Status of the work of RTCA SC-202

Slides:



Advertisements
Similar presentations
Regulatory considerations for wireless aircraft systems
Advertisements

03/16/ Status of the work of RTCA SC-202 Co-Chairs:
03/16/ Status of the work of RTCA SC-202 Co-Chairs:
1 Accredited Standards Committee C63 ® - EMC Subcommittee 8 Bob DeLisi / Stephen Berger Chair / Vice-Chair
Industry Priorities for the Next TSO-C127 Revision
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
1 Status of ATSRAC presented to White House Wire System Safety Interagency Working Group Meeting Kent V. Hollinger September 11, 2001.
Electronic Flight Bag (EFB)
TCCA Aircraft Certification
Safety Report Treatment of Safety-Critical Systems in Transport Airplanes Office of Research and Engineering.
AVS Repair, Alteration and Fabrication Team (RAFT) Results
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
Electronic Flight Bag (EFB)
1 11 December 2012E&M Sub-SSCC EASA Rulemaking Update (Continuing Airworthiness) Juan Anton Continuing Airworthiness Manager Rulemaking Directorate EASA.
Doc.: IEEE /214r1 Submission May 2003 Bob Huang, Sony ElectronicsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
WAEA Discussions Jeffrey Schiffer Intel Corporation 11/5/99.
Federal Aviation Administration 0 Certification Standards for New Technologies June 9, 2005 Certification Standards for New Technologies Presentation to:
Federal Aviation Administration Commercial Space Transportation Human Space Flight Occupant Safety Telecon Telecon 8 – Communications and Commanding Best.
Doc.: IEEE /214r0 Submission May 2003 Bob Huang, Sony ElectronicsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
U.S./Europe International Aviation Safety Conference By:T Fazio (FAA)/ C Probst (EASA) Date: 7 June 2006 “Global Aviation Safety Processes: Refining, Reinforcing,
Doc.: IEEE /0014r0 & /0425r0 Submission March 2007 Rich Kennedy, OakTree WirelessSlide 1 RR-TAG Liaison Report Mar07 IEEE
Cargo Strategic Action Plan Prepared by: Cargo Strategic Action Group Air Carrier Maintenance Branch, AFS-330.
Enhanced Airworthiness Program for Airplane Systems (EAPAS) Presented by: Massoud Sadeghi FAA - Aging Systems Program Manager EAPAS Workshop November 2002.
ATSRAC TASK 6 W IRE S YSTEMS H ARMONIZATION W ORKING G ROUP.
1 ATSRAC Overview presented to EAPAS Workshop for FAA Inspectors/Engineers Kent V. Hollinger November 5, 2002.
Presented by: Date: Federal Aviation Administration FAA Weather in the Cockpit Guidance and Policy Roger Sultan AFS-430 July 22, 2014.
Doc.: IEEE /1417r0 Submission November 2012 Rich Kennedy, Research In MotionSlide 1 IEEE Regulatory SC San Antonio Closing Report Date:
COMMITTEE CHARTER SAE S-18 Aircraft & Systems Development and Safety Assessment Committee 29 January 2008.
Aerospace Vehicle Systems Institute On-Aircraft Wireless Communications Research at AVSI Dr. Fred Fisher Asst. Director, AVSI July, 2011.
ICAO TECHNICAL COOPERATION PROJECTS IN INDONESIA
Status of the work of RTCA SC-202
Workshop on preparations for ANConf/12 − ASBU methodology
NEXCOM Next Generation Air/Ground Communications
Update on WAIC Issues ITU-R Working Party 5B and Future Regulatory Considerations Joe Cramer December 16, 2009.
Spectrum issues and challenges, not on the specific agenda for WRC-19
Sri Lanka's Experience with ICAO TCB Projects
VDL Mode 3 Cosite Interference Testing Summary
Workshop on preparations for ANConf/12 − ASBU methodology
Update on Wireless Avionics Intra-Communications (WAIC) ICAO, ACP-WG-W, Montreal Marcella Ost January 22, 2010 ACP WG-W/3 IP-3.
NEXCOM Next Generation Air/Ground Communications Appendix G
Office of Nuclear Materials Safety and Safeguards
Workshop on preparations for ANConf/12 − ASBU methodology
RTCA SC-202 WG6 Summary to IEEE
[RR-TAG Liaison Report to ]
RTCA SC-202 Request for Collaboration
RR-TAG Liaison Report September 2008 IEEE
RR-TAG Liaison Report IEEE
Workshop for Licensing and Operations
RR-TAG Liaison Report IEEE
Progress in Replacing Halons in Civil Aviation
RR-TAG Liaison Report September 2008 IEEE
RR-TAG Liaison Report IEEE
September 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE – Liaison Report] Date.
NERC Reliability Standards Development Plan
Summary of RTCA SC-202 Discussions with Consumer Electronics Industry
<month year> doc.: IEEE < e> January 2012
Balanced Approach to Noise Mitigation
Submission Title: [Regulatory Update]
IEEE Regulatory SC Vancouver DRAFT Meeting Plan and Agenda
NERC Reliability Standards Development Plan
IEEE RR-TAG Teleconference Plan and Agenda
Call for a Collaborative Effort
“Good Samaritan Acts” & Helping Out on Airplanes
IEEE Regulatory SC Vancouver DRAFT Meeting Plan and Agenda
RR-TAG Liaison Report Mar07 IEEE
WiGig technologies IEEE ad/ay
RR-TAG Liaison Report IEEE
Balanced Approach to Noise Mitigation
Wildland Fire Policy Revision
RR-TAG Liaison Report IEEE
Presentation transcript:

