Bucharest – 18/9/2013. Procurement procedure of the awarding contracts by the Beneficiaries / Partners shall be in compliance with the procedural procurement.
Advertisements

Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Ministry of Foreign Affairs, Latvia 1 EC Cooperation with Third Countries EC Procurement to Third Countries prepared by Mauro Napodano
Characteristics of projects in EU research programmes
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – February 2004.
Tender Adjudication and Contract Monitoring. Introduction IMPORTANT Each tender is unique. Please ensure to read the tender document carefully.
Evaluation of Bids and Contract Award Module 6: Session 7.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
RELATIONSHIP BETWEEN THE MANAGING AUTHORITIES AND THE PAYING AGENCIES IN THE MANAGEMENT OF RURAL DEVELOPMENT PROGRAMMES Felix Lozano, Head of.
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – July 2004.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Marcy Mealy Procurement Specialist CDBG Program
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
1 EFCA - 21th March 2002 Raul Mateus Paula. 2 This presentation underlines: The key objectives of the Relex Reform The division of the responsibilities.
EuropeAid How can a private entity benefit from EC Service Contracts ? Jean-Louis VILLE Head of Unit « Finances, Contracts and Audit » Neighbourhood.
S3: Module D Physikalisch-Technische Bundesanstalt Session 3: Conformity Assessment Module D Peter Ulbig, Harry Stolz Belgrade, 31 October.
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
Conditions and Peculiarities of Submission of Complaints in Ukraine. Typical Errors/Infringements Relating to Submission of Complaints Kyiv, April.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
United Nations Procurement Division
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance.
VALUE FOR MONEY 1 OGC buying.solutions Procurement of Projects Presented by Andy Hamer Pre Accession Advisor, Finance Ministry.
1 Ensuring the protection of bidders’ rights.  The Federal Law of № 94-FZ "On placing orders for goods, works and services for state and municipal.
DG DEVCO, Unit B.6 Brussels, April Outline 1.Useful links 2.General conditions 3.General issues 2.
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
Geographical Enlargement of CERN Associate membership Principles and criteria S. Intoudi / 8 July
Cooperationand consortium building Luis Araque de Juan European Commission International Cooperation and Development DEVCO/EuropeAid Unit R.3 Legal Affairs.
CSO Observer Member of the Evaluation Committee. Civil Society Organization May have representation in the Evaluation Committee As a member of the Evaluation.
This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
BOS 1 Procurement of Goods and Works Asian Development Bank Business Opportunities.
Assessment of the Bidding Process in Construction Project ABDULLAH H. ABU ZANT. AYMAN K. ILAIWI. MOHAMMED FADEL. SODQI M. ALHNAINI. AN-NAJAH NATIONAL UNIVERSITY.
Public Procurement Agency - Bulgaria
Evaluation of Expression of Interest and Proposals
PRAG service – management of contracts, future aspects
Tender Evaluation and Award Process
Preparation of a tender and tender documents
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Content of Tender Dossier - Instructions to Tenderers - Tenders
Presented by: AfDB Team Facilitator: Sophie DIMBUNGU
Contract Award Procedures
Content of Tender Dossier Instructions to Tenderers
Particular Conditions of Contract & Appendix to Tender
Administration of a FIDIC Contract - Pre-Contract Phase -
Evaluation Grids Evaluation Grids.
What is a grant? A direct financial contribution – donation – from EU budget An action - contributing to EU policy achievement Functioning of a body acting.
Contract Award Procedures
PRAG PRACTICAL GUIDE TO CONTRACT PROCEDURES FOR EXTERNAL ACTIONS
4.2 Contract preparation and signature
Administration of a FIDIC Contract - Award to Commencement -
Tender Award, Cancellation and
PRAG service – Evaluation Process
PRAG PRACTICAL GUIDE FOR CONTRACT PROCEDURES
Tender Dossier as seen by Tenderers.
PROCUREMENT PROCEDURES
4.4 Procurement by grant beneficiaries
Project Implementation - Contract modification -
- Period before Tenders Submission –
Drafting the Guidelines for applicants
International Open Procedure (1) – PRAG 4.3
Particular Conditions of Contract & Appendix to Tender
Overview of the FEPAC Accreditation Process
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
Clarification meeting for tenderers
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Fasset Briefing Session
United Nations Procurement Division
Financial and Administrative presentation on PARTICULATES project
Presentation transcript:

Evaluation - Committee & Stages -

Evaluation Committee Members are appointed and nominated on a personal basis by the Contracting Authority and approved by the EC Delegation (Ex-Ante) NEW! The composition of the Evaluation Committee is deemed approved by the ECD if no objections is formulated within 5 working days (PRAG 2.8) The EvC should be formulated early enough (before the tender submission deadline) may be appointed on a permanent or ad-hoc basis, depending upon the number of envisaged evaluation highly recommended appointment of spare evaluators Assessors can be involved must attend all meetings and any absence has to be recorded and explained in the evaluation report have equal voting rights (Chairman and Secretary do not vote) must sign a Declaration of Impartiality and Confidentiality Note: As a general rule, the EC Delegation nominates an observer to follow all, or part of the Evaluation Committee proceedings

Evaluation Committee Members Voting members should have: Good command of language Relevant qualification or experience in the field Time  Assessment of evaluators is based on their CVs Within the Evaluation Committee there should not exist any subordination links that might jeopardize fair assessment, conflict of interest (towards tenderers, experts).

Responsibilities of Evaluation Committee Members 2.8.3 Chairman co-ordination, ensuring impartiality and transparency of the evaluation generally a high ranked official that also takes formal responsibility for endorsing the evaluation conclusions NEW! Article 2.2: Contracting Authority is responsible for chairing tender Evaluation Committees. Secretary – administrative tasks such as minutes, registers, compiling reports Voting Members collectively responsible for decisions taken by the Committee not indicated to appoint high ranked officials, they will not have the time to sit in the evaluation room for too many days Observers – non-voting All above members, must have a good knowledge of tender language and PRAG provisions, as well as of technical issues

Impartiality and Confidentiality 2.8.2 Declaration of Impartiality and Confidentiality (Annex A4) conflict of interest leads to withdrawal replacing a member withdrawing (spare evaluators) disregard assessment made by a withdrawing voting member

Evaluation Committee’s responsibilities The members of the Evaluation Committee have to be aware of their rights, obligations and responsibilities It is best practice to provide the voting members with the relevant documents (Instructions to tenderers, ToR, administrative and evaluation grid) beforehand

Stages of the Evaluation Process 4.3.9 Receipt and registration of tender bids – 4.3.9.1 Preparatory meeting – 4.3.9.2 Tender opening session – 4.3.9.3 Technical evaluation – 4.9.3.4: administrative compliance technical compliance Financial evaluation – 4.3.9.5 – mainly related to arithmetical corrections Choice of successful Tenderer – 4.3.9.6 Conclusion of Evaluation Committee – 4.3.9.7 Preparation of the Evaluation Report Contract preparation – 4.3.11

Tender evaluation principles A Tender Committee should only have the mandate to issue a recommendation as to the award of a contract The authorised officer of the Contracting Authority should make the formal decision and be held accountable for it

Tender Evaluation and Award Process

Preparatory meeting 4.3.9.2 Tender dossier circulated in advance First meeting of the Evaluation Committee Chairman reminders Discussion of Evaluation Criteria and of possible difficulties that may be encountered, for ensuring a consistent approach

Tender Opening Session 4.3.9.3 To check that tenders are complete and requisite tender guarantee has been provided. Tenderer’s Representatives may attend – formal public process. Non-public opening of tenders at a formal meeting is acceptable, particularly for low value contracts Tender opening checklist (annex C5) Tasks of Chairman and Secretary Declaration of Impartiality and Confidentiality to be signe by every EvC member

Tender Opening Session 4.3.9.3 Formal compliance recorded in summary of tenders received in Tender Opening Report (annex C6) The minutes of the tender opening should be sent to the participants, upon written request At a public tender-opening session: the names of the Tenderers, the unevaluated tender prices, provision of requisite tender security and fulfilment of any other stipulated formality or condition Minutes of Tender Opening Session may be distributed to participants, upon written request

