFC.
XP 1157 Increasing the CHI start-up current magnitude in NSTX B.A. Nelson et al. 1.
ASIPP Characteristics of edge localized modes in the superconducting tokamak EAST M. Jiang Institute of Plasma Physics Chinese Academy of Sciences The.
Effects of ICRF conditioning on the first wall in LHD N. Ashikawa, K. Saito, T. Seki, M. Tokitani, Y. Ohtawa 1), M. Nishiura, S. Masuzaki K. Nishimura.
Ion Injector Design Andrew Seltzman.
ELECTRON CYCLOTRON SYSTEM FOR KSTAR US-Korea Workshop Opportunities for Expanded Fusion Science and Technology Collaborations with the KSTAR Project Presented.
LH SOL generated fast particles meeting, Prague, Dec 2004 J. Mailloux JET Programme 2005 Selected issues that could affect LH experiments.
Energy loss for grassy ELMs and effects of plasma rotation on the ELM characteristics in JT-60U N. Oyama 1), Y. Sakamoto 1), M. Takechi 1), A. Isayama.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
IOS-5.2 Maintaining ICRH Coupling in expected ITER regime Spokes person: M. Goniche M.-L. Mayoral (JET), R. Pinsker (DIII-D), L. Colas (TS), V. Bobkov.
D. Borba 1 21 st IAEA Fusion Energy Conference, Chengdu China 21 st October 2006 Excitation of Alfvén eigenmodes with sub-Alfvénic neutral beam ions in.
A. HerrmannITPA - Toronto /19 Filaments in the SOL and their impact to the first wall EURATOM - IPP Association, Garching, Germany A. Herrmann,
1 ST workshop 2008 Conception of LHCD Experiments on the Spherical Tokamak Globus-M O.N. Shcherbinin, V.V. Dyachenko, M.A. Irzak, S.A. Khitrov A.F.Ioffe.
Recent JET Experiments and Science Issues Jim Strachan PPPL Students seminar Feb. 14, 2005 JET is presently world’s largest tokamak, being ½ linear dimension.
1 Garching, 20/3 2009EFDA Fuelling Meeting A Ekedahl 1, M Goniche 1, G Granucci 2, J Mailloux 3, V Pericoli 4, V Petrzilka 5, K Rantamäki 6, JET-EFDA contributors,
1 ST workshop 2005 Numerical modeling and experimental study of ICR heating in the spherical tokamak Globus-M O.N.Shcherbinin, F.V.Chernyshev, V.V.Dyachenko,
1 Association Euratom-Cea TORE SUPRA Tore Supra “Fast Particles” Experiments LH SOL Generated Fast Particles Meeting Association Euratom IPP.CR, Prague.
Edge Localized Modes propagation and fluctuations in the JET SOL region presented by Bruno Gonçalves EURATOM/IST, Portugal.
HT-7 Lithium coating and its influence on plasma performance on HT-7 Z. Sun, J.S. Hu, G.Z. Zuo, J.G. Li ASIPP
1 Modeling of EAST Divertor S. Zhu Institute of Plasma Physics, Chinese Academy of Sciences.
1 CHI Summary Transient CHI (XP606) –All systems operated reliably without any faults Edge Current drive (XP533)
V. A. Soukhanovskii NSTX Team XP Review 31 January 2006 Princeton, NJ Supported by Office of Science Divertor heat flux reduction and detachment in lower.
W coating of CFC tiles for the JET new wall - Task Agreement: JW6-TA-EP2-ILC-05 Manufacturing and testing of W-coated CFC tiles for installation in JET.
10th ITPA conference, Avila, 7-10 Jan Effects of High Energy Ions Accelerated in front of ICRF Antennas in LHD S. Masuzaki on behalf of the LHD Experimental.
NSTX-U NSTX-U PAC-31 Response to Questions – Day 1 Summary of Answers Q: Maximum pulse length at 1MA, 0.75T, 1 st year parameters? –A1: Full 5 seconds.
HT-7 HIGH POWER MICROWAVE TEST SYSTEM AND EXPERIMENTS WANG Mao, LIU Yue-xiu, SHAN Jia-fang, LIU Fu-kun, XU Han-dong, YU Jia-wen Institute of Plasma Physics,
Fyzika tokamaků1: Úvod, opakování1 Tokamak Physics Jan Mlynář 8. Heating and current drive Neutral beam heating and current drive,... to be continued.
RF simulation at ASIPP Bojiang DING Institute of Plasma Physics, Chinese Academy of Sciences Workshop on ITER Simulation, Beijing, May 15-19, 2006 ASIPP.
1 Max-Planck-Institut für Plasmaphysik 10th ITPA meeting on SOL/Divertor Physics, 8/1/08, Avila ELM resolved measurements of W sputtering MPI für Plasmaphysik.
26-October-2006 PEP-II MAC Session HOM measurement and analysis S. Weathersby, A. Novokhatski HOMs in LER region 4: overview, history Collimator wake fields.
Advances In High Harmonic Fast Wave Heating of NSTX H-mode Plasmas P. M. Ryan, J-W Ahn, G. Chen, D. L. Green, E. F. Jaeger, R. Maingi, J. B. Wilgen - Oak.
