Mini-Trigger/DAQ workshop,OCU

Slides:



Advertisements
Similar presentations
STAR Status of J/  Trigger Simulations for d+Au Running Trigger Board Meeting Dec5, 2002 MC & TU.
Advertisements

Dec/02/04 Su DongCaltech Trigger/DAQ/Online workshop1 Level 1 Trigger: Introduction L1 trigger objects and strategy Implementation features L1 composition.
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
The Silicon Track Trigger (STT) at DØ Beauty 2005 in Assisi, June 2005 Sascha Caron for the DØ collaboration Tag beauty fast …
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
W trigger upgrade simulation Kazuya Aoki Kyoto Univ. Muon Physics and Forward Upgrades Workshop Santa Fe, June 2004.
Tau Jet Identification in Charged Higgs Search Monoranjan Guchait TIFR, Mumbai India-CMS collaboration meeting th March,2009 University of Delhi.
INSTR-08, BINP, Novosibirsk 1 Belle calorimeter upgrade B.Shwartz, Budker Institute of Nuclear Physics Novosibirsk on behalf of BELLE calorimeter.
SuperKEKB 1st open meeting 1 Belle calorimeter upgrade B.Shwartz, on behalf of BELLE calorimeter group.
The Design of Barrel Electromagnetic Calorimeter (BEMC) October Lu Jun-guang.
Simulation Calor 2002, March. 27, 2002M. Wielers, TRIUMF1 Performance of Jets and missing ET in ATLAS Monika Wielers TRIUMF, Vancouver on behalf.
1 A ROOT Tool for 3D Event Visualization in ATLAS Calorimeters Luciano Andrade José de Seixas Federal University of Rio de Janeiro/COPPE.
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
ECL trigger for Super Belle B.G. Cheon (Hanyang U)‏ KEK 1 st open meeting of the Super KEKB Collaboration.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Ursula Bassler, LPNHE Paris1Collaboration Meeting - 13 Sept Calorimeter: Status & Plans Preamp/ Driver Trig. sum Filter/ Shaper x1 x8 SCA (48 deep)
Results from particle beam tests of the ATLAS liquid argon endcap calorimeters Beam test setup Signal reconstruction Response to electrons  Electromagnetic.
Particle Identification at BESIII Kanglin He April 23, 2007, Amsterdam.
Trigger and DAQ System Zhao Jing Wei Sept. 2002, BESIII review, Beijing Outline Trigger system Event rate estimation Principle of design Scheme Monte Carlo.
B.G.Cheon Mini-Trigger/DAQ workshop,OCU ECL Trigger overview ByungGu Cheon (SKKU) Outline  ECL calorimeter  ECL trigger scheme & performance.
Overview of the High-Level Trigger Electron and Photon Selection for the ATLAS Experiment at the LHC Ricardo Gonçalo, Royal Holloway University of London.
Progress on F  with the KLOE experiment (untagged) Federico Nguyen Università Roma TRE February 27 th 2006.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
BESIII EMC Simulation & Reconstruction He Miao
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment is one of the four major experiments operating at the Large Hadron Collider.
The Prototype Simulation of SDHCAL Ran.Han Gerald.Grenier Muriel.Donckt IPNL.
Studies of Electroweak Interactions and Searches for New Physics Using Photonic Events with Missing Energy at the Large Electron-Positron Collider Marat.
1 Plannar Active Absorber Calorimeter Adam Para, Niki Saoulidou, Hans Wenzel, Shin-Shan Yu Fermialb Tianchi Zhao University of Washington ACFA Meeting.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment [1] is one of the four major experiments operating at the Large Hadron Collider.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
Preliminary Design of Trigger System for BES III Zhen’an LIU Inst of High Energy Physics,Beijing Oct
S. Dasu, University of Wisconsin February Calorimeter Trigger for Super LHC Electrons, Photons,  -jets, Jets, Missing E T Current Algorithms.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
Sridhara Dasu115 April 2002 L1CaloTrigger Algorithms Sridhara Dasu University of Wisconsin Algorithms: Details, Updates and Simulation - 2 x cm -2.
ATLAS UK physics meeting, 10/01/08 1 Triggers for B physics Julie Kirk RAL Overview of B trigger strategy Algorithms – current status and plans Menus Efficiencies.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Calorimeter Status Electronics Installation and Commissioning
Status of BESIII and upgrade of BESIII
More technical description:
Performance of jets algorithms in ATLAS
Status of Electronics Simulation and Energy Resoluton Estimation
Recent progress of PureCsI+APD readout
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
3rd European Nuclear Physics Conference
Status of 100Mo based DBD experiment
Commissioning of the ALICE HLT, TPC and PHOS systems
Trigger, DAQ, & Online: Perspectives on Electronics
CMS Preshower: Startup procedures: Reconstruction & calibration
Sr-84 0n EC/b+ decay search with SrCl2 crystal
Special edition: Farewell for Valerie Halyo
Belle calorimeter upgrade on behalf of sBELLE calorimeter group
The Silicon Track Trigger (STT) at DØ
The First-Level Trigger of ATLAS
p0 life time analysis: general method, updates and preliminary result
Special edition: Farewell for Stephen Bailey
A. Gasparian NC A&T State University, Greensboro, NC
BESIII EMC electronics
Special edition: Farewell for Eunil Won
Trigger session report
Commissioning of the ALICE-PHOS trigger
The KL reconstruction for the Belle experiment at KEK B-factory
3rd Open Meeting of the Belle II Collaboration
Mini Tower Preliminary Results
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
The LHCb Front-end Electronics System Status and Future Development
Trigger operation during 2007 run
Calorimeter Upgrade The Tevatron and Dzero Upgrades
Presentation transcript:

Mini-Trigger/DAQ workshop,OCU ECL Trigger overview ByungGu Cheon (SKKU) Outline ECL calorimeter ECL trigger scheme & performance Recent trigger upgrade status ECL trigger system @ 1035 super-KEKB Summary 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Belle ECL (Electromagnetic Calorimeter) 8736 CsI(Tl) crystals g & e energy and position measurement Trigger info. generation : powerful tool to suppress BG events. 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Mini-Trigger/DAQ workshop,OCU ECL Trigger Trigger concept/requirement Suppress beam-BG and cosmic events Separate physics events from Bhabha/gg Fast trigger decision < 1.85 ms Good timing resolution Trigger condition Trigger Cell (4x4 matrix) : ETC > 100MeV Energy trigger : Total energy sum > 1GeV Isolated cluster counting trigger : # of clusters > 3 Bhabha & cosmic-veto triggers 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Mini-Trigger/DAQ workshop,OCU Trigger Cell Map Analog cell 576 Trigger cells ICN 136 Analog cells  ETOT & Bhabha/gg Physics trigger region (Etot / ICN) 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Mini-Trigger/DAQ workshop,OCU Bhabha/gg trigger Using Back-to-Back condition of each bhabha type depending on qLAB angle with high energy threshold. Bhabha type Threshold (GeV) Type 1 5.0 Type 2 5.5 Type 3 Type 4 Type 5 Type 6 Type 7 Type 8 Type 9 Type 10 Type 11 3.0 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Mini-Trigger/DAQ workshop,OCU Cosmic veto trigger Using naive event topology of hadronic process events against cosmic ray and beam BG topologies. energy trigger effi. r-f Plane in Barrel Region B A B A IR IR C D C D 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Mini-Trigger/DAQ workshop,OCU Trigger Scheme Isolated cluster counting trigger Energy trigger and Bhabha trigger 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Mini-Trigger/DAQ workshop,OCU Trigger efficiency Energy trigger ICN trigger Bhaha trigger e ~ 97% e ~ 95% e ~ 99% 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Mini-Trigger/DAQ workshop,OCU Trigger rate tendency ETOT>0.5GeV ETOT>1.0GeV ETOT>3.0GeV Trigger rate : 900Hz, 400Hz, 250Hz @ 7x1033 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Mini-Trigger/DAQ workshop,OCU Trigger rate tendency ICN bit0 ICN bit1 trigger rates @ 7x1033 : 10KHz, 1.3KHz, 55Hz, 17Hz ICN bit2 ICN bit3 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Mini-Trigger/DAQ workshop,OCU Trigger rate tendency trigger rate @ 7x1033 : 350Hz, 100Hz, 10KHz, 14KHz Bhabha Pre-Bhabha Cosmic Timing 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Motivation for new trigger system Weakness of Bhabha trigger for e+e-  gX event selection Separate Bhabha and gg events in the trigger level Expect much stable Bhabha/gg tagging than current system Using f directional Back-to-Back condition Tag of eegX Matching with track trigger bits MC simulation study Bhabha trigger efficiency : 99% gX trigger efficiency : 37%  72% 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Electronics flow chart New trigger system 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Mini-Trigger/DAQ workshop,OCU Hardware in new system BTL TPSD CVC ETM (32) (4) CCM & EBM STM AAA Newly added chain GDL 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Mini-Trigger/DAQ workshop,OCU Bhabha/gg tagging r-z plane r-f plane 5 1 Back to back for q Back to back for f 8 overlapped sectors Bhabha = q & f !! For f, 8 overlapped signals @ r-f plane. 4 back to back combined signals. 4 back to back combined signals with different threshold For q, 16 overlapped signals @ r-z plane. 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Mini-Trigger/DAQ workshop,OCU Bhabha, gg and gX Back-to-Back r-f plane ECL 1 5 2 6 3 7 4 8 5 1 CDC 1 5 2 6 3 7 4 8 8 overlapped sectors Bhabha trigger : ECL(1&5) & CDC(1&5) gg trigger : ECL(1&5) & CDC(0&0) Generate triggers by matching with track information ! gX trigger : ECL(1)+CDC(0) & Bhabha/gg veto 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Logic simulation study 5 1 & & TRK 1 & 5 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Threshold calibration Threshold table for r-z Threshold for r-f ( GeV ) D 1 5 3GeV 7GeV Type 1 2 3 4 5 6 7 8 9 10 11 FWD 4.5 ---- BWD 3.5 Threshold calculation ON ON+OFF 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Threshold calibration Setting of threshold for all channels 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Expected L1 trigger rates @ 1035 super-KEKB Trigger bit Rate @ 1035 ETOT>0.5GeV 6.5K ETOT>1.0GeV 3.4K ETOT>3.0GeV 2.5K ICN bit-0 18.0K ICN bit-1 5.0K ICN bit-2 0.5K ICN bit-3 0.2K Bhabha Pre-Bhabha 1.5K Cosmic 38.0K CsI timing 110.0K Estimated with current trigger performance Depend on super-KEKB beam condition Some flexibility: ETC & physics trigger region Optimize btw trig efficiecny and trig rates TC pulse width : 1ms TC occupancy < 10KHz @ 1035 Current L1 trigger system can be kept. 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

