Studies on Energy Deposition and Radiation for the 4horn system

Slides:



Advertisements
Similar presentations
Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
Advertisements

1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
Chris Densham RAL High Power Targets Group To be a ‘one-stop shop’ (P. Hurh) for target technology Enable optimum physics performance via sound engineering.
Target station and optimization studies for ESS Super Beam E. Baussan, M. Dracos, N. Vassilopoulos IPHC/CNRS.
Operated by