ASIPP Long pulse and high power LHCD plasmas on HT-7 Xu Qiang.
CHI Run Summary for March 10-12, 31 & April 9, 2008 Flux savings from inductive drive of a Transient CHI started plasma (XP817) R. Raman, B.A. Nelson,
Plasma Facing PFA Antenna Group POLITECNICO DI TORINO 19 Topical Conference on Radio Frequency Power in Plasmas June 1-3, Newport 1 Mitigation of.
R. A. Pitts et al. 1 (12) IAEA, Chengdu Oct ELM transport in the JET scrape-off layer R. A. Pitts, P. Andrew, G. Arnoux, T.Eich, W. Fundamenski,
ASIPP HT-7 The effect of alleviating the heat load of the first wall by impurity injection The effect of alleviating the heat load of the first wall by.
Integrated Operation Scenarios ITPA Remaining duties ITPA CC meeting & IEA/ITPA JE planning meeting –12 – 14 (15) December 2011, Cadarache –Ide, Sips and.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT Task Force S1 J.Ongena 19th IAEA Fusion Energy Conference, Lyon Towards the realization on JET of an.
Improved performance in long-pulse ELMy H-mode plasmas with internal transport barrier in JT-60U N. Oyama, A. Isayama, T. Suzuki, Y. Koide, H. Takenaga,
NCSX NCSX CDR May 21-23, 2002 H.W. Kugel Slide 1 Conceptual Design for NCSX Auxiliary Systems Heating, Fueling,Wall Conditioning and Vacuum Systems.
ASIPP HT-7 Behaviors of Impurity and Hydrogen Recycling on the HT-7 Tokamak J. Huang*, B.N. Wan, X.Z. Gong, Z.W. Wu and the HT-7 Team Institute of Plasma.
1 LHCD Properties with a New Lower Hybrid Wave Antenna on HT-7 Tokamak Wei Wei,Guangli Kuang,Bojiang Ding,Weici Shen and HT-7 Team Institute of Plasma.
1 EAST Recent Progress on Long Pulse Divertor Operation in EAST H.Y. Guo, J. Li, G.-N. Luo Z.W. Wu, X. Gao, S. Zhu and the EAST Team 19 th PSI Conference.
Summary of RF-Related Presentations at the 2011 EPS Meeting G. Taylor NSTX Physics Meeting July 25, 2011 NSTX Supported by 1.
Solenoid Free Plasma Start-up Mid-Run Summary (FY 2008) R. Raman and D. Mueller Univ. of Wash. / PPPL 16 April 2008, PPPL 1 Supported by Office of Science.
1Field-Aligned SOL Losses of HHFW Power and RF Rectification in the Divertor of NSTX, R. Perkins, 11/05/2015 R. J. Perkins 1, J. C. Hosea 1, M. A. Jaworski.
Fast response of the divertor plasma and PWI at ELMs in JT-60U 1. Temporal evolutions of electron temperature, density and carbon flux at ELMs (outer divertor)
1 NSTX EXPERIMENTAL PROPOSAL - OP-XP-712 Title: HHFW Power Balance Optimization at High B Field J. Hosea, R. Bell, S. Bernabei, L. Delgado-Aparicio, S.
Nonlinear plasma-wave interactions in ion cyclotron range of frequency N Xiang, C. Y Gan, J. L. Chen, D. Zhou Institute of plasma phsycis, CAS, Hefei J.
Fast 2-D Tangential Imaging of Edge Turbulence: Neon Mantle (draft XP) R. J. Maqueda, S. J. Zweben, J. Strachan C. Bush, D. Stutman, V. Soukhanovskii Goal:
Evaluation of a Field Aligned ICRF Antenna in Alcator C-Mod 24th IAEA Fusion Energy Conference San Diego, USA October S.J. Wukitch, D. Brunner,
New prototype modulator for the European XFEL Project (DESY) Pulse Step Modulator (PSM) Technology for long pulse applications.
T. Biewer, Sep. 20 th, 2004 NSTX Results Review of 11 Edge Ion Heating by Launched HHFW in NSTX T.M. Biewer, R.E. Bell, S. Diem, P.M. Ryan, J.R.
Modélisation non-linéaire des interactions ondes/plasma de bord Enabling Research CEA-05 L. COLAS (PI), L. LU, P. Tamain, IRFM E. Faudot, S. HEURAUX,
Temperature Measurements of Limiter Surfaces at High Heat Flux in the HT-7 Tokamak H. Lin, X.Z. Gong, J. Huang, J.Liu, B. Shi, X.D. Zhang, B.N. Wan,
The 15th International Conference on Ion Sources (ICIS’13)
Melting of Tungsten by ELM Heat Loads in the JET Divertor
Compatibility of high performance scenarios with ILW
Achievements of the first year of plasma operation with the
LH Generated Hot Spots on the JET Divertor
Influence of energetic ions on neoclassical tearing modes
Advances in predictive thermo-mechanical modelling for the JET divertor experimental interpretation, improved protection, and reliable operation D. Iglesias,
Progress towards development of long pulse ITER operation trough RF heated H-mode experiments in EAST and HL-2A (A. Ekedahl et al., EX/P2-16)
Presentation transcript:

