SLS Vertical Emittance Tuning

Slides:



Advertisements
Similar presentations
Low Emittance Tuning (LET). Through Dispersion Free Steering.
Advertisements

Transparent Re-alignment of the Diamond Storage Ring M. Apollonio – Diamond Light Source Ltd ESLS – XXII Workshop, ESRF Grenoble, November 25 th /11/2014M.
Ultra Low Vertical Emittance at the Australian Light Source Mark Boland on behalf of Rohan Dowd 1.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
Experimental Plan for Achieving Low Emittance in CesrTA David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
January 15, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity December/January vs September/October -Machine studies and instrumentation -Simulation.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
LCWS 2012 – CLIC/ILC working group on Damping Rings
Dream test facilities for Damping ring R&D October 25 th, 2012 Yannis PAPAPHILIPPOU CERN.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
ATF DR Overview Introduction Low emittance history Present status S.Kuroda ( KEK ) GDE Review 3rd Apr.2013.
J. Pfingstner Jitter studies February 12, 2014 Optics corrections in the ATF damping ring Jürgen Pfingstner, Yves Renier.
Permanent magnet wiggler based on NdFeB material. This wiggler type uses the same design principles as the wigglers which have been developed for PETRA.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Methods for reaching ultra-low vertical emittance: the SLS experience Masamitsu Aiba, Michael Böge, Natalia Milas, Andreas Streun, PSI 1. Vertical emittance.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Containing a.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement LOW-ε-RING network:
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Advanced Optics Control, CERN, Masamitsu Aiba, PSI Recent optics measurements at SLS M. Aiba, M. Böge, Á. Saá Hernández, D. Mayilyan and.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
Angela Saa Hernandez, Martin Rohrer, Volker Schlott, Andreas Streun (PSI, Switzerland) Jonas Breunlin, Åke Andersson (MAX IV Laboratory, Sweden) Natalia.
WP8-HGA High Gradient Acceleration M. Biagini (INFN-LNF) WP8 coordinator Tiara Kickoff Meeting, CERN, Feb , 2011.
FP7: EuCARD after a year of preparation… A.Jeremie.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
LCWS, UTA, Reaching ultra-low emittance at SLS through (systematic and) random optimization LCWS 2012 Joint CLIC/ILC Working Group – Damping.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
WP9 updated Upgrade of SPARC test facility for high gradient acceleration of electron beams for SuperB collider and FEL projects WP number9Start month1End.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
Damping rings, Linear Collider School Low vertical emittance tuning Yannis PAPAPHILIPPOU Accelerator and Beam Physics group Beams Department CERN.
A. Saa Hernandez on behalf of the TIARA WP6 collaboration
Task 9.4 Beam Delivery System CERN, 27-Mar /3/2009
The Engineering Test Facility for nLC
WP9-SuperB in TIARA M. Biagini, INFN-LNF.
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Emittance Dilution and Preservation in the ILC RTML
Test of Optical Stochastic Cooling in CESR
SLS-2 – Ugrade of the Swiss Light Source
Test of Optical Stochastic Cooling in CESR
Lecture A3: Damping Rings
Coupling Correction at the Australian Synchrotron
TIARA WP8 Status M. Biagini, INFN-LNF, for WP8 TIARA Mid-Term Meeting
Mark Palmer Co-Convener CLIC-ILC Damping Ring Working Group
Low Emittance Tuning in CESR TA
LER 2010 Overview (and other)
M. Tigner, R. Helms, M. Palmer, D. Rubin, D. Sagan Cornell University
Beam-Based Alignment Results
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Low Emittance Tuning David Rubin Cornell Laboratory for
CLIC damping rings working plan towards the CDR
CesrTA Low Emittance Program David Rubin Cornell Laboratory for
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
ThomX – Commissioning Meeting – 25/01/2018
Proposal for a CESR Damping Ring Test Facility
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
DYNAMIC APERTURE OF JLEIC ELECTRON COLLIDER
Presentation transcript:

SLS Vertical Emittance Tuning TIARA Kick-Off Meeting WP6 - "SVET" (E. Jensen/CERN) 23-Feb-2011 SLS Vertical Emittance Tuning Objectives, Organization, Timeline Erk JENSEN/CERN TIARA Kick-Off Meeting, CERN, 23-24 February 2011

TIARA Kick-Off Meeting WP6 - "SVET" (E. Jensen/CERN) 23-Feb-2011 The Main message: This is a Kick-Off Meeting: TIARA has started officially on January 1st, 2011! SVET project active during 30 months: January 1st, 2011 – June 30th, 2013

