Joe Bellini, Exelon Drew Miller Exelon April 6, 2012

Slides:



Advertisements
Similar presentations
INPO Update CMBG Meeting June 2013
Advertisements

Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
Strengthening the Medical Device Clinical Trial Enterprise
Integrating CMC Review & Inspection Industry Recommendations Joe Anisko April 24, 2003.
FEMA’s Guidelines and Standards Strategy ASFPM Conference May 23, 2012.
ENVIRONMENTAL MANAGEMENT PLAN
Mª ANGELA JIMENEZ 1 UNIT 4. EXTERNAL AUDIT BASIS CONCEPTS.
Conducting the IT Audit
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Design Bases From 1957 to 2003 June 18, 2007 Chuck Casto Region II NRC.
US Army Corps of Engineers BUILDING STRONG ® North Atlantic Coast Comprehensive Study U.S. Army Corps of Engineers Coastal Storm Risk Management Planning.
FIRE PROTECTION TOPICS OF INTEREST Defense Nuclear Facilities Safety Board.
Developing Guidance Notes for Safer School Construction Image:
Patient Protection and Affordable Care Act March 23, 2010.
Forging Partnerships on Emerging Contaminants November 2, 2005 John Vandenberg Associate Director for Health National Center for Environmental Assessment.
Public participation of EIA in R.O.C. Hsiao-Tien Wu, Wei-Chein Sun & Tung-Wang Chang Environmental Protection Administration Executive Yuan R.O.C.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
1 Current Issues in Siting Safety Reviews Michelle Hart, Sr. Reactor Engineer Division of Site and Environmental Reviews NRC Regulatory Information Conference.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
State of Georgia Release Management Training
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Subcommittee on Hydrology, ACWI New Extreme Storm Work Group Status and Plans.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Fukushima Flooding Task Force Jim Riley April 5, 2012.
Standard Design Process Overview
Beach Modelling: Lessons Learnt from Past Scheme Performance Project: SC110004/S Project Summary.
FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.
Response to NRC Information Requests for NTTF Recommendation 9.3 Sue Perkins-Grew Director, Emergency Preparedness NEI.
“PREEV” PROJECT: REGULATORY PRACTICES ON AGEING AND LIFE EXTENSION (LTO) 3RD INTERNATIONAL CONFERENCE ON NPP LIFE MANAGEMENT SALT LAKE CITY (USA),
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
Update on the Latest Developments in Government Auditing Standards
Boulder Junction Town Road Improvement Project
2011 Prioritization Update to Market Subcommittees
TechStambha PMP Certification Training
Internal and Governmental Financial Auditing and Operational Auditing
Implementation Strategy July 2002
Industry Guidance on Part 21 Evaluation and Reporting
Office of Nuclear Materials Safety and Safeguards
Ryan Cox, Mitigation Planning Supervisor, NC Risk Management
Flooding Walkdown Guidance
Mike Robinson, Senior Mitigation Planner, AECOM
Pressurized Water Reactor Owners Group
Industry Buy and Maintain Quiet initiative update
Update on the Developments in Government Auditing Standards
Unified Approach to Stormwater Monitoring (UASM)
GMD Data Request NERC Rules of Procedure Section 1600
Communication and Consultation with Interested Parties by the RB
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
By Jeff Burklo, Director
Regulatory Cooperation Forum (RCF) - Plenary 2018
Overview of NRC Low-Level Radioactive Waste Activities and Initiatives
Updates about Work Track 5 Geographic Names at the Top-Level
Margin Management Configuration Management Benchmarking Group
Assessing Vulnerability & Climate Change Impacts
NERC Reliability Standards Development Plan
TRTR Briefing September 2013
Pressurized Water Reactor Owners Group
PWR Sump Performance (GSI-191) Industry Workshop
RESOLUTION OF GENERIC SAFETY ISSUE 191
Vendor Technical Information
NERC Reliability Standards Development Plan
Status of Exceptional Events Implementation Guidance
Executive Project Kickoff
DRAFT ISO 10007:2017 Revision Overview Quality management – Guidelines for configuration management ISO/TC176 TG 01.
New Special Education Teacher Webinar Series
Technology Bob Dohrer, Technology Working Group Chair
Presentation transcript:

Joe Bellini, Exelon Drew Miller Exelon April 6, 2012 Evaluation Guidance Joe Bellini, Exelon Drew Miller Exelon April 6, 2012

Draft prioritization scheme sent to the NRC Current Status Draft prioritization scheme sent to the NRC March 14 Draft evaluation guidance sent to NRC April 2 NRC meetings to discuss comments Apr 11, Apr 25, May 16 Evaluation guidance is not required by 50.54(f) letter