Ex/4-3: On the challenge of plasma heating in the JET Metallic Wall Dr. Marie-Line Mayoral 24th IAEA Fusion Energy Conference, 8-13 October, San Diego, USA

Ex-4-3: On the challenge of plasma heating in a the JET Metallic Wall Marie-Line Mayoral AND V. Bobkov, A. Czarnecka, I. Day, A. Ekedahl, P. Jacquet, M. Goniche, R. King, K. Kirov, E. Lerche, J. Mailloux, D. Van Eester, O. Asunta, C. Challis, D. Ciric, J.W. Coenen, L. Colas, M. C. Giroud, M. Graham, I. Jenkins, E. Joffrin, T. Jones, D. King, V. Kiptily, C.C. Klepper, C. Maggi, F. Marcotte, G. Matthews, D. Milanesio, I. Monakhov, M. Nightingale, R. Neu, J. Ongena, T. Pütterich, V. Riccardo, F. Rimini, J. Strachan, E. Surrey, V. Thompson, G. Van Rooij and JET EFDA contributors. Ex-4-3: On the challenge of plasma heating in a the JET Metallic Wall

Outline Ion Cyclotron Resonance Frequency heating ICRF Lower hybrid Current Drive LHCD Neutral Beam Injection heating NBI Ion Cyclotron Resonance Frequency heating ICRF Neutral Beam Injection heating NBI Lower hybrid Current Drive LHCD All the things to watch for before or when applying high heating power in a metallic machine based on the JET experience For each heating systems System layout and capabilities Modifications to the wall or the systems for safe operation in the JET ITER-like wall (ILW) Operation of the systems during the 1st experimental campaigns with the ITER-like wall (ILW)  power achievements, heats loads issues & increase in plasma impurities content

JET NBI system  2 neutral injectors boxes, recently upgraded Two neutral beam injector boxes Each equipped with 8 Positive Ion Neutral Injectors: PINIs  grouped into tangential and normal banks [Ciric et al., FED, 86, 2011] In parallel with ITER-like wall installation  NBI system upgraded 1st goal: Increase NBI power from 24MW to 34MW  PINIs converted to 125kV PINIs with modified ion source, accelerator configuration & refurbished power supplies 2nd goal: Increase NBI pulse duration at full power from 10s to 20s  beam duct changed to actively cooled beam duct View of the JET vessel from inside the new beam “duct”

