Outcome LBDS Dry Run – week 7

Slides:



Advertisements
Similar presentations
1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
Advertisements

Etienne CARLIER AB/BT/EC
1 MKBH Erratic Jan Uythoven On behalf of the ABT team (Viliam, Nicolas M., Etienne, Laurent, Francesco etc…..) MPP meeting 8/5/2015.
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
Distributed BI Systems BLM, BPM, BTV and BRAN Laurette Ponce & Fabio Follin Thanks to: Anthony Rey, Enrico Bravin, Rhodri Jones, Bernd Dehning, Mariusz.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
Controls Issues Injection beam2 test meeting 28 th Aug 2008 Eugenia Hatziangeli Input from J. Lewis, M. Sobzak, JJ Gras, C. Roderick, M.Pace, N. Stapley,
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
LSA Developments & Scope 02 / 11 / 2006 G.Kruk for the LSA Team.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
RBAC Content: LHC Operational Mode Piquet Roles RBAC Strict LHC Operational mode and CMW Acknowledgements: Pierre C., Wojtek S., Stephen P., Lars J., Verena.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
LHC Machine Checkout & Dry Runs Strategy Acknowledgements: R.Alemany, R.Giachino M. Albert LHC Beam Operation Workshop June 2014.
Dry runs and cold checkout Markus Albert, Reyes Alemany, Rossano Giachino, Delphine Jacquet, Verena Kain, Belen Salvachua Ferrando, Matteo Solfaroli Camillocci.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
V. Kain – eLTC – 7March08 1 V.Kain, S. Gysin, G. Kruk, M. Lamont, J. Netzel, A. Rey, W. Sliwinski, M. Sobczak, J. Wenninger LSA & Safety - RBAC, MCS Roled.
IPOC Software for LBDS Data Acquisition & Analysis LBDS Technical Audit CERN - AB/BT/EC - N.Magnin.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
CO Timing Review: The OP Requirements R. Steerenberg on behalf of AB/OP Prepared with the help of: M. Albert, R. Alemany-Fernandez, T. Eriksson, G. Metral,
The Dashboard The Working Conditions The Common Chapters State What’s Next.
FCC related MDs. Faster LHC ramp MD Brennan Goddard; Matteo Solfaroli Camillocci; Wolfgang Bartmann; Florian Burkart; Francesco Maria Velotti; Mike Lamont;
New PSB beam control BIS Interlocks A. Blas PSB Beam Control 20/01/ BIS: Beam Interlock.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
R. Alemany & V. Kain, 21 st of April ‘09 LHC Dry Run- Week 14 oGoal: run injection and TL BI (fixed displays, logging, applications) plus injection BI,
RF acceleration and transverse damper systems
LHC Beam Commissioning Meeting V. Kain & R. Alemany
Data providers Volume & Type of Analysis Kickers
The TV Beam Observation system - BTV
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Dependability Requirements of the LBDS and their Design Implications
Beam dump XPOC analysis
(short status report on everything)
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Hand-shake Signals Between LHC Machine and Experiments
SLS Timing Master Timo Korhonen, PSI.
Injectors BLM system: PS Ring installation at EYETS
Purpose of this presentation
LHC Beam Dumping System Reliability Run Summary
Saturday 24 March 2012.
Software and control issues
Jan Uythoven For discussion
J. Uythoven for the MPE-MI & MS Teams
Commissioning and Testing the LHC Beam Interlock System
A/N 26 16:00 Access finished problem with the BLM test. one crate is failing the beam permit test. Fixed. Access required in sector 78 for QPS to fix a.
Monday 11/07: Recovery Plenty of accesses.
Distributed BI Systems
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
BLM settings management in LSA
Beam Dumping System and Abort Gap
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
J. Emery, B. Dehning, E. Effinger, G. Ferioli, C
Agenda 9:00-10:00 Beam Interlock System Changes Following the 2006 Audit Benjamin Todd 10:00-11:00 Beam Dump System follow-up from the 2008 Audit Jan Uythoven.
Conditions Cool-down of remaining sectors
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
LHC dry-runs (BE-BI view)
Machine Protection System Commissioning plans
90m "proper" VdM scans in the 90m/10m optics
LHC BLM Software audit June 2008.
Jan Uythoven For the LBDS Team
New page for summary of test status
Configuration of BLETC Module System Parameters Validation
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
LHC Systems Providing Post-Mortem Data
Review of hardware commissioning
SPS Injection BIS - Draft requirements
Presentation transcript:

