Future Kicker Generator strategy

Slides:



Advertisements
Similar presentations
Instructional Decision Making
Advertisements

Gemini Re-platforming Project Update April This presentation is to provide an overview of the Gemini Re-platforming Project (GRP) and provide early.
1 The Nebraska Leadership Initiative Overview of Rationale and Research A Collaboration between NCSA, NDE, and ESUs.
Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
ITIL: Service Transition
DfES/MIAP Unique Learner Number Consultation: 1st December th March Briefing on the consultation into the feasibility of the Unique Learner.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
1/10/2014 LIU-PS ABT review1 T. Kramer, L. Ducimetiere, L. Sermeus.
Software Engineering. How many lines of code? Average CS1004 assignment: 200 lines Average CS4115 project: 5000 lines Corporate e-commerce project: 80,000.
ITIL as a Standard for Service Process Management Tavipark Sreesurichan.
Bring Your Business into the 21 st Century : Part 1 WasteExpo 2011 Improving Your Financial Management System.
Bruxelles Ansaldo STS – Company Profile nShield ARTEMIS Call
University of Missouri Shared Services Initiative Phase II November 1, 2010.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
CHANGE Chapter 13. The Concept of Change Change is taking part of the existing organisation and altering it to establish a new or different form. Change.
RAMSES PROGRAMME F. SZONCSO CERN – DGS/DI 31 st March 2014 CERN – GREECE INDUSTRY day1.
Kotter’s 8 Step Change Model
ABT Consolidation Review Electronics & Controls Etienne Carlier
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
YETS LHC 2015/16 - ABT Group TCM Francesco castronuovo.
Replacement of Obsolete/Old Hardware L. Ducimetière SPS Consolidation Review Luc Sermeus, Mike Barnes, Viliam Senaj, Thomas Kramer, Luis Feliciano, Vasco.
Our Iceberg Is Melting By: John Kotter.
SBDS – MKDV/H: The new MKDV Generator and additional Magnet for BA5 installation V. Senaj, L. Ducimetière November 20 th 2015.
LIU budget cuts – SPS savings? First brainstorming discussions!!! BG 30/4/14.
Overview of SAP Application Services By Accely. Introduction Developed organizations in any business industry will invest in SAP programs to offer progressive.
LIU-SPS T. Kramer, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 20 th November /11/2015 LIU-ABT Review - SPS2.
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
Serving IT up with ITIL By Thane Price. IT is the laboratory’s pit crew  Goal : Make technology transparent while accomplishing valuable internal customer.
1 DEPLOYMENT AND OPERATIONS MODULE 23 ECM SPECIALIST COURSE 1 Copyright AIIM.
2 BT.KFAs kicker rise time measurements (December 2015) L. Sermeus TE/ABT/FPS LIU-PSB meeting, 19 th January 2016.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Basic Principles of Good Management
Framework for Getting Results at Scale
ABT-EC EYETS Activities 2nd reports
CT Hardware Overview and Issues
Status and Plans for InCA
PS-CT: ERD-2 switch tank harmonization
Quality Management chapter 27.
LIU Wire Scanner Milestones June 2017
Uppsala Commitment to ESS and FREIA Planning
HV-Cables Current standard product is RG-220/U like cables from Draka. Limited to max. 40kV Not compatible for CPS SF6 gas filled PFL.
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
EC Activities Status for LIU September 2017
Perspectives on Change Management: Holistic Model of Change Agency
EC Activities Status for the LIU
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
TE-ABT Activities for LS2
prepared by R.A.Barlow 30/056/2016
As energy coordinator for CERN Accelerators & Technology
ISO New England System R&D Needs
Modulators - Inductive adder. Technical description.
the CERN Electrical network protection system
Introductions Graham Bowditch, OD Manager
COMMUNICATION BASED CHANGE IMPLEMENTATION FRAMEWORK: A NEW PERSPECTIVE
TK Upgrade report.
Laser activated thyristor. Technical description.
LIU and TE/ABT/PPE activities
ESS RF Development at Uppsala University
PS and SPS hydraulics convergence
Innovation and Change Copyright ©2017 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible.
Professional Certificate in Strategic Change Management
دکترشهرام شايان دکتراي تخصصي مديريت آموزش عالي
Software life cycle models
CIS 375 Bruce R. Maxim UM-Dearborn
Transformational Change Management> Sustainability
Case Study 1 By : Shweta Agarwal Nikhil Walecha Amit Goyal
Questions Team Time – get into your groups.
PS KFA45_17 Wire Measurements and Simulation
Presentation transcript:

Future Kicker Generator strategy Fantastic PPE-R&D team around Mike produced sound concepts for new solid state generators. The technology is not “future” any more. Prototypes are already next door! Despite limited resources CERN still leads in many ways. Numerous new activities world wide recently – it is now the time to ensure CERN doesn’t fall behind. All HV-cable activities progress Major spending's ahead Do we really want to spend ~800 kCHF as a first step of SF6 cable replacement?

R&D - Risk and Desperation YES we need to if we do not prioritize novel technologies now (or accept to take a major risk for CERNs operational performance). LS3 is too late for an efficient implementation of a new generator design without consolidation of existing systems. LS2 is perfectly situated to bring 1st novel systems partly into operation. Risk reduced transition allows to take “short cuts” (e.g. no new SF6 cables) How? (Without compromising LIU) BTW: “R&D” on Technical Risk Management for accelerator projects would be a beneficial topic…

How 1st stage: Accelerated Proof of Principle 2nd stage: Validation Less protected PFL: Operational RISK 1st stage: Accelerated Proof of Principle We have several test generators / applications (867) Go for 15 stage Marx Gen MKI test bench a.s.a.p. Aim at ~40 kV Marx test bed (check tr, tf ) Adapt FCC IA for PS purposes (~40kV, SC-mode proto) 2nd stage: Validation We have several modular CPS kicker systems (KFA-45, KFA-71, AD etc.) Install pre-series prototypes and use them for validation and reliability assessment during hybrid operations. E.g. one module of KFA-71 / KFA-45 Availability and full voltage capability not important fully protected Now until LS2 3rd stage: Full deployment Replace SF6 PFL systems step by step For EYETS 2023 deployment to KFA-71/79 (new location) KFA-4 (new location) and 45 in LS3 LS2 until EYETS post LS2 Future

Change Management Past Now Future Create urgency Form a powerful coalition Create a vision for change Communicate the vision No replacement for SF6 cables, unique supplier for thyratrons Ongoing Create quick wins MKI test bed LIU: Hybrid for KFA-45 ripple reduction CONS: SF6 cable replacement not needed Relocation plans simplified, Savings on maintenance etc ABT restructuring, R&D efforts across projects Build on the change Make it Stick Ongoing KFA-71/79 relocation KFA-45 upgrade . Kotter's 8-step model

Let’s get moving!