Status of the work of RTCA SC-202 Co-Chairs:

Define the Risks of T-PED’s to Aviation Safety T-PED’s & Commercial Airplanes: Assessing the Risk & What To Do About It Define T-PED’s Transmitting - Portable Electronic Devices Define the Risks of T-PED’s to Aviation Safety Explain the purpose of RTCA SC-202 Review the committee findings & recommendations Address the committee’s remaining tasks

Defining The Risk Of T-PED’s Unlike Avionics Systems installed on airplanes, T-PED’s are consumer electronics, purchased from retail outlets and used by consumers without specific training

Defining The Risk of T-PED’s: Radio Sensitivity & Relative Signal Strengths Distance to the moon 384,000 kilometers Human Hair 40 µmeters If the distance to the moon is compared to the transmitting power of a commercial airliner’s VHF radio , then the width of a human hair can break VHF squelch.

Assessing The Risk Of T-PED’s T-PED emissions may reach antennas used by sensitive airplane navigation and communications receivers. Unlike HIRF, the RF source is inside the airplane.

Assessing The Risk of T-PED’s Emissions from T-PED’s may be picked up by airplane wiring or nearby airplane systems devices themselves. Again, unlike HIRF, the RF source is inside the airplane.

Maintaining and Enhancing Aviation Safety: RTCA Special Committee 202 The FAA requested that RTCA, Inc. form a special committee to present an up-to-date evaluation of the use of portable electronic devices (PED’s). Particular attention was to be paid towards intentional transmitters such as mobile phones, wireless RF network devices, and other wireless-enabled devices such as personal digital assistants (T-PED’s). Phase 1 – current T-PED technologies Phase 2 – upcoming, next-generation T-PED technologies plus guidance for airplane design and certification.

