PLANS, SPECIFICATIONS AND ESTIMATES

Slides:



Advertisements
Similar presentations
Construction Contracting
Advertisements

Background Presenters Work done in preparation for WHS changes
Managing a Successful Mechanical System project Following design – what next?
Agency Identifies Need Submits Requests OPM Reviews & Approves DPW Current Leasing Process Step 1 FASCAP (5 yr..) Approval EM Request Approval DPW Process.
What do Civil Engineers do? Design Civil Infrastructure Roadworks Earthworks Stormwater Management.(Including Detention & Quality Measures) Sewer Water.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
The Australian Owner Builders Planning Kit. What is the Australian Owner Builders Planning Kit?  The planning kit is an essential tool for people looking.
What are the Main ARCHITECTURAL PLANS/ DOCUMENTS
Bridge Engineering Section Bridge Rehabilitation.
Work Plan Development Aschalew Aberra Highway Utility Engineer, INDOT November 20, 2013.
Civil Works Progress ADB Loan No CAM(SF) / AusAID Grant No.0096-CAM 23 April 2012 GMS-SCCP Improvement of NR33 (15.83 Km Kg Trach to Preak Chak)
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
CON 494 Final Design + Build Arizona State University.
Specification & Quantities Estimating
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Site Plan Requirements © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture.
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials.
OREGON DEPARTMENT OF TRANSPORTATION Practical Design Decision Matrix.
Chapter 43 Construction Supervision Procedures. 2 Links for Chapter 43 Contracts Completion Notices Bids Inspections Loans Appraisals Change Orders Building.
Chapter 2 Introduction to Construction Procedures
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Procurement Authority Representative Roles and Responsibilities Amanda Price, Program Development Coordinator, Planning and Programming, Transportation.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Milestone Meeting Milestone Meeting Client Activity / Task Client Activity / Task Design For Health Activity / Task Design For Health Activity / Task Document.
Unit 1002 Information, quantities and communicating with others © Pearson Education 2010 Printing and photocopying permitted Learning Outcome 1 Know how.
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Planning Team Facility Owner Local CTA/Facility Users Parks and Recreation Facility Manager/Tennis Professionals Facility Maintenance Design Professionals.
City Government ( Obtaining Permits) UNT in partnership with TEA. Copyright ©. All rights reserved. 1.
PLANNING CONSTRUCTION. Initiating Construction private sector – residential, industrial, commercial public sector – public works.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design II.
 To provide a realistic accurate idea of the cost  Provide information about building or not.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Design process.
Huntington Convention Center of Cleveland &
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Site Grading Site Grading Civil Engineering and Architecture
City Government (Obtaining Permits).
Design of a Commercial Shopping Center
Existing Facilities Construction Safety & Performance Evaluations
Commercial Office Building
Design of a Commercial Shopping Center
CONTRACT DOCUMENTS & CONSTRUCTION
Chapter 5 :The Business Plan (Creating and Starting The) Venture
Global Connections Day Building Safety Service Provider
Canyons Golf Hole 12 Comfort Station Special Exception
Project Development and Managing your Build Agenda
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Appendix Contents
City of New Bedford HOUSING REHABILITATION DEPARTMENT OF PLANNING,
Administrator of Construction Todd Wilson Senior Project Manager
MODULE 2 – Project Introduction
THE ROLE OF THE PLANSET IN CONTRACT DOCUMENTS
General comments: These projects are locally owned and the LPA should be involved and informed throughout the project. The project agreement is between.
Use of the Professional Engineer’s Seal A PEO Practice Guideline
Task Description Immediate Predecessor A Develop a list of sources for financing ---- B Analyze the financial records of the business C Develop a.
16498 Brown Rd, Dallas OR
Design process.
Emergency Relief Process
Bellemont Fire Station Addition
Task Description Immediate Predecessor A Develop a list of sources for financing ---- B Analyze the financial records of the business C Develop a.
CRISP Process Stephen Wyrick.
Keystone Library Deliverables
Multi-Family Fourplex Apartment
Chapter 2 – Review ‘construction management’
Growing in Faith, Building Together
How to add seal nr & Customs info?
Presentation transcript:

PLANS, SPECIFICATIONS AND ESTIMATES CIEG 461 NOVEMBER 24, 2003 ED KUIPERS, PE,PLS

CONTENTS WHAT ARE PS&E WHAT DO THEY ACCOMPLISH WHY ARE THEY NEEDED WHAT DETAILS ARE INCLUDED HOW ARE THEY PREPARED & USED WHAT ARE PREVIOUS MISTAKES

WHAT ARE PS&E DELIVERABLES CONTRACT DOCUMENTS CONSTRUCTION DOCUMENTS COMBINED DATA ACCURATE AS REQUIRED OWNED BY DESIGN ENGINEER NOT FOR REUSE

WHAT DO THEY ACCOMPLISH DEFINES SITE LOCATION DEFINES LOCATION ON SITE DEFINES EXISTING DETAILS DEFINES WORK TO BE DONE DEFINES MATERIALS, METHODS, MEASUREMENTS AND PAYMENT (EST. COST) DEFINES FINISHED PRODUCT

WHY ARE THEY NEEDED TO OBTAIN REQUIRED PERMITS TO MEET LOCAL REGULATIONS TO SAFEGUARD LIFE, HEALTH, AND PROPERTY AND TO PROMOTE THE PUBLIC WELFARE

WHAT DETAILS ARE INCLUDED PLANS - SURVEY, PRELIMINARY, SEMI-FINAL, FINAL SPECIFICATIONS ESTIMATES (OPINION OF PROBABLE CONSTRUCTION COST) CONTRACT DOCUMENTS AZ PS&E - CIVIL,STR,ENVIR,TRANS

HOW ARE THEY PREPARED & USED SURVEY DEVELOP BASE DATA ADD PROPOSED DESIGN COMPLETE PS&E, SIGN & SEAL OBTAIN PERMITS BID, CONSTRUCT, REVIEW (NOT INSPECT) AS-BUILT, RECORD

WHAT ARE PREVIOUS MISTAKES NOT TO SCALE NO SETBACKS BLDG. SPACING FIRE CLEARANCE VEH. MOVEMENT ELEVATIONS NOT CONSIDERED,FF,$ FILL,SWM, PL EX. SITE DATA MISSING PROP. DESIGN DATA MISSING