SUHFT Medical Devices Training Model

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Final Competence Assessment Assessment Documents Assessment strategy (SummitSkills) Assessment methodology (SQA) Assessment guidelines (SQA)
PRD Group Maturity Matrix 31/07/08. Maturity Matrix Guidance Notes Aims of the Matrix The Maturity Matrix is a tool aimed to support groups during their.
Effectively applying ISO9001:2000 clauses 6 and 7.
1 CREATING AN EFFECTIVE CENTRAL HARMONIZATION UNIT PEM-PAL WORKSHOP FOR INTERNAL AUDIT OFFICIALS Moldova, June 2007 Dr. Darius MATUSEVICIUS Financial.
2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
The National Survey of Reasonable Adjustments by NHS Trusts 2010 Results and recommendations Hazel Roberts, Chris Hatton and Sue Turner.
The situation The requirements The benefits What’s needed to make it work How to move forward.
PERFORMANCE FOR ALL The Project & the System. A HE project co-ordinated by University of Bristol, open to HE internationally. Developing the requirements.
Parallels in Training Techniques A Quality Approach Nicky Sharpe Moving & Handling Lead RGN MSc PGCE NAMDET Conference.
Janine Webster (Medical Device Training Officer)
Introduction to ISO New and modified requirements.
SAFE Care - ‘Safety Express’ – Mental Health & Learning Disabilities
Clinical Skills competency in a litigious Environment
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Your opportunity to influence development. Where are we up to? Current UKMi audit processes and documentation have been in use since 2010, now significantly.
‘Active Risk Management at Rotherham’ Rotherham NHS FT QUEST presentation 24th June 2011 Dr Trisha Bain.
Safety Management in Europe European Organisation for the Safety of Air Navigation Dr. Erik Merckx EUROCONTROL Directorate ATM Programmes Head of Business.
Patient Safety Issues in Gynaecology Joanna Thomas & Louise Samworth Saint Mary’s Hospital Manchester.
11 The impact of falls risk management on compliance with essential standards Sue Burn, Compliance Manager.
FEDIAF Guide to Good Practice for the Manufacture of Safe Pet Food TRAINING PACKAGE Module VII Purchasing and delivery for the Manufacture of Safe Pet.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Training for organisations participating in Peer Review of Paediatric Diabetes.
Mindset 2000 LtdSlide 1 Train to Gain Provider Support Programme October 2007 Progress and progression + evaluation.
© 2015 IHS. ALL RIGHTS RESERVED. Genstar Capital Acquires IHS Operational Excellence & Risk Management Business Ensuring the Success of Global EMIS Projects.
Parallels in Training Techniques A Quality Approach
Pipeline Safety Management Systems
Introduction to Workforce Planning
ePortfolio for continuing professional development
MyHR Update HR User Group 20th June.
Health and Safety Self Assurance Toolkit 2017
Standard Code of Conduct
Part 1 Being professional
Introduction to evaluating and measuring impact in career development Presented by – Date – Doubt, the essential preliminary of all improvement and.
Ruth Hannan, Policy & Development Manager, Carers Trust
RFID enabled Solutions
External Verification Report 2014/15
Safer Staffing – Integrated Care Teams The Right Staff, with the Right Skills, in the Right Place at the Right Time Sara Courtney – Head of Professions.
MAINPORT ePortfolio (Residency Prototype 1)
Unit Award Scheme (UAS)
Health Supply Chain Management: Session 6: Facilities, Staffing and Procurement Ghana Nursing Schools.
Safety Management in Europe
Preparing for Systems Verification
Medicines Management Tips & Preparing for your CQC Inspection with Gerry Devine Practice Management Advisor.
Project Roles and Responsibilities
CARE Mick Feather Care Business Manager.
Close Call System Enhancement Briefing Notes
Welcome SPIRAL Main title slide page Somerset Partnership
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
SAFETY RISK ASSESSMENT (JSA)
MAINPORT ePortfolio (Residency Prototype 1)
County HIPAA Review All Rights Reserved 2002.
SATISFYD CX Framework. Sustaining the Impact of Leadership Training with Joe Wozniak, AchieveGlobal.
GHS Medical Staff Appointments and Reappointments
Project Statement To create an efficient internal operating solution for aquatic facilities which enables rosters to be produced and available with direct.
Contents subject to change.
Making MDTs better Steve Falk
Falls in Older Adults I/P units
Competency Based Learning and Development
New employee induction for new staff and managers
Key Value Indicators (KVIs)
Welcome SPIRAL Main title slide page Somerset Partnership
HSE Competence Assessment/Development Process
CREATING AN EFFECTIVE CENTRAL HARMONIZATION UNIT PEM-PAL WORKSHOP FOR INTERNAL AUDIT OFFICIALS Moldova, June 2007 Dr. Darius MATUSEVICIUS Financial.
Contract Accountability & Oversight
Trust wide set up of Video Consultations – stages
Gifted & Talented Provision
That person will have been involved in the planning of the work.
Presentation transcript:

SUHFT Medical Devices Training Model Pat Taw MEMS Medical Equipment Training Co-ordinator Paul Goodfellow MEMS General Manager

The Job Role Matrix Training Delivery Recording & Evidence Monitoring & Compliance Training by exception Why this works! Progression

The Job Role Matrix Identification of staff groups. Inventory of equipment used by staff group. Risk assessment of equipment to determine training frequency & review period. Gap analysis and self assessment. Frequent users require less training

Job Role Matrix

Training Delivery Supplier led, cascade. Key trainer, end user, self verification. Face to face / peer discussion / bespoke study days/ ward based sessions (95%). Refresher – normally self assessment via METC.

Lesson Plan

Recording & Evidence Training is recorded on Competency Form and held by the member of staff The Trust central database, iLearn is populated and included refresher training reminder

Competency Form

Monitoring & Compliance Monitoring is a four stage process: 1. Agreed JRM 2. Gap analysis to identify training needs 3. Active training 4. Population of iLearn Each stage is measured to determine the compliance Currently unable to provide a complete Trust wide training compliance until iLearn is fully populated.

Training by exception New equipment Acceptance test process Incident reports – Trust via Datix Event reports – MEMS via Medusa User rotation i.e. internal incident New staff Staff returning from long term leave Response to guidance, safety alerts Ad hoc requests

Why this works! Based on risk – keep it simple Achievable – Staff engagement Central, accessible bespoke database Training is integral to medical equipment management Traceability / auditable – improvement

Progression linking on-line training material to iLearn course Competency forms attached to iLearn with electronic self verification Staff account on iLearn will identify the equipment to that member of staff rather than the job role Development across Essex