RTCA SC-202 Schedule Special Committee SC-202 – Phase 1 Phase 2 2003 April 1963 SC-88 Document Completed September 1988 SC-156 Document Completed August 1996 SC-177 Document Completed Previous PED Committees 1963 1996 January 2003 FAA Request May 2003 First Meeting October 2004 SC-202 Phase 1 Document Completed Special Committee SC-202 – Phase 1 Phase 2 2003 2005

Committee Representation Regulatory Agencies FAA (Flight Standards, Aircraft Certification, Spectrum Management), UK-CAA, Transport Canada, DGAC-France, FCC Airlines United, Delta Air Lines, US Airways, Continental, Northwest, American, Lufthansa, JAL, ANA, FedEx, UPS, Southwest, QANTAS, Air Wisconsin, ANA Airplane Manufacturers Airbus, Cessna, Boeing, Bombardier Avionics Manufacturers Rockwell-Collins, Honeywell, Connexion, Matsushita, General Dynamics, Teledyne, AirCell, Row 44 Consumer Electronics Verizon, Intel, Sony-Erickson, Panasonic, QUALCOMM, XCube Communications, CEA, Sony, Motorola, Dell, CTIA, Freescale Semiconductor Associations, Universities, Agencies NASA, UofOK, ARINC, SITA, ALPA, AFA, IATA, EUROCAE, Carnegie Mellon Aviation Industry Consultants CAVOK International, Alion, Eagle’s Wings, AJ Systems, Overlook Systems

Accomplishments Developed and published guidance on a regulatory approval process for selective use of T-PED technologies. Provided examples of: Characterization of current wireless technologies Applicable aircraft avionics operating standards Flight critical systems categorization Mitigation of potential T-PED effects Guidance for PED policies and procedures development passenger and public education goals Recommended revisions to FAA AC 91.21-1A. Proposed FAR revisions to incorporate PED Usage Signage. Published recommendations on acceptable and enforceable use of T-PED geared towards: Airlines, Airplane Manufacturers, Consumer Electronics Industry, Regulatory Authorities, and Consumers.

Maintaining and Enhancing Aviation Safety: Continuing Efforts Refining recommendations for: T-PED design Aircraft design and certification Operational risk mitigation. Assess and Characterize additional T-PED Technologies Ultrawideband devices Pico-Cell Technology Wireless Medical Devices Active RFID Tag Technology. Assess and recommend FAA regulation revisions to address allowable PEDs (Part 14 CFR 91.21 and 121.306). Increasing coordination with EUROCAE Working Group 58. Validation of the end-to-end process.

Maintaining and Enhancing Aviation Safety: RF Emission Limits Assessment Coordination with: Regulatory Authorities Consumer Electronics Industry Avionics Manufacturers Develop recommendations for RF emission limit changes for consumer portable electronic devices explore the possibilities for regulatory middle ground between Aviation Industry emissions requirements, and existing FCC limits for the Consumer Electronics Industry

Defining recommendations for Airplane Design and Certification: Maintaining and Enhancing Aviation Safety: Airplane Design and Certification Defining recommendations for Airplane Design and Certification: address tolerance to intentional transmissions and spurious emissions Identify PED environments to support: Aircraft certification System certification – STC If required, identify changes to equipment RF susceptibility Will be a separate DO-yyy document Completion after final update to DO-294 Will build upon process and guidelines in DO-294 Work to define common document with EUROCAE Working Group 58 Expected completion July 2007

RTCA SC-202 Schedule July 2007 Design & Certification Document Completed December 2006 Document Publication Recommendation March 2006 Phase 1 Document Update Released 1st Qtr 2007 SC-202 Phase 2 Document Released July 2006 Draft Document Completed October 2004 SC-202 Phase 1 Document Completed Phase 2 Tasks In Work Review Comment DO-YYY work 2004 2007

Concluding Remarks Committee efforts provide level playing field for T-PEDs impact assessment. Making progress towards acceptable and enforceable policies and processes for the allowance of passenger and crew use of T-PEDs. Replacing anecdotal understanding of T-PED operation on aircraft with a common facts-based understanding of the T-PED impacts and situation. Developing recommendations and process for operational allowance plans and for airplane design and certification Further information on RTCA and SC-202 available at http://www.rtca.org/