ESB Networks IT Market Retail Systems.

Slides:



Advertisements
Similar presentations
Mass Rollout in Finland A Service Provider Perspective
Advertisements

Implementing ideas and transforming information into business result Aadi Ideology Services Pvt Ltd Sales Force Tracking.
WMS – Warehouse Management Systems
OneBridge Mobile Data Suite Product Positioning. Target Plays IT-driven enterprise mobility initiatives Extensive support for integration into existing.
© 2012 Infotech Enterprises. All Rights Reserved We deliver Global Engineering Solutions. Efficiently.June 13, 2014 Spatial Information - Enabler for Smart.
Enterprise Business Solution Professional Support Group.
Service Oriented Architecture Terry Woods Session 50.
Corporate Overview.
ACCOUNTING INFORMATION SYSTEMS
© 2011 Infotech Enterprises. All Rights Reserved We deliver Global Engineering Solutions. Efficiently.August 8, 2015 Infotech Service Offerings Rajnish.
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
METERING SOLUTIONS Leon de Nysschen 20 April 2017.
第三組 Produce a report on 1.SAP NetWeaver 2.SAP Web Application Server 3. SAP Solution Manager ~ Team member ~ 何承恩 謝岳霖 徐翊翔 陳鼎昇.
Summary Device protocols tied intimately to applications. A need to significantly reduce critical data update times. Current network bandwidth consumption.
ePATHUSA’s Application Development & Maintenance Services
1 © 2007 Electric Power Research Institute, Inc. All rights reserved. Managing Complexity: The IntelliGrid Environments External Corporations Corporate.
Optimised Scheduling System 1 Improvements to Appointments functionality and changes to Extranet Presentation to Industry Governance Group 23 rd February.
ESB Networks Market Release Meeting of the IGG, 20 th August 2009.
Information Technology Needs and Trends in the Electric Power Business Mladen Kezunovic Texas A&M University PS ERC Industrial Advisory Board Meeting December.
IGGIGG Industry Governance Group Secretariat: RMDS Secretariat: RMDS 1 IGG Agenda 12 th October 2010 Minutes from Previous IGG Meeting.
IGG 05/03/ ERP6 Upgrade and Address Validation Issue Mary Mulcahy ESB Networks.
Advanced Metering Rule Christine Wright Public Utility Commission of Texas June 6, 2007 Retail Market Workshop COMET WG Meeting.
25 April Unified Cryptologic Architecture: A Framework for a Service Based Architecture Unified Cryptologic Architecture: A Framework for a Service.
Objectives: Upgrade Siebel to a supported application Upgrade Oracle database to current version Deliver all existing user functionality with no degradation.
Consumers Energy Advanced Metering Infrastructure Review and Feedback Utility AMI / Open HAN Meeting August 15, 2007.
Advanced Metering Implementation Team Update Presentation for RMS Christine Wright, Competitive Markets Division Public Utility Commission of Texas June.
Business Intelligence dan Dashboard Ensys – minggu ke 6.
Enterprise Resources Planning (ERP) Definition 1 Enterprise Resource Planning A method for the effective planning and controlling of ALL these sources.
ERP Implementation Choices Indian Institute of Materials Management
Tago Tago IoT DAY GRAIN BIN LEVEL? The epicenter of middleware
EMC: Redefining ERP and ROI with a Virtualized SAP HANA® Deployment
AMI Enterprise Task Force of the Utility AMI Working Group
MPCC Architecture Review
IGG Agenda – April 19th 2007 Minutes from last IGG meeting – 10.10
ESB Networks Market Release Meeting of the IGG, May 28th 2009
Maintenance Ticketing Gateway (MTG) CEMR/MEDIACC Replacement
ESB Networks IT Market Retail Systems.
Retail Market Assurance Services for the Irish Electricity Market
UNIT –V SUPPLY CHAIN MANAGEMENT
Customer Service Update to IGG
IGG Agenda 17th December 2009 Minutes from Previous IGG Meeting
ESB Networks AIP Programme
Information Technology (IT) Department
Presentation to Industry Governance Group 6th April 2011
SAP S/4HANA 1709 – SAP S/4HANA Suite
Service PSU Ben Battaglia, Director Enterprise IT
Social Media in the Automation Industry
Harmonisation Working Group Update on Harmonisation Project
IGG Agenda 1st October 2009 Minutes from Previous IGG Meeting
Application of DUoS Tariffs
ESB Networks Harmonisation Technical Design Options
How businesses use information systems (Part 2)
ESB Networks Market Release Meeting of the IGG, March 5th 2009
IGG Agenda – August 10th 2006 Minutes from last IGG meeting – 10.15
Organizing Semantics For Effective Enterprise Application Integration
ACCOUNTING INFORMATION SYSTEMS
Advance Metering Infrastructure (AMI) system awareness Training
IGG Agenda – 15th May 2008 Minutes from last IGG meeting
April May April May June July July June August Sept August
IGG Agenda 29th June 2011 Minutes from Previous IGG Meeting
ESB Networks Market Release Meeting of the IGG, April 16th 2009
IGG Agenda 26th August 2010 Minutes from Previous IGG Meeting
Internet of Things Stay Relevant in Digital Era
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
Enduring Solution – Stage 2 (ES-S2)
Microgeneration 26th August 2010 ESB Networks
Smart Prepayment Solutions for PV/SSEG
Workshop: High Level Reporting
Tom O’Donnell Market Services Co-Ordinator
Shipper MI (Shipper Pack / PARR)– Update
Presentation transcript:

ESB Networks IT Market Retail Systems

ESBN retail market system/s WEB Appointment Slot Areas Suppliers Network Services Technicians Market Messages SAP ISU Meter Asset Management Meter Works Orders MAU Client Customer Orders Areas MW Order Status (400 Technicians) Scheduled MW Orders Network Projects Technicians SAP Mobile SAP R/3 ARM Inspection Orders Maintenance Policy Scheduled Maintenance Orders MAM Client Assets Register Follow up Maintenance Orders Work Orders Network Projects Technicians Maintenance Orders

Significant upgrade of SAP ISU system Technical upgrade Ensure stable and reliable market solution into the future SAP Support/maintenance contracts Facilitation of SMART metering SAP enhancement packs applied after technical upgrade

Upgrade Timeline for SAP ISU Hardware upgrade Blueprint Realisation Cut-over April 09 May / June 08 July / August 08 Sept to March 09

Work deferred due to ISU upgrade Planned MCRs including Schema change Implementation of new Scheduling solution for customer service work Transfer of Customer Charter from AREA system to ISU Decommissioning of AREAS system Interfaces from SAP ISU to new work management system (customer connections)

Work programme for 2009 related to market systems Smart Metering infrastructure Implement industry-specific service packs in ISU ERP 6 to enable smart metering integration Deliver Market Schema changes and CER / Market change requests in accordance with prioritisation process (later Slide) Implement new Scheduling solution for customer service work Transfer Customer Charter from AREA system to ISU Interfaces from SAP ISU to new work management system (Customer Connections) Upgrade Geographic Information System (interfaces to ISU) Deliver new web-enabled customer interfaces

Thank You. Questions?

SMART Metering Infrastructure Example of US smart metering deployment

Advanced Metering IT Infrastructure SMART Metering Infrastructure Meters Concentrator HAN Distribution Line Carrier Head End Data collection – multiple applications WAN. HAN GPRS Communication Router HAN RF MDMS SAP-ISU Market / supplier system HAN GPRS

System Integration SAP R/3 Enterprise Portal PHR ARM FMIS Business Warehouse PMI Dashboard IS-U xRPM TA / TPA Database DWMS Job Tracker