Obsprep Planning, 2017 Alan Bridger

Slides:



Advertisements
Similar presentations
ALMA Cycle 2 Capability Jongsoo Kim ALMA EA Korea node.
Advertisements

Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The March to Early.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array.
ALMA: The March to Early Science Al Wootten, ALMA/NA Project Scientist Cometary Radio Astronomy.
ALMA TACand the proposal process Lister Staveley-Smith Member, ALMA Review Panel.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array.
2008 Decmeber 5 ALMA-JT Science Meeting 1 ALMA Project News Koh-Ichiro Morita ALMAJ Project Scientist.
ALMA During Early Science
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
December 2007Chile Observatories Earthquake Preparedness Workshop1 Atacama Large Millimeter/submillimeter Array ALMA Eduardo Donoso.
Descripción y Areas del Dpto. de Computación de ALMA (ADC) Tzu-Chiang Shen Gerente del Grupo de Software Departamento de Computación ALMA Joint ALMA Observatory.
ALMA Common Software Basic Track Introduction to the ACS Framework.
ALMA Common Software Basic Track Software Engineering Basics.
Workshop in ALMA Logs Prepared by Juan Pablo Gil – Arturo Hoffstadt
NAASC Status and NSF Proposal Review & Recommendations Carol Lonsdale Head, North American ALMA Science Center ANASAC Sept 2010.
ICT Coordination and Planning Meeting #1 (17-19 April 2013) ALMA Dashboard 1.0 Giorgio Filippi The Atacama Large Millimeter/submillimeter Array.
EA ARC Ken Tatematsu East-Asian ARC Manager. ARC organization Difference between ARCS: NA: concentrated in Charlottesville Europe: distributed in different.
A Search for Hydroxlyamine (NH 2 OH) Towards IRC+10216, Orion-S, Orion(KL), SgrB2(N), SgrB2(OH), W512M, W3(IRS5) R. L. Pulliam NRAO / North American ALMA.
The ALMA Software and Release Management Ruben Soto Software Operations Group & Release Manager Joint ALMA Observatory.
ALMA Common Software Basic Track Component implementation guidelines.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The ALMA Observing.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The ALMA Observing.
Scheduling Blocks: a generic description Andy Biggs (ESO, Garching)
ALMA Common Software Basic Track Test Driven Development Unit testing and TAT.
ALMA Common Software Basic Track Logging and Error Systems.
ALMA Common Software Basic Track A walk through ACS functionality.
Atacama Large Millimeter/ submillimeter Array - ALMA ASAC Charge 3 For Oct 31 ASAC Report to ALMA Board Al Wootten JAO Interim Project Scientist.
ALMA Polarization Commissioning and Verification Status Kouichiro Nakanishi (Joint ALMA Observatory/NAOJ) on behalf of ALMA Polarization Commissioning.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Data Processing Progress.
Early Science Specification and Expected Array Evolution Masao Saito EA ALMA Project Scientist EA PS Report1 2nd ALMA Users Meeting 2011/1/13.
Computing ALMA Board Meeting November 2015 Jorge Ibsen Head of ADC, ICT Lead Contributions from: ADC Management (JAO): Achermann, Parra, Saldias, Shen,
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array.
ALMA and the Call for Early Science The Atacama Large (Sub)Millimeter Array (ALMA) is now under construction on the Chajnantor plain of the Chilean Andes.
ALMA’s Roots in Three Scientific Visions Paul Vanden Bout NRAO The Dusty & Molecular Universe – Paris 28/10/04.
ESO, 17 April 2007ESAC meeting1 ALMA offline User Test 5 Silvia Leurini, ESO.
Atacama Large Millimeter/ submillimeter Array - ALMA ASAC Charges For Oct 31 ASAC Report to ALMA Board Al Wootten JAO Interim Project Scientist.
ALMA Common Software Basic Track Project Lifecycle.
ALMA Common Software Basic Track Configuration Database.
ALMA Common Software Basic Track Component/Container Model and Lifecycle Management.
Charlottesville, November ALMA CSV Update Alison Peck Current status.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Dashboard upcoming features A Hales, ALMA and M Chavan, ESO
ALMA ANTENNA KEY SPECIFICATIONS
ACA TP Spectrometer Manabu Watanabe (NAOJ)
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
ALMA Common Software Basic Track
ALMA Software Scheduling subsystem Planning for cycle5 onwards
(on behalf of the POOL team)
ALMA Cycle 5 Hiroshi Nagai (NAOJ).
PRTS & KPI Nick Whyborn – Vasco Cortez
Shift Log Tool Refactoring
Upgrade to Oracle12c in February 2017 José Parra
SIP Report – Nov 2017 Overview Headlines Workstream report
Software Engineering: A Practitioner’s Approach, 7/e Chapter 2 Prescriptive Process Models copyright © 1996, 2001, 2005 R.S. Pressman & Associates, Inc.
Software Engineering: A Practitioner’s Approach, 7/e Chapter 2 Prescriptive Process Models copyright © 1996, 2001, 2005 R.S. Pressman & Associates, Inc.
ATACAMA LARGE MILLIMETER ARRAY
Atacama Large Millimeter Array
Amendment Invoice Task Force Progress Report
Welcome K. Y. Lo Director, NRAO
VLA to EVLA Transition Plan
EVLA Advisory Committee Meeting
PCS CCB Group 22nd February, 2017.
Amendment Invoice Task Force Progress Report
Atacama Large Millimeter Array Science IPT Review
Priorities and contents of releases
Amendment Invoice Task Force Progress Report
Amendment Invoice Task Force Progress Report
Executive Project Kickoff
XRN Nov 19 Release - Status Update
Presentation transcript:

Obsprep Planning, 2017 Alan Bridger

Development for Cycle5 Phase1, Status Cycle5 Phase1 requests totalled 72 tickets (as of yeterday morning), 19 High, 37 Medium, 16 Low. (Evolving as deferal takes place) 6 New Features, 42 Improvements, 24 Bugs To date: 23 Closed/Resolved, 5 Implemented/Verifying, 44 others Tickets implemented across releases 2016.6 (3), OCT2016 (18), NOV2016 (4) and DEC2016 (TBC, >20). Option to use FEB2017, but that is too late for further features/improvements. Will be bug fixes, minor changes only. We will not complete all 72 tickets for Cycle5. Will be ~ 2/3 complete.

