Electronics, Trigger and DAQ for SuperB

Slides:



Advertisements
Similar presentations
1 Calorimeter Trigger to L1-Board data transmission Umberto Marconi INFN Bologna.
Advertisements

E-link IP for FE ASICs VFAT3/GdSP ASIC design meeting 19/07/2011.
A Gigabit Ethernet Link Source Card Robert E. Blair, John W. Dawson, Gary Drake, David J. Francis*, William N. Haberichter, James L. Schlereth Argonne.
PCIe based readout U. Marconi, INFN Bologna CERN, May 2013.
SODA: Synchronization Of Data Acquisition I.Konorov  Requirements  Architecture  System components  Performance  Conclusions and outlook PANDA FE-DAQ.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
CERN Real Time conference, Montreal May 18 – 23, 2003 Richard Jacobsson 1 Driving the LHCb Front-End Readout TFC Team: Arek Chlopik, IPJ, Poland Zbigniew.
Network Architecture for the LHCb DAQ Upgrade Guoming Liu CERN, Switzerland Upgrade DAQ Miniworkshop May 27, 2013.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Data Acquisition Backbone Core J. Adamczewski-Musch, N. Kurz, S. Linev GSI, Experiment Electronics, Data processing group.
Latest ideas in DAQ development for LHC B. Gorini - CERN 1.
LHCb DAQ system LHCb SFC review Nov. 26 th 2004 Niko Neufeld, CERN.
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
Online Monitoring System at KLOE Alessandra Doria INFN - Napoli for the KLOE collaboration CHEP 2000 Padova, 7-11 February 2000 NAPOLI.
A Super-TFC for a Super-LHCb (II) 1. S-TFC on xTCA – Mapping TFC on Marseille hardware 2. ECS+TFC relay in FE Interface 3. Protocol and commands for FE/BE.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
ROM. ROM functionalities. ROM boards has to provide data format conversion. – Event fragments, from the FE electronics, enter the ROM as serial data stream;
ESDG Mtg 15th April CMS-FED Production FEDv1 Productions Jan 2003 : 2 boards. Working. June 2003 : 3.
SuperB DAQ U. Marconi Padova 23/01/09. Bunch crossing: 450 MHz L1 Output rate: 150 kHz L1 Triggering Detectors: EC, DC The Level 1 trigger has the task.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
The Evaluation Tool for the LHCb Event Builder Network Upgrade Guoming Liu, Niko Neufeld CERN, Switzerland 18 th Real-Time Conference June 13, 2012.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
SPIRAL2 Andrea Triossi INFN - LNL Gaspard – Hyde – Trace Workshop October , Padova.
D.Breton, U.Marconi, Perugia SuperB Workshop – June 16th 2009 Electronics, Trigger and DAQ for SuperB: proposal for the system architecture. Dominique.
Some thoughs about trigger/DAQ … Dominique Breton (C.Beigbeder, G.Dubois-Felsmann, S.Luitz) SuperB meeting – La Biodola – June 2008.
A DWDM link for Real-Time data acquisition systems
Giovanna Lehmann Miotto CERN EP/DT-DI On behalf of the DAQ team
Modeling event building architecture for the triggerless data acquisition system for PANDA experiment at the HESR facility at FAIR/GSI Krzysztof Korcyl.
M. Bellato INFN Padova and U. Marconi INFN Bologna
Use of FPGA for dataflow Filippo Costa ALICE O2 CERN
The Data Handling Hybrid
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
D. Breton, S. Simion February 2012
Modeling event building architecture for the triggerless data acquisition system for PANDA experiment at the HESR facility at FAIR/GSI Krzysztof Korcyl.
PANDA collaboration meeting FEE session
Electronics Trigger and DAQ CERN meeting summary.
ETD summary D. Breton, S.Luitz, U.Marconi
ETD/Online Report D. Breton, U. Marconi, S. Luitz
CERN meeting report, and more … D. Breton
Possible contribution of Pisa on pixel electronics R&D
Status of ETD/Online D. Breton, U.Marconi, S.Luitz
Modelisation of SuperB Front-End Electronics
The Data Handling Hybrid
ETD/Online Report D. Breton, U. Marconi, S. Luitz
DCH FEE 28 chs DCH prototype FEE &
TELL1 A common data acquisition board for LHCb
RT2003, Montreal Niko Neufeld, CERN-EP & Univ. de Lausanne
FF-LYNX (*): Fast and Flexible Electrical Links for Data Acquisition and Distribution of timing, trigger and control signals in future High Energy Physics.
DAQ upgrades at SLHC S. Cittolin CERN/CMS, 22/03/07
Trigger, DAQ, & Online: Perspectives on Electronics
CMS EMU TRIGGER ELECTRONICS
CS 286 Computer Organization and Architecture
PCI BASED READ-OUT RECEIVER CARD IN THE ALICE DAQ SYSTEM
FPGA-based Time to Digital Converter and Data Acquisition system for High Energy Tagger of KLOE-2 experiment L. Iafolla1,4, A. Balla1, M. Beretta1, P.
Example of DAQ Trigger issues for the SoLID experiment
Impact of Serializer/Deserializer Architecture on ETD High-Speed Links
SVT detector electronics
John Harvey CERN EP/LBC July 24, 2001
The Online Detector Control at the BaBar experiment at SLAC
LHCb Trigger, Online and related Electronics
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
ETD parallel session March 18th 2010
SVT detector electronics
Electronics, trigger and DAQ for SuperB.
Electronics, Trigger and DAQ for SuperB: summary of the workshop.
The LHCb Front-end Electronics System Status and Future Development
TELL1 A common data acquisition board for LHCb
U. Marconi, D. Breton, S. Luitz
Fixed Latency Serial Links with FPGA-embedded SerDes for SuperB
Presentation transcript:

