Office Visit- February 16-18, 2000 Report Issued- February ___, 2000

Slides:



Advertisements
Similar presentations
The holistic commodity management approach
Advertisements

1 Energy Company Valuations “It’s all in there!” Georgia State Economic Forecasting Conference May 25, 2005 Richard T. O’Brien Executive Vice President.
Commodity Futures Meaning. Objectives of Commodity Markets.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Commodity Exchange Act Exemption Status Mark Ruane ERCOT Vice President of Credit and Enterprise Risk Management CWG January 26 th 2012 ERCOT Public.
State Diamond Trader Strategic Plan 2012/13. Introduction The State Diamond Trader (SDT): Has been in operation for 5 years Has 92 registered clients.
Power Trading Financial Markets Electricity. Triple Point Technology2 Current Situation… GenerationTransmissionDistributionConsumers.
Project Doorstep - London Preliminary Findings 17th April, 2000.
Confidential & Proprietary Mark-to-Market Accounting Enron Global Markets November 2000.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
Canada Trading Report September 18, 2001 Confidential Enron Americas Enron Assurance Services.
Energy Operations Name, Title. 2 Overview of Services Daily trading P&L reporting Position reporting and limit monitoring Deal validation and confirmation.
Treasury Market Risk Management. Treasury Management Treasury management is a broader concept than liquidity management Management of cash flows in terms.
Business Intelligence Energy, Resources and Utilities.
DRAFT PROJECT DOORSTEP Calgary Office Visit - May 9-12, 2000 Reported- May 24, 2000 Confidential.
DRAFT February 21-23, 2000 PROJECT DOOR STEP Oslo Office Visit- February 21-23, 2000 Report Issued- February ___, 2000 Confidential.
Confidential - for internal use only Enron-Online Project Enron South America - Brazil April 2000.
Continental Power Todd Hall September Introduction n The purpose of this document is to address the topics below: Y P&L Allocation from Book Split.
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
Enron Energy Services - USA
Introduction to Management Accounting
Office Visit- February 28-29, 2000 Report Issued- March ___, 2000
Report Issued- March ___, 2000
Fuel Cost Components in the Fuel Adder
Assessing the Internal
California Product Offerings
Fuel Cost Components in the Fuel Adder
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
ENA Metals Group Metals B2B JV Business Model
Office Visit- February 14-15, 2000 Report Issued- February ___, 2000
Pulp, Paper and Lumber Trading
Privileged and Confidential
Fuel Cost Components in the Fuel Adder
Enron Corp. Board of Directors Presentation
Energy Enterprise Trading and Risk Management Industry Study
Enron Assurance Services
MALDIVES Project Support meeting for the Regional Programme on Economic Statistics Bangkok, November 2016.
NYMEX Diesel & Gasoline Metropolitan Nashville Board of Education
Enron North America Corp. Back-office Systems
PROJECT DOOR STEP LONDON
Trading, Risk Management and Back-office Overview
Agenda Purpose of meeting
Controls Over Inventory
Privileged and Confidential
Chapter 2 Mechanics of Futures Markets
PROJECT Door Step Confidential.
TREASURY ORGANIZATION AND STRUCTURE
Portland West Power & Origination
Trading, Risk Management and Back-office Overview
Enron Assurance Services
1999 Mastio Natural Gas Pipeline Survey
NEWCO FINANCIAL OPERATIONS
Presentation to the Enron Corp. Finance Committee
South Carolina Electric & Gas Company - Strategic SWOT Analysis Review
LNG: Reliable Gas Supply for the Northeast U.S.
- GDP 2011 versus 2010 – increase by 5.5%
Pre-Close Rules of Engagement
TREASURY ORGANIZATION AND STRUCTURE
Enron Energy Services Energy Management Outsourcing Overview
October 9, 2014 Kenneth W. Yagelski Managing Director Gas Supply
Malama Chileshe Energy Economist COMESA Secretariat
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
Keystone Today 173 homes in 27 U.S. States and Canada
Alternative ICAP Proposal
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
UNDERSTANDING THE ENTITY AND ITS ENVIRONMENT AND ASSESSING THE RISKS OF MATERIAL MISSTATEMENT Topic 5.
Objectives, Strategies and Related Business Risks
SPOT CHECKS 2016.
Presentation transcript:

Office Visit- February 16-18, 2000 Report Issued- February ___, 2000 PROJECT DOOR STEP Buenos Aires Office Visit- February 16-18, 2000 Report Issued- February ___, 2000 Confidential February 16-18, 2000

Project Doorstep-Buenos Aires Review Highlights Project Objective: We performed an on-site review of processes, procedures and controls that support the trading and origination business activities within the Buenos Aires office. Our procedures included interviews with key commercial and accounting personnel. We also performed a test of commodity transactions from deal execution through settlement. Team Members: Office Personnel Interviewed: Sally Beck Mike Guerriero - Vice President Ted Murphy Julian Poole - Manager (Power) Tom Bauer - AA Rodolfo Freyre - Manager (Gas) John Sorrells - AA Luis Juarrez - Controller Kate Agnew - AA Veronica Leppez - Commercial support John Vickers - AA Carolina Warington - Commercial support Sue Frusco- Houston Christine Garcia- Houston February 16-18, 2000

Project Doorstep-Buenos Aires Current Portfolio Natural Gas 9 active deals, all physical Terms generally for 1 year or more; final expiration currently in November 2012 Published “index” and “transport pricing” which each change twice annually Transport contracts include 1 firm and 3 interruptible * DEAL TEST- Tested 5 commodity deals and 2 transport contracts 2-18-00 NOP (5.4 BCF) YTD P/L ($.8)MM Power 21 active deals; 19 physical, 2 financial Minimum term 1 year, the longest term deal is two years Transport tarriff incurred for each deal as used * DEAL TEST- Tested 9 commodity deals 2-18-00 NOP (0.7MM Mwh) YTD P/L ($.1) MM February 16-18, 2000

Project Doorstep - Buenos Aires Observations EFFECTIVE CONTROLS Knowledgeable back-office (logistics and physical settlements) personnel New/Revised Deal Report prepared weekly and distributed to Head Trader Financial transactions executed directly with Enron North Amercia Natural gas transactions captured on existing trading systems Financial settlements approved by Houston operations and BA traders Cash needs assessment (for Buenos Aires) approved monthly by the Southern Cone CFO. Taped trader phone lines Deal documentation complete and easily accessible February 16-18, 2000

Project Doorstep - Buenos Aires Observations February 16-18, 2000

Project Doorstep - Buenos Aires Observations AREAS FOR FURTHER REVIEW Office profitability and liquidity analysis (including major components) Cash forecasting and reporting Cash disbursements controls Existence of side agreements EnPower post implementation Supporting Houston operations February 16-18, 2000

Market Structure - Natural Gas Project Doorstep - Buenos Aires Office Analysis Framework Market Structure - Power Primarily physical market environment, financial transactions recently executed. Open access distribution market for customers larger than 50kw hours, regulated tariff structure in place. Generation is fully deregulated and power is available for sale on spot or contractual basis up to the facilities capacity. Independent Service Operator controls transmission system. Peak demand analyzed as approximately 12,750 mw, 19,490 mw available. Power generation approximately 50% thermal, 45% hydro, 5% nuclear in WEM. Contracts executed for one year minimum, must be reported and accepted by regulatory agency. Market Structure - Natural Gas System privatized at all levels (production, transportation, and distribution) Currently a physical market, no financial transactions. Open access to all customers larger than 3mm cm/year. Two major firm supply transactions with expiration in 2004, one transport deal with expiration in 2009. Market dominated by single major player, YPF, produces 40% and markets 55% of gas total supply. Limited volatility in natural gas and transportation pricing. Transport is approximately 40% of total price. Opportunities available to exploit market for transportation. Strategy Continuing focus on expansion of natural gas and power portfolios and development of “commodities” market. Limited success on industrials; however, 6mm commercial/retail customers in GBA. Expansion into power financial transactions. Pursue opportunities to capitalize on firm vs. interruptible transport. Explore possibilities of acquiring generation assets and associated market opportunities. February 16-18, 2000