NBI-related modifications prior to ILW Main chamber W-coated on shine-through areas Neutral Beam test bed measurements Shine through power increased by a factor of 2 for the upgraded PINIs Peak power densities without plasma ~ 48 MW/m2 on inner wall & 24MW/m2 on outer wall W-coated CFC tiles instead of Be tiles on inner & outer wall for areas at risk Real-time protection system  switch PINIs –off in case predicted tile temperature become too high JET inner wall

NBI-related modifications prior to ILW W-coated tiles on beam re-ionisation areas Another main chamber area made of W-coated tiles  Beam “re-ionisation” tiles Near poloidal limiter clockwise to beam ducts Take power loads from neutrals ionised in plasma edge that drift & impinge on outer wall Maximum power densities estimated to be 10th MW/m2

Operation of NBI in the ILW Record NBI power achieved Some delays at the beginning but finally new power supplies & control system successfully commissioned Record power 25.7MW (14 PINIs at 92 to 117kV) For the 1st time NBI power coupled for 15s from single PINIs Good behavior of actively cooled beam ducts designed to operated at max. temperature ~200OC Steady state temperatures achieved for 15s pulse 150 oC reached for 15MW injected from one beam duct

Operation of NBI in the ILW No issues but observation re-ionisation tiles heating No experimental observation of W increase due to fast D sputtering of W-coated CFC shine through tiles (inner wall) No issues with NBI fast ions losses (outer wall) Heating of the re-ionisation tiles observed for the 1st time Monitored by the protection of ILW (PIW) viewing system So far temperature reached was at max 870 oC  OK !

Outline Ion Cyclotron Resonance Frequency heating ICRF Neutral Beam Injection heating NBI Lower hybrid Current Drive LHCD For each heating systems System layout and capabilities Modifications to the wall or the systems for safe operation in the ITER-like wall (ILW) Operation of the systems during the 1st experimental campaigns with the ITER-like wall (ILW)  power achievements, heats loads issues & increase in plasma impurities content

JET ICRF system  4 antennas with new Be private limiters 4 antennas (A, B, C & D) called the A2s antennas Frequency range is 23 to 55 MHz Wave launched with symmetric spectra (“dipole” phasing) or asymmetric spectra (“± 90o” phasing) ICRF system is ELM tolerant (able to couple steady power on ELMs) ITER-like ICRF antenna not used during last campaign ITER-like wall related change : All private limiters changed from CFC to Be tiles [GRAHAM M., et al., PPCF (2012)]

Infra-Red view during operation of the antenna A & B ICRF operation in the ILW  No arcing issues, 4MW on type-I ELMs, heat-load within limits 1st possible issue  signs of arcing on new antenna Be private limiters or change in antenna behaviour No problem Up to usual maximum voltage (~30kV) reached 4MW on type I ELMy H-mode (with ¾ of the system) 2nd possible issue  heat loads due to ions accelerated in RF sheath rectified voltages A Maximum power load (estimated from IR thermography and a thermal model for the ILW Be tiles) was ~ 4.5 MW/m2 As design limit for the Be tiles is 6MW/m2 for 10s  we are safe but monitoring by viewing protection system is still needed. B [JACQUET et al., PSI2012] Infra-Red view during operation of the antenna A & B

ICRF / NBI pulse comparison ICRF operation in the ILW Good heating / Higher bulk radiation (W & Ni ) then with NBI ICRF / NBI pulse comparison Efficient electron heating As expected from H minority ICRF heating Long sawtooth periods characteristic of centrally peaked fast H ions pressure Bulk radiation with ICRF higher then for NBI and due to Higher W content Higher Ni content with Ni contributing to 20% of the bulk radiation Bulk radiation during ICRF minimized for higher edge density symmetric wave spectra (compared to asymmetric) by  H concentration up to 20% [BOBKOV et al., PSI 2012], [VAN EESTER et al., EPS 2012], [CZARNECKA et al. EPS 2012], [KLEPPER et al. PSI 2012]

