Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.

Slides:



Advertisements
Similar presentations
DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
Advertisements

Mead Valley Municipal Advisory Council October 17, 2012
Titusville to Edgewater Bike Loop PD&E Study
West Contra Costa Unified School District
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Public Scoping Meetings September 26, 2011 and September 29, 2011 Cajalco Road Widening and Safety Enhancement Project.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
New I-65 Interchange at Worthsville Road Welcome!.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Environmental Assessment Public Meeting
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
I-15/LOS ALAMOS ROAD OVERCROSSING City Council Meeting January 17, 2012.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
Broward Complete Streets Technical Advisory Committee (TAC) Meeting Monday August 10, 2015.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
Project Location Map Contents of Presentation Welcome Project Location Map Contents of Presentation Agency Involvement & Responsibilities Project Purpose.
Fred Luna, SBCAG Paul Martinez, Caltrans District 5 April 3, 2013 SBCAG North County Subregional Committee State Route 246 Passing Lanes.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Metro Highway Program Presentation to CMAA Abdollah Ansari
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Fairview Avenue North Bridge Replacement Project Seattle Bicycle Advisory Board MariLyn J. Yim, P.E. October 7, 2015.
MED SR 18 Corridor Project MED PID October 13, 2015.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Integrating Transit and Highway Solutions In High Volume Corridors
Southwest Parkway and Chisholm Trail Briefings
Four Winds Condominium Association August 2, 2017
I-77 High-Occupancy Toll Lanes
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
TVTC Impact Fee Update Nexus Study January 30, 2008
I-280 Corridor Study and I-280/Winchester Blvd Project
NGTA Halton Planning and Public Works Committee
Project Overview Multimodal improvements to 22.5 miles of I-66
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
The Oakton Condominium Association September 12, 2017
Public Workshop #1 August 18, 2010.
Highway 14 – Owatonna to Dodge Center District 6 Update
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Department.
Board Transportation Committee October 13, 2015
Regional Projects Report 5-Year Integrated Plan Projects Status
I-25 South Gap Project I-25 Gap Coalition Meeting
SR422 Section 29M, Berks Co. West Shore Bypass Reconstruction
The Construction team appreciates this opportunity to discuss the work that will begin in October on State Road 397 over Toms Bayou. My name is Mike Sasser,
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Meadow Lake Boulevard Street Extension Project
S.R. 26 Road Rehabilitation in Clinton County
S.R. 261 Intersection Improvement at Fruitwood Lane in Newburgh
Metropolitan District | mndot.gov
I Street Bridge Replacement Project
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS

Welcome & Introductions Welcome - Susan Miller, CCTA Hamid Fathollahi, Caltrans District 4 Project Team Introductions Notes: Purpose of today’s presentation: Provide an overview the I-680 Southbound HOV Gap Closure Project Describe the current phase, now underway, for the environmental documentation process (CEQA/NEPA) Describe opportunities for public input Provide general overview of Caltrans’ role as a project partner during the environmental phase of the project. PARSONS

Project Overview Purpose: to close 5.4-mile HOV lane gap on SB I-680 Create continuous Southbound HOV Lane between Martinez/Benicia Bridge & Contra Costa/Alameda County Line Gap Closure for Northbound Lanes is subject of a different study Project Sponsor: CCTA/TRANSPAC Caltrans is a partner during the environmental documentation phase of the project and is providing an oversight role Notes: From SR-242 Interchange to the SR-24 Interchange I-680 widens to six or seven lanes per direction, with complex weaves and high volumes of entering and exiting traffic… South of SR-24, I-680 has five general purpose lanes in each direction, tapering down to four near Livorna Road. This portion of I-680 carries heavy volumes of commuter traffic during peak hours. Daily traffic volumes vary from a low of 150,000 ADT near the Benicia Martinez Bridge to a high of 266,000 ADT between SR-242 and SR-24. Tailor the discussion to the problem or deficiencies that would be addressed with the project PARSONS

Project Location - Note that the Rehabilitation of I-680 from Rudgear Road to Alcosta Blvd at the County line will commence - Note the project development process from Planning to NEPA Approval, to Final Design and Construction Phases. We are currently in the NOIS phase, and will begin Scoping process this fall. PARSONS PARSONS

Alternatives Preliminary Study Alternatives Build Alternative #1 –Reduced Standard Alternative Add HOV lane by widening existing freeway from North of Livorna Road to South Main Street Add HOV lane by restriping existing roadway from South Main Street to North Main Street and narrowing width of inside lane and shoulder. Estimated Cost $80 Million Build Alternative #2 - Full Standard Alternative Add HOV Lane by widening existing freeway throughout the project limits Requires replacement of existing structures, including BART overcrossing Estimated Cost $350 Million Note that Alternative 2 is not financially feasible and its impacts are too great. The Initial Studies will be geared towards dismissing this alternative For Alternative #1 – No ROW required - For Alternative #2 - ROW acquisition from 18 parcels is required A No Build Alternative will also be considered in the environmental document PARSONS

Environmental Studies The following studies are anticipated during the environmental review process: General Environmental Technical Studies Biological Resources Studies Cultural Resources Studies PARSONS

Project Funding Sources PARSONS

Project Timeline (through construction) Preliminary Studies/ Planning Environmental Review Design Right of Way Construction COMPLETED Fall 2011 Winter 2013 CEQA/NEPA Approval Winter 2013 Winter 2015 Winter 2014 Winter 2015 Spring 2016 Spring 2018 PARSONS

Public & Agency Input Outreach to Cities and Planning Agencies JULY 2011 SWAT (Southwest Area Transportation Committee) AUGUST 2011 Alamo MAC (Municipal Advisory Council) SEPTEMBER 2011 Walnut Creek Transportation Commission Walnut Creek Businesses? County Connection – CCCTA OCTOBER 2011 TRANSPAC (Transportation Partnership & Cooperation) Update Project Status to Jurisdictions (Spring 2012) Open House for Environmental Phase (Fall 2012) Get input re outreach to Walnut Creek businesses. (Will transportation commission be the conduit, or should we do a presentation); What issues/concerns are they likely to have? PARSONS

Thank You! For updates, visit CCTA website: http://ccta.net/assets/documents/Fact~Sheets~-~Measure~J/8001.pdf PARSONS