A technical evaluation of tenders is to determine the offers compliance with Tender Documents requirements – 4.3.9.4 Technical evaluation is only carried out for administratively compliant offers, satisfying the qualifications criteria The Technical submission must meet at least the minimum requirements of the Tender Documents for the tender to be deemed substantially responsive An offer can only be judged against criteria set in Tender Documents (and clarifications) To this end, it is recommended to spend sufficient time when preparing the evaluation grids and to make sure all important aspects were taken into consideration Evaluation period and Report approval should not exceed the tenders validity period

A financial evaluation of tenders is to determine the lowest price – 4 If the offer is technically compliant with the Tender Documents requirements If the award criteria is the lowest price the process is simplified If the award is to be the most economically advantageous tender, the technical evaluation is measured against the award criteria in the Tender Dossier Need to consider costs of operation, maintenance and consumables, trainings, after-sales services – all these must be reflected in criteria set in the Tender Dossier Technical evaluations are combined with financial evaluation to determine the most economical advantageous tender

Financial Evaluation – 4.3.9.5 Once technical evaluation completed, the Committee takes forward the technically compliant offers, for Financial Evaluation. Offers are checked for arithmetical errors and conform corrections with Tenderer, without penalties. In case of multiple Lots, Financial offers must be compared for each Lot, taking into account eventual discounts granted by Tenderers. Special care in case of variable discounts granted in case of more Lots awarded!!! Always request discounts in the form of percentages!

Choice of Contractor – 4.3.9.6 The successful Tenderer is the one submitting the least expensive technically compliant offer and equal, or under the available budget. In case of budget exceeding, tender procedure is cancelled and Contracting Authority may? proceed with Negotiated Procedure (4.4.4.1). In case of abnormal low offers, Contracting Authority may reject the tender but ONLY after requesting in writing details on price constituent elements, e.g. economics of manufacturing process, chosen technical solution, etc.

Conclusion of Evaluation Committee – 4.3.9.7 After due deliberations, Evaluation Committee may recommend: Award the contract to the Tenderer that submitted a tender: compliant with formal requirements and eligibility rules. technically compliant. that is the least expensive tender. whose price is equal, or under the available budget. Cancel the tender process (4.3.10), when: no qualitatively or financially worthwhile tender received the economic or technical data of the project have been fundamentally changed exceptional circumstances or force majeure render normal performance of the contract impossible all technically compliant tenders exceed the financial resources available there have been irregularities in the procedure

Notification of an Award – 2.9.1.1: the Contracting Authority must notify Tenderers promptly about their award decision, within the tender validity period this may include a decision to abandon an award procedure after invitations to tender notification of successful Tenderer, implies automatic extension of his tender for a period of 60 days evidences required in TD must be submitted by successful Tenderer within 15 days from notification if a financing agreement is not in place at the time of the tender procedure (suspension clause - 2.4.13), successful Tenderer shall not be notified until such agreement has been concluded.

Contract preparation – 2.9.1.2 Documents to be considered for Contract preparation: explanatory note (form A6) copy of financing agreement copy of tender announcements, Tender Opening Report, Evaluation Report and any other relevant information prepare three (four – Ex-Ante) originals All standard annexes must be reproduced without modification in all copies of the contract, except Special Conditions that need to be completed by Contracting Authority (adjusted during tendering phase).

Contract signature – 2.9.1.2 Once contract prepared: CA signs and date all copies and initial Special Conditions pages send contract to EC Delegation for endorsement (until EDIS) send Contract to successful Tenderer, who must countersign within 30 days of receipt and before the tender validity period, and prior to the contracting deadline!!! Contractor keep an original and returns the other to CA, with eventual guarantees. One original to ECD (until EDIS). Failure to sign the contract within the deadline, the contract preparation re-start from step 1, awarding the contract to the second ranked tender. Contract only takes effect on the date of the later signature!!!

Conclusions: If you find yourself in a tender committee, then here are a few points: Conduct preliminary meeting of committee before tender opening to discuss tactics, programme and if appropriate, marking and weighting. All voting committee members must read and evaluate all tenders. If a majority vote is recorded for any particular aspect the dissenting voter must briefly record their reasons. Differentiate between must do / have items ( e.g. bank guarantees) and minor issues (e.g. missing parameter). Be logical, but keep your approach and method simple, always return to basics. Make your own clear notes of your views and decisions so that you can recall issues should there be an audit. Be prepared to answer an economic operator’s appeal against the award (if allowed). Fair Competition!!!