JET Outer wall (simulated) & E// pattern (TOPICA) ICRF operation in the ILW No obvious sign of enhanced W emission from divertor entrance 1st possible W source to explain high W during ICRF  sputtering of divertor & its entrance by ions accelerated in RF sheaths rectified voltages Likelihood of effect emphasised by modelling  region of high E// connected to tile 8, B & C JET Outer wall (simulated) & E// pattern (TOPICA) The first effect that we have suspected is some interaction with the divertor and its entrance due to sputtering by ions accelerated in RF sheaths rectified voltages. The likelihood of this effect was confirmed by the electrical modelling of the A2s antennas that shown that the parallel electric filed responsible for the RF sheath extend on even in the poloidal limiter., which mean that the magnetic connection between RF sheaths definitely exist … nevertheless, when we looked at the W emission from the divertor and tile 8 and B there was no obvious difference with the NBI! Even if we have to keep in mind that tile C is not properly diagnose we started to look at interaction with the main chamber BUT …no obvious experimental observation W emission from divertor, tile 8 & B slightly higher during NBI ! Possible that we miss emission from tiles C not seen by diagnostics ? [BOBKOV, PSI 2012]

W and Ni source in recessed areas Responsible effect unclear? ICRF operation in the ILW W and Ni source from main chamber recessed areas Next possible W and Ni source in the main chamber  evidence seems by comparing ICRF and NBI heated limiter pulses and Be evaporation Comparison of the reference pulse before a light Be evaporation with a pulse just after a Be evaporation Reduction of the bulk radiation by ~ 45% Strong decrease of Ni & W emission Comparison of the reference pulse before with a pulse 11 ELMy H-mode after the Be evaporation Radiation still lower Ni & W emission still lower W and Ni source in recessed areas Responsible effect unclear?

Outline Ion Cyclotron Resonance Frequency heating ICRF Neutral Beam Injection heating NBI Lower hybrid Current Drive LHCD For each heating systems System layout and capabilities Modifications to the wall or the systems for safe operation in the ITER-like wall (ILW) Operation of the systems during the 1st experimental campaigns with the ITER-like wall (ILW)  power achievements, heats loads issues & increase in plasma impurities content

JET LHCD system  New Be frame, dedicated viewing system Lower hybrid current drive (LHCD) launcher 48 multi-junctions modules fed by 24 klystrons 3.7GHz ITER-like wall related change : Launcher frame in Be instead of CFC New LH viewing systems (IR, visible & pyrometers) to: Monitor possible damaging heat flux due to generation of fast electrons in front of the launcher Develop new arc detection systems based on visible light

LHCD operation with the ILW  2. 5 MW coupled trouble-free (max LHCD operation with the ILW  2.5 MW coupled trouble-free (max. until viewing system ready) Power density limited to 15MW/m2 (180 kW per klystrons) until dedicated viewing system on-line First image from IR camera viewing LH system only at the end of the campaign Visible camera available from mid-campaign 1st  wavelength filtering to minimize light from source others than arc Example: unstopped arc propagating on launcher Additional to the existing arc detection system, a real-time protection based on bright –spot detection being implemented 2.5 MW coupled trouble-free  no impurities, no heat loads issues [KIROV et al., EPS 2012]

Lot more to say….Poster Ex/4-3 tomorrow morning Summary Major upgrade of the NBI system Slow start but record power and power length were obtained We are now confident that NBI upgraded targets: 34 MW, 20s can be reach SAFELY in the next JET campaigns Good heating performance  started to use central electron heating to prevent W peaking in high performance scenarios [Pütterich Ex/P3-15 ] Higher bulk radiation  W & Ni  possible source of W from divertor entrance (not fully confirmed experimentally) & source of W & Ni from main chamber recessed areas In ITER  No main chamber recessed area made of W and Ni ! Interaction with divertor likely to be minimised (ratio antenna size/divertor surface, antenna position, design effort…) ICRF Lot of work involved for safe application of the heating power in the JET ILW Working group had been created to deal with issues of heating systems and ILW protection 3 years before any power application NBI LHCD Run so far at only at low power density because the viewing systems came on line only at the end of the campaign More to come next year… Lot more to say….Poster Ex/4-3 tomorrow morning