Electronics, Trigger and DAQ for SuperB U. Marconi, INFN Bologna Bologna 18/3/2009

Organization Two domains: Electronics, Trigger and DAQ DAQ/Online. Fast Control and Timing System Data Links FEB mezzanines Hardware Trigger (L1) ROM Boards DAQ/Online. HLT cluster Event Builder Configuration and monitoring software

SuperB Working Conditions RF in SuperB: ~ 450MHz Bunch crossing rate RF/2 = 225 MHz. 450 MHz scenario: evaluate the potential implications on the electronics system (however it shouldn’t affect the architecture described here). 225 MHz is a too high a frequency to be used directly to drive the electronics. A good compromise would be a system clock running at RF/8 = BX/4 = 56.25 MHz It permits operating the electronics effectively without synchronizations issues. The clock can be multiplied locally to run sub-systems faster if needed. Hardware trigger rate is expected to be of the order of 150 kHz at the instantaneous luminosity of 1036 . The sole Bhabha’s background would be 50 kHz.

ETD FCTS FEB ROM Hardware Trigger L1 Detector HLT Throttle Request Clock Commands MEP Destination Address Throttle Request Clock Commands L1 accept FEB ROM L1 accept Clock Commands L1 primitives Event fragments Hardware Trigger L1 Throttle mechanism: FCTS command to L1 Detector HLT

FEB ETD FEB mezzanines FCTS FEB Mezzanine Throttle Clock Request Commands L1 accept FEB FEB Mezzanine L1 Buffer Event Fragments L1 Buffer

ETD ROM ROM FCTS FEB Mezzanine Optical Output Input Interface FEE Throttle Request Clock Commands L1 accept ROM Optical Input FEB Mezzanine Output Interface FEE Processing Unit Event Fragments

ETD main features Synchronous and fully triggered system. Triggered transfer of the event fragments from the FE boards to the ROM, through optical data links. Asynchronous event fragments transfer to the HLT. Transfer of Multi Event Packets form ROMs to the HLT in pull mode: to the idle worker node of the HLT cluster asking for data. Standard for the whole collaboration on custom electronics: FEB mezzanines ROM boards Data Links FCTS distribution system and receivers (see FEBs).

ETD Items Electronics, Trigger, DAQ FEE Mezzanine Management Overall System architecture Fast Control & Timing System Architecture of the system and simulation Interface with subsystems Interface with machine Interface with triggers Interface with ROM Interface with FEE SERDES for FEE clock & control Off the shelf chipset TX and/or Rx on FPGA Component validation for radiation System synchronization issues Data Links SERDES for data links Radiation Tolerant Tx (on detector) TX and Rx on FPGA FEE Mezzanine Architecture of the mezzanine board Fast Control System Receiver L1 Trigger Buffer Transmission logics Hardware Trigger Architecture of the system and simulation Electromagnetic Calorimeter Trigger Drift Chamber Trigger Vertex Detector Trigger Combined Trigger System ROM Requirements as general purpose device Architecture on custom board Optical Rx on FPGA Network interface technology Implementation on commodity hardware Optical Rx PCI express module Network interface PCI express module

R&D Issues, priorities, plans have to be better understood and agreed. FCTS and Data Link Architecture, components and validation for radiation. ROM as general purpose standard board On custom electronics On commodity hardware Is it that feasible? Does it allow us to save money?

Interests FCTS Data Links FEB Mezzanine Hardware Trigger ROM LAL , Napoli, Padova Data Links Bologna, LAL , Napoli, Padova FEB Mezzanine LAL Hardware Trigger ? ROM Bologna, LAL, Roma Tor Vergata

Man Power for TDR (months) ITEM Required Offered Missing Management 6 Overall Architecture FCTS 36 34 2 Data Links 16 20 FEB mezzanine 18 12 Hardware Trigger 48 11 37 ROM 14 22 Requests for contracts: 1 post doc for a Physicist; 1 Engineer . To work on Hardware Trigger simulations and ROM board design respectively.

Conclusions Hardware Trigger not covered yet. BaBar solution with reduced latency is the baseline. Bhabha veto is needed and feasible? Does the vertex detector trigger really help? How do they affect the combined trigger architecture? Design of the architecture and of fundamental building blocks of the system launched.