G.Alexeev for Dubna group ITEP, April 28, 2010 Muon System Status Report from Dubna.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
Electronics for the INO ICAL detector B.Satyanarayana Tata Institute of Fundamental Research For INO collaboration.
2 July 2004Journée DPNC 2004 FAST: A precision measurement of muon lifetime. Chiara Casella FAST collaboration: A.Barczyk (1), J. Berdugo (2), J. Casaus.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Spin Physics from COMPASS G. Mallot/CERN On Behalf of the Compass Collaboration Spin 2003, Seattle 4-7 August, 2003.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
Electronics for Range System Prototype Tests A. Piskun ITEP, Moscow, 28 April, 2010.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Status of the Front-end-Electronics based on NINO ASIC for the Time-of-Flight measurements in the MPD V. A. Babkin, M.G. Buryakov, V. M. Golovatyuk, S.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
FRRC - PANDA Meeting, Moscow / ITEP, May 26, 2015 G.Alexeev (for muon group) Muon System Status Report * Approval of Muon TDR by FAIR Council (22 Sept.
BMBF-JINR PANDA Meeting, Dubna, November 15, 2013 G.Alexeev (for muon group) Status of Project and Related Topics * Report to the Muon Review Panel ( CERN,
G.Alexeev for Dubna group ITEP, April 28, 2010 Muon System Status Report from Dubna Hardware : * Full Scale prototype - in preparation to be put in work.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
1 GSI, Darmstadt Goethe Universität Frankfurt Ph.D Committee meeting 16 th of August 2011 Grzegorz Kalicy Development and Test of a Prototype for the PANDA.
STATUS of BIG PROTOTYPES A. Piskun (for Dubna group) Protvino, 7 June 2011 _________________________________________________ Full Scale Prototype Range.
Mitglied der Helmholtz-Gemeinschaft STT News Peter Wintz (IKP, FZJ) PANDA Collaboration Meeting, Dec-2013, FAIR.
Work on Muon System TDR - in progress Word -> Latex ?
Results with the RPC system of OPERA and perspectives
Activity: TDR: * Range System Prototype is on the way to CERN
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
Electronics for Range System Prototype Tests
Novosibirsk, September, 2017
CLAS12 Forward Tracking: Status and Challenges
FSC status and plans Pavel Semenov IHEP, Protvino
Muon simulation status from Dubna
LKr status R. Fantechi.
Test Beam Request for the Semi-Digital Hadronic Calorimeter
PANDA Muon Group Meeting, Protvino 7 June 2011 G
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
MDT and analog FEE mass production:
Dubna/JINR Status & Plans
Progress report since june 2010
Preparation for CERN test beam
T1 Electronic status Conclusions Electronics Cards:
EMU Slice Test Run Plan a working document.
CMS EMU TRIGGER ELECTRONICS
INO TRIDAS presentations
News on second coordinate readout
10/month is the present production rate 2 FTE + sporadic contributions
ScECAL+AHCAL+TCMT Combined Beam FNAL
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
Pierluigi Paolucci - I.N.F.N. Naples
TMB, RAT, and ALCT Status Report
GEM-based Digital Hadron Calorimetry for SiD
GEM-based Digital Hadron Calorimetry for SiD
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
11th Pisa meeting on advanced detectors
Limited Streamer Tube Project Summary
Project planning and status (May 2018)
Calice Tile-HCal and Tail-catcher/Muon Tracker
LC Calorimeter Testbeam Requirements
Characterization of Wired-OR prototype board
Plans for the 2004 CSC Beam Test
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

G.Alexeev for Dubna group ITEP, April 28, 2010 Muon System Status Report from Dubna Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS, expected start of long strips r/o studies – May-June 2010 * Range System prototype (degree of readiness) : - steel absorber /structure ~ 95% (Fe plates 100% ready -> to be welded) - MDT detectors ~ 50 % (all parts 100% ready, 10% of MDTs assembled) - strip boards, cables ~ few % (to be produced by summer 2010) - f/e electronics ~ few % (design 100% ready, mass production required) ( see report of A.Piskun) Software : * Acceptance studies for DY and J/ muon pairs (see report of V.Rodionov)

Full Scale prototype mechanically assembled and stored in COMPASS area (park position) It is now being equipped with HV,LV, gas lines, strip boards, f/e electronics and tested before the start of COMPASS run

Full Scale prototype position in COMPASS area. The prototype should be fixed at this point in May 2010 F S prototype position COMPASS MF2

Wiring of MDT detectors

Wiring machine for MDT detectors

Assembled MDTs (in black envelops) and profiles prepared for wiring

sev@cern.ch ander.Nagaytsev@cern.ch DAQ VME crate 9U VME crate 6U VME crate 6U COMPASS CATCH Hot link cables MWDB units to DAQ crate AAlexander.NagaytWIRE R/O analog & digital sev@cern.ch ander.Nagaytsev@cern.ch STRIP R/O digital RW-TDC QTC–16 ADB-32 (A-32) analog ASum-96 digital A2DB-32 Range System Prototype Read Out Scheme

Geometrical acceptance study of muon system in case of: full PANDA setup (material) Pythia as event generator (40K DY events) + PandaRoot. Option: with/without magnetic field in Solenoid/Dipole. Polar angle distribution of DY photons.

Plans for 2010: * FS prototype : - finish full assembly (HV, LV, cabling, gas lines, f/e electronics etc) - start running (r/o test with long 2-4 m strips) in summer 2010 - study of wave impedance for strip r/o * RS prototype : - finish production (300 MDTs, absorber structure, strip boards, cables etc) - produce and test f/e electronics (292 boards of different types) - move to CERN - assemble (at COMPASS) and test with cosmic (debugging) - start running in late autumn 2010 at PS (subject to available resources) * Software development in PANDAroot : - finish acceptance studies for muons (DY, J/ , D-mesons) with high statistics - track finding algorithms for muons in Range System (together with Torino/INFN group) - pattern recognition algorithms – muons vs hadrons (together with Torino/INFN group)

Backup slides

G10 fiberglass strip board (1cm wide strips) at CERN/COMPASS

Strip R/O from RS Prototype A-32 preamp. card Fe absorber plate MDTs strip (1cm) board

RS prototype absorber plates manufactured in Dubna

RS prototype absorber structure/frame

RS prototype assembly process (start)

RS prototype assembly process (close to finish)

RS prototype assembly finished ( 60mm plates – black, 30mm plates – blue )