Project Doorstep - Buenos Aires Office Analysis Framework Management Management and operational staff control oriented. Commercial and operations groups primarily locals, few key positions held by seasoned Enron personnel. Several energy operations support functions performed in Houston, rapid portfolio expansion may necessitate local operations. Movement to have overall employee portfolio supported by locals. Management supportive of rotating key employees through similar functions in Houston to further develop employees knowledge and experience. Information Positions for power and natural gas distributed to trading management and traders weekly New deal reports prepared and reviewed by traders weekly. Southern Cone Trading Risk Profile (positions and YTD p&l) delivered to senior management weekly. Monthly cash position and estimated profit and loss statement reports delivered for review by Southern Cone senior management. Systems Natural gas transactions utilize established Houston trading systems (i.e., ERMS, CPR) Power activity captured on Excel spreadsheets. Financial Reporting information captured in newly installed SAP. Power valuation model developed in Excel February 16-18, 2000

Project Doorstep - Buenos Aires Office Analysis Framework Business Processes Back-office coordination between Houston and BA: Deal Documentation, Capture and Risk Management in Houston. Logistics, Settlements, and Financial Reporting in BA. Position reports prepared for distribution in Risk Management weekly. Deal information prepared by traders and delivered to Houston for risk identification and capture in trading portfolios. Credit approval coordinated with GCG in Houston. Financial settlements approved by Houston operations and BA traders prior to mailing. Competitors Natural Gas - two LDC owed marketers and recently licensed Duke Energy. Power - Recent licensed Duke and one other registered marketer. Counterparties Natural Gas - YPF, Quintana, Totalassa, Cerro Vanguardia, Bagleysa, Gases de Ensenada. Power - Perez Companc, Centeral Termica Alto Valle S.A., Firestone, Electrometalurgica Andina, Praxair. February 16-18, 2000

Project Doorstep-Buenos Aires Review Highlights DEAL PORTFOLIO Gas: 9 current deals, all physical Terms are generally for 1 year or more, the longest dated deal runs through November 2012 Pricing is based on published index and transport which each change twice per year. Transport contracts include 1 firm and 3 interruptible As of February 18, 2000: Net Open Postion- (5.4 BCF) YTD P/L- ($. 8) MM The review was performed on 5 of the 9 current deals. 1 firm transport and 1 interruptible agreements were reviewed. Power: 21 current power deals; 19 physical, 2 financial Terms must be at least 1 year, the longest term deal is two years Transport is not included in any of the deals Net Open Position- (0.7 MM Mwh) YTD P/L- ($ .1) MM The review was performed on 9 of the 21 deals. February 16-18, 2000

Project Doorstep - Buenos Aires Observations CONTROL IMPROVEMENTS Install EnPower for power transactions by June 30, 2000. -Power transactions are currently captured in an Excel model Report P/L and positions daily for inclusion in Enron Corp. DPR - P/L and position reports are prepared and forwarded to Houston weekly Translate all contracts into English by a certified translator -5 of 15 reviewed contracts did not have English translations; none of the translations were certified Strengthen analytical reviews of contracts to identify all risk components. -Identify and capture each risk component (i.e. transport, annuities, contractual min.max) Ensure only completed contracts are captured and valued -One contract extension that had not yet been executed by the counterparty or approved by the ISO was included in MTM valuation Restrict access to power information maintained on the office server by March 30, 2000 Clarify and appropriately segregate reporting lines of back office personnel Maintain documentation of credit approval in customer files in B.A. February 16-18, 2000