L2/L3 trigger @ 1035 super-KEKB It’s rather difficult to make concrete plan to prepare L2/L3 triggers before Trigger+DAQ readout scheme is finalized. slow preAmp Shaper Flash-ADC L2/L3 PC farm Software triggers for ECL ET balance ECL/CDC matching TC hitmap pattern Total Energy Cluster finding logic fast ECL L1 trigger GDL CDC L1 trigger TOP L1 trigger KLM L1 trigger 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

CsI(Tl) Barrel + pure-CsI Endcap Current trigger system should be modified to accommodate both outputs in the trigger level. Simple(?) concept to modify endcap electronics : preAmp  fast shaper  STM for Barrel region preAmp  new fast shaper  STM for endcap region pulse height correction + active timing delay potential problem of trigger timing resolution Crystal  g/cm3 X0 cm em nm Nph/MeV decay nsec CsI(Tl) 4.51 1.86 550 52000 1000 CsI 305/400 5000 10/1000 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU

Mini-Trigger/DAQ workshop,OCU Summary Current ECL trigger works well and new Bhabha trigger system is in progress. We expect the new system to be implemented before KEKB winter shutdown. Current ECL trigger system can be used at 1035 super-KEKB. Trigger electronics R&D work is necessary if pure-CsI is chosen to endcap calorimeter. 2002.10.28-29 Mini-Trigger/DAQ workshop,OCU