Purpose Summarize 50.54(f) letter, enclosure entitled ‘Recommendation 2.1: Flooding’ Provide overview of new plant flood hazard evaluation methods in NUREG/CR-7046, including the Hierarchical Hazard Assessment (HHA) Approach Review flooding mechanisms Establish industry-wide priorities Develop scoping strategies (with examples) Overview & clarify technical requirements Provide technical references for evaluations

Guideline Content Introduction Purpose Definitions Categorization/Prioritization Scheme Scoping Strategy Detailed Evaluation Considerations

Introduction Actions Requested by 50.54(f) Letter Evaluate all relevant flooding mechanisms using present-day regulations, methodologies, engineering practices, and modeling software. Where the reevaluated flood exceeds the design basis, submit an interim action plan that documents actions planned or taken to address safety issues (if any) at the new hazard levels. Perform an integrated assessment to identify vulnerabilities and corrective actions under full power operations and other plant configurations.

Introduction Information Requested by 50.54(f) Letter Hazard Reevaluation Report – Documents the results of the new evaluations for all relevant flooding mechanisms. Integrated Assessment Report – Documents corrective actions (completed and/or planned) for plants where the current design basis floods do not bound the reevaluated hazard for relevant mechanisms and the entire duration of the flood.

Introduction Overview of RG 1.59 and NUREG/CR-7046 Compare Deterministic versus Probabilistic Methods Hierarchical Hazard Assessment (HHA) Approach Start with conservative simplifying assumptions for relevant hazards If any safety-related SSC is adversely affected, use site-specific data to provide more refined analysis

Purpose Give utility staff general information on the various flooding mechanisms, establish industry-wide priorities, develop scoping strategies, and provide technical references & considerations. Supplement NUREG/CR-7046. Not intended to be a comprehensive technical reference for completing the evaluations.

Prioritization Scheme Flood hazard evaluations are estimated to require an average of 2600 utility manhours and 6100 vendor manhours. Evaluations require specialized expertise. Limited resources will not allow all sites to perform evaluations at the same time. Prioritization will facilitate organization and submittal in an appropriate manner.

Prioritization Scheme NRC scheme according to draft letters Industry has engaged the NRC on an approach “Priority” based on proximity of sites to one or multiple flooding mechanisms and complexity of analysis Seek NRC agreement on concept (conducted webinar with NRC to discuss scheme on March 29) NEI to solicit utilities for input parameters to obtain ratings Target: 60 days after 50.54(f) letters (May 8) for NRC to finalize priorities

Prioritization Scheme License Vintage (select one) Rating Co-Located Sites (select one) 1969 - 1975 13 Yes 3 1976 - 1984 8 No 6 1985 - 1996 Recent Evaluations, after 1995 (select one) Location/Hazard (select all that apply) Comprehensive/Detailed 2 River 5 Mixed Detailed/Approx. Lake Nothing Recent 10 Coastal 7 Upstream Dams Size of Watershed (select one) Onsite Reservoir > 20,000 sq. miles Local Intense Precipitation < 20,000 sq. miles Location/Hazard Summation 2 to 28 Not applicable Licensing Basis (select one) Wet 14 Dry 4 Category 1 – Most complex evaluations (59 to 81) Category 2 – Average evaluation complexity (37 to 58) Category 3 – Simplest evaluation (14 to 36)

Prioritization Scheme Criteria: License vintage Relevant flooding mechanisms Licensing basis (wet or dry) Co-located sites Recent evaluations Size of watershed (> or < 20,000 sq. mi.)

Scoping Strategy Compile available information that could be leveraged for the evaluation Identify major physical and operational changes to assess the need for new or supplemental surveys Identify relevant (screen) flooding mechanisms Assess extent of evaluation for each flooding mechanism (can include HHA approach) Develop site-specific scope for flooding evaluation

Technical Considerations Guidance based on NUREG/CR-7046 and 6966 Deterministic Evaluate each applicable hazard Local intense precipitation River flooding Upstream dam failure Storm surge Seiche Tsunami Ice-induced flooding Wind-generated waves Channel migration or diversion Combinations of flooding mechanisms Technical references

NRC / Industry Agreements Prioritization scheme Acceptable approach and references Other issues Gap analysis for co-located existing / new plant sites Hazard screening criteria Others as identified

Technical and Consistency Issues Insights from evaluations Inquiries on evaluation process NEI will maintain a web board with new information

Estimated Schedule for Guidance Submit final prioritization scheme to NRC Late April NRC issue of prioritization scheme May 8 Submit final draft of evaluation guidance to NRC and industry Late May Utility schedule for evaluation if > 3y (90 day response) June 10