Outcome LBDS Dry Run – week 7 Ioan Kozsar; Julian Lewis; Benjamin Todd; Bruno Puccio; Lars Jensen; Ana Guerrero Ollacarizqueta; Stephane Bart Pedersen; Michael Ludwig; Bernd Dehning; Christos Zamantzas; Jean-Jacques Gras; Jan Uythoven; Etienne Carlier; Nicolas Magnin; Nicolas Voumard; Christophe Chanavat; Marine Gourber-Pace; Ronny Billen; Chris Roderick; Reyes Alemany Fernandez; Vito Baggiolini; Fabio Follin; Markus Albert; Guy Crockford; Marek Misiowiec; Grzegorz Kruk; Jerome Axensalva; Eric Gallet; Brennan Goddard; Mike Lamont; Verena Kain

LBDS Dry Run week 7 http://wikis/display/LHCOP/LBDS+Dry+Runs Scope week 7 – preparation for scenario “programmed dump beam 1”: Trigger Beam Dump system from the control room via timing event directly Test point 6 BI in XPOC acquisition mode Test sequencer driving the LBDS: programmed dump Sort out first version of XPOC analysis and communication to the sequencer Outcome week 7: http://wikis/display/LHCOP/Checklist+and+Outcome+week+7

Timing Table – week 7 Start table event, payload 17 (Hex 11) Normally Triggered beam dump In week 11 it will be the broken permit loop Start table event, payload 17 (Hex 11)

BI (1) Worked fine in XPOC acquisition mode. Did not look into data integrity. Video signals from screens need some attention – will be done for next dry run. Fixed displays need to be cleaned up a bit – have too many now. BTVs BLMs (will only concentrate on the BLMs associated with extration equipment) BPMSE, BPMD BCTFD

BI (2)

LBDS equipment and software (1) Kickers and protection worked fine. OR: AS THEY WERE SPECIFIED. Acrobatics to “arm” the system: In order to arm LBDS: Need to arm BETS Need to be below injection engery Need to arm IPOC Need to arm the kickers Need to arm overall LBDS (TSU together with BIS, removes injection permit) Could get ourselves into situations (BEM interlock), where we could not arm anymore BEM interlock: energy freezes – need to be below 450 GeV to arm Without “stop”, “start”, “reset”, “rearm” could not have got back Sorted out for next dry run LBDS Control and Monitoring GUI (M. Albert) Week 7

LBDS equipment and software (2) Artificial energy reference – BETS simulator: To not generate interlock, need slow ramps up and down

Sequence Overall result: we could drive the whole system through the sequencer without any problem!!! A couple of improvements required: Cannot set time without SQL script on LSA DB If-else statements are required to describe complicated state machines of LBDS system: They must be automatically executed and “old” sequence automatically resumed Looping RBAC for certain sub-sequences/tasks: e.g. if “reset” of BETS required Improvements will be there for the next dry run Except RBAC

XPOC Had the first version of the overall system. Looks already promising… Was triggered with timing event “beam 1 dumped” to start data collection and analysis as in final version Data collection needs to be improved (exception handling,…) Now everything written to SDDS Might partly go to logging DB Improvements required for next dry run: Analysis not yet integrated with XPOC server Results and state not yet published via JMS for logging and SIS; written to DB only for the time being GUI is required More XPOC specific comments see WIKI: http://wikis/display/LHCOP/XPOC+status

Next Dry Run Scope week 11: Still to sort out: Beam dump system beam 1: programmed dumps Local permit loop RF simulated revolution frequency Programmed dumps via timing system to break permit loop LBDS triggered by broken permit loop Still to sort out: Arming, XPOC, BETS Simulator, Sequencer follow-up Permit loop – fibers, copper cables to LBDS BIC/BIS FESA classes to arm, link/unlink permit loops BIS supervision Timing CIBU, test of detection of broken permit loop Remove input of direct BLMs to TSU LASS to be strapped TSU tested N2 pressure and line vacuum display Lower priority Sequence modified to take all that into account

OVERALL SUCCESSFUL FIRST DRY RUN… Conclusions OVERALL SUCCESSFUL FIRST DRY RUN…