Development for Cycle5 Phase1, Timeline Complete DEC2016 verification: 20-Jan, validation 27 Jan User test currently 2-13 Feb We propose earlier, start immediately after validation period, so about 27 Jan to 6 Feb So that can fix issues in FEB2017 release And bring validation start forward a little to overlap with verification (in a coordinated manner) Include Phase 1 SB generation test? (next talk) Acceptance 16-20 March CfP due 21 March

Development for Cycle5 Phase1, Issues Cycle5 yet again a tough assignment for developers. Key functional challenges: Changes to angular resolution interface – different options including capturing a range Much more complex than appears, potentially costly in cpu Implementing use of 90 deg Walsh function switching at Science Goal Level Without confusing the users (and developers) Adding storage of expected and overlaid spectral lines Again this apparently simple request hides a large number of details to resolve and has uncovered a splatalog issue. Improving speed of validation – this is just hard. And required APDM support classes changes. Band 5, until overlap concerns disappeared

Development for Cycle5 Phase1, Issues and also: Replacement for Java-applet version of Sensitivity Calculator in the Science Portal (browsers ceasing support) Re-implementation in javascript on-going Late tickets (mid- and even late-November…) Late arrival of specifications (still): As of mid-November approx 5 features were “almost” complete, but could not go in to OBSPREP-NOV2016 because we were still refining details with science. and we are still debating several other tickets (<14 development days left)

Development for Cycle5 Phase1, Issues And getting used to new process: When/where do we branch from and to? Now roughly understood How to announce where software is? Now understood Where to fix bugs found? In verification? Validation? Can we fix bugs found? Especially in Validation. Our understanding is that features failing validation should be removed: This might result in end user not being offered an agreed capability This will often take more effort than simply fixing the issue This is usually more risky than simply fixing the issue Note that NOV2016 release had 5 tickets. DEC2016 is likely to have > 20. (2016.6 had 3, OCT2016 had 18). Smoothing out of feature release is not panning out so far

Development for Cycle5 Phase2 So far Cycle5 Phase2 has 25 tickets as of now, more are very likely. Key points: Extend to Phase 2 some of the Phase 1 changes, e.g. 90 deg walsh follow through, adding spectral lines etc. Many items – e.g. support for multiple configs as result of angular resolution changes – in place now for Phase 1 SB generation More support for contact scientists Not sure yet how that is to be implemented – if it can be. User Testing? May/June 2017? Acceptance? TBD July 2017 Deployment 27 July 2017 To be delivered across MAR2017, APR2017, (MAY2017?)

Cycle6 As of yesterday morning Cycle6 Phase1 had 3 tickets, 1 of which will not be implemented (integrating OSS into OT), 2 of which may not be needed (reciever band overlap)? Situation is evolving as we start deferring Cycle5 tickets to Cycle6. So what are we doing? Expected potential requests: Remove 10 deg restriction on SB sources; High sensitivity array; OTFI; Science Goal dependencies; single dish continuum (fast scanning); “special” calibration modes/user intents (is this what “more options, more flexibility” means?) – there are 5 of these outlined so far; polarization; extentions to Solar/VLBI; daytime observing; usual changes to numbers;… This is more than enough for us.

TP Spectrometer TP Spectrometer expected to enter commissioning April 2019 Needs to be added to OT, Schedulng Block setup to facilitate commissioning. Of order 2 fte-months work. Requires APDM changes. Need to fit both into 2018 schedule -> Fewer Cycle7 tickets.

Agile Development – my personal view I am in favour of agile development… Must be matched to reality of client/stakeholder needs: The OT end-user expects 2 releases per year – monthly releases are of no interest to them The OT ALMA stakeholders (JAO, iSOPT, ...) expect certain feature to be present at time of deployment. Full stop. Must get developer buy-in: Developers must see this is helping them and their end-users Must not add to developer work-load for no obvious benefit I’m not convinced the new process is fulfilling those requirements. In particular I will examine very carefully what we can agree to achieve for Cycle6 – I expect to accept fewer “must do” features. This may improve quality. Is that an acceptable trade?

The Atacama Large Millimeter/submillimeter Array (ALMA), an international astronomy facility, is a partnership of Europe, North America and East Asia in cooperation with the Republic of Chile. ALMA is funded in Europe by the European Organization for Astronomical Research in the Southern Hemisphere (ESO), in North America by the U.S. National Science Foundation (NSF) in cooperation with the National Research Council of Canada (NRC) and the National Science Council of Taiwan (NSC) and in East Asia by the National Institutes of Natural Sciences (NINS) of Japan in cooperation with the Academia Sinica (AS) in Taiwan. ALMA construction and operations are led on behalf of Europe by ESO, on behalf of North America by the National Radio Astronomy Observatory (NRAO), which is managed by Associated Universities, Inc. (AUI) and on behalf of East Asia by the National Astronomical Observatory of Japan (NAOJ). The Joint ALMA Observatory (JAO) provides the unified leadership and management of the construction, commissioning and operation of ALMA.