WP6 (SVET) SVET: “SLS Vertical Emittance Tuning” Objectives: TIARA Kick-Off Meeting WP6 - "SVET" (E. Jensen/CERN) 23-Feb-2011 WP6 (SVET) SVET: “SLS Vertical Emittance Tuning” Russian “Свет” means “light” Objectives: Convert the Swiss Light Source (SLS) to a R&D Infrastructure, Demonstrate ultra-small emittances as required for future Linear Collider Damping Rings (5 nm normalized, <1 pm @ 2.86 GeV) Enable to extend tests to lower energies (IBS dominated regime).

Small emittances TIARA Kick-Off Meeting WP6 - "SVET" (E. Jensen/CERN) 23-Feb-2011 Small emittances

TIARA Kick-Off Meeting WP6 - "SVET" (E. Jensen/CERN) 23-Feb-2011 The Main players PSI: Masamitsu Aiba, Michael Boege, Andreas Streun, ... CERN: Yannis Papaphilippou, Fanouria Antoniou, (?) BE-BI... INFN/LNF: Marica Biagini, Simone Liuzzo, Fabio Marcellini, Mario Serio, ... Max-IV Laboratory (via PSI): Åke Andersson, ...

What it takes: Step 1 Step 1: With the existing hardware: TIARA Kick-Off Meeting WP6 - "SVET" (E. Jensen/CERN) 23-Feb-2011 What it takes: Step 1 Step 1: With the existing hardware: Ensure optimum measurement accuracy (beam size, position, emittance, coupling, ...) Minimize magnetic field errors alignment of girders/magnets alignment of BPM’s Minimize betatron coupling (using exisiting skew quads) Result: Show what is possible & where improvements are needed. Interim report due in May, 2011 (Milestone), final report due: Month 9, September 2011

What it takes: Step 2 Step 2: With those results: TIARA Kick-Off Meeting WP6 - "SVET" (E. Jensen/CERN) 23-Feb-2011 What it takes: Step 2 Step 2: With those results: Specify the necessary improvements of Beam position monitors, Beam profile (emittance) monitors, Emittance control knobs, Magnet trimming coils and supplies Result: Specification of upgrades (Specifications due: Month 18, June 2012)

What it takes: Step 3 Step 3: Implementation of upgrade: TIARA Kick-Off Meeting WP6 - "SVET" (E. Jensen/CERN) 23-Feb-2011 What it takes: Step 3 Step 3: Implementation of upgrade: Down-select most important hardware to be implemented (financial constraints), planned: improved BPM’s and/or alignment correction knobs and feedback algorithms (automated coupling control) improved resolution/sensitivity beam profile monitor (laser based?) knob allowing energy scaling Fabricate hardware, Install hardware in SLS Result: An improved SLS, allowing to reach smaller vertical emittances at different energy levels. (Implementation due: Month 24, December 2012)

TIARA Kick-Off Meeting WP6 - "SVET" (E. Jensen/CERN) 23-Feb-2011 What it takes: Step 4 Step 4: Commissioning: Commission improved BPM and/or alignment system Verification of the automated coupling control Commission new beam profile monitor (the commissioning at lower energy is not formally included due to financial/time constraints) Result: Final report on obtained results, due Month 30, June 2013

TIARA Kick-Off Meeting WP6 - "SVET" (E. Jensen/CERN) 23-Feb-2011 WP6 (SVET): Gantt chart

WP6 (SVET): Resources Person-months: Material: Travel: TIARA Kick-Off Meeting WP6 - "SVET" (E. Jensen/CERN) 23-Feb-2011 WP6 (SVET): Resources Person-months: Material: Travel: travel unit=625 € CERN INFN PSI total direct k€ total k€ pm 16.5 11.5 45.5 73.5 556.83 785 CERN INFN PSI direct k€ total k€ k€ 215 258 CERN INFN PSI total direct k€ total k€ units 16 9 11 36 22.5 34.5 k€ 794.33 1077.57

Already Ongoing at Kick-off: TIARA Kick-Off Meeting WP6 - "SVET" (E. Jensen/CERN) 23-Feb-2011 Already Ongoing at Kick-off: PSI is in the process of opening a post-doc position. We need a communication platform (collaboration web-space) We need clear indication for the necessary form and dissemination procedure for different reports (TIARA reports?, templates?, ...) http://www.eu-tiara.eu/rtd/index.php?id=42