R. Bates UK-V meeting Liverpool, 21/04/2004

Slides:



Advertisements
Similar presentations
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
Advertisements

NO YES Question 3 Question 2 Question 1 Topic 1 Next Topic 1.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Electrical and thermal testing at Glasgow and Liverpool.
Mr Barton’s Maths Notes
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Spine team meeting 23/01/2001H.-G. Moser MPI, Munich Agenda/Topics 1) IHEP pre-series 2) Bias Contact 3) Straight Split. 4) Design variations and improvements.
How to Make a Badge *All manufacturers must read this TWICE before attempting to make their badges! Press F5 (on the upper part of your keyboard) to begin.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Hybrid Integrated Circuit
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
Situation with industry
When & How to Order Supplies. Before ordering supplies, it is important to check supply levels to see what supplies will be needed. Press and hold the.
Manchester Qualification M-O-048. Mechanical dummy. Check that tuning of alignment parameters had correct sign and adjustment of transfer chucks Z was.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Endcap Module Status Agreed Responsibilities Overall Production UK Situation Global Schedule Issues General Production Issues.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
1 HCAL production, QC and preparation for installation Overview of the status report Rustem DZHELYADIN (IHEP, Protvino)  The general status.
UK ATLAS SCT Module Quality Assurance Joe Foster, Manchester University 04 Jan 2005 All results compiled in time for Christmas…
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Transferring the design to CAD – 2D Design Cutting out the design using CAM Folding using a strip heater….. ….. and jig Applying graphics to the final.
SCT week: 14th - 16th Dec 04 Spine progress R. Bates University of Glasgow.
MICE Phone Meeting 26 October Status report of Waveguides for Station5 Hideyuki Sakamoto Contents Review of production process Present status Plans.
23 September 2010 Casablanca, Morocco CALICE Collaboration Meeting Hassan University HASSAN II 1 Towards Ecal Assembly Julien Bonis
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
PSL Metrology Pte Ltd – CSE Training Overview PSL Metrology Pte Ltd, confidential.
Welcome to Team PosaCash Training video “Invitations and Marketing site” Where We Create POSITIVE.
1.I interaction with VakuumPraha using basic drawings. We made a deal for 19'310 EUR + tax for two vacuum chambers plus the compensation system, we provide.
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
Measuring, calculating and drawing angles...
ATLAS pixel module assembly flow
US TileCal Meeting at UT Arlington
Update on Pavia MM mechanical prototype
MODULE QUALIFICATION STATUS AT LIVERPOOL
Complementary ISTC Projects #3888, 3889p
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
The circumference of a circle
SCHEDULE Nov 1st - Assembly Table Complete
Algebra 5. Double Brackets
GRPC activity for EuDHCAL in IHEP-Protvino
Monday, August 24 Today Complete AIMS post-test
FRAGRANCES FOR LIFE DISCOUNT PERFUME AND COLOGNE
F. Ronchetti, INFN-LNF, September
ATLAS ITK WP3 WP3 Bi-weekly meeting
SIT AND FTD DESIGN FOR ILD
We’ll be spending minutes talking about Quiz 1 that you’ll be taking at the next class session before you take the Gateway Quiz today.
Mr Barton’s Maths Notes
Measuring, calculating and drawing angles...
Industrial Technology Timber Stage 5
Measuring, calculating and drawing angles...
The Systems Life Cycle: Implementation
Entrepreneurial Mindset 3 Simple but Not Easy Questions
The properties of the division operation
Liverpool Tutoring Centre - Mammoth Learning
***Forces Assessment on Wednesday!!!***
FM2 Section A Planning Workshop
Measuring, calculating and drawing angles...
Measuring, calculating and drawing angles...
Measuring, calculating and drawing angles...
Measuring, calculating and drawing angles...
What is our assembly about today?
Measuring, calculating and drawing angles...
Pixel layouts, cost, production…
Presentation transcript:

R. Bates UK-V meeting Liverpool, 21/04/2004 Spine Status R. Bates UK-V meeting Liverpool, 21/04/2004 21/04/2004 R. Bates UK-V meeting Liverpool

R. Bates UK-V meeting Liverpool Present Status Spines ready/almost ready to ship at CERN: Outer: 41 (19 given to Steve Snow today) Middle: 28 (6 to Valencia today) Inner: 8 Arriving at CERN soon: Middles: 16 today (by hand from IHEP) At ISTC - 15/04/2004, (with extra padding) Inner: 6 Outer: 77 21/04/2004 R. Bates UK-V meeting Liverpool

R. Bates UK-V meeting Liverpool Washer gluing at CERN More jigs, totals: Outer: 7 Middle: 8 Inner: 8 Rate is twice jig number per day Some problems with gluing at CERN (1 washer the wrong way round) and general QA (HV strip) I will check all spines from now on before shipping. Please tell me of expected problems so I can watch for them 21/04/2004 R. Bates UK-V meeting Liverpool

R. Bates UK-V meeting Liverpool Bow All TPG rolled before assembly into spines Bow, if present, corrected for at IHEP once made into a spine Bow further corrected for at CERN, if present Geneva happy that flattened spines work Manchester seen creases in flattened TPG Roll TPG at module production sites if required rather than at CERN during washer gluing 21/04/2004 R. Bates UK-V meeting Liverpool

R. Bates UK-V meeting Liverpool Protvino meeting 31/3/04 Aim to increase spine production rates and understand production steps 3 organisations: NIIGraphite, NIITAP & IHEP New contract with NIIGraphite to accelerate TPG production 2nd new contract with IHEP (inc. NIITAP) Main problems at NIITAP. Responsible for many stages Low yield with TPG handling (80%) Limited manpower and equipment – no redundancy 21/04/2004 R. Bates UK-V meeting Liverpool

Towards faster production rate I now have a phone meeting with IHEP, to be enlarged to include NIIGraphite and NIITAP. IHEP now working double shifts to assembly spines as fast as possible NIITAP have found a company to supply equipment required to speed up TPG polishing 5 TPG spines are being made with 20um thicker machined end sections Should increase yield at NIITAP Still no 2nd laser cutter at NIITAP – rate limiting problem 21/04/2004 R. Bates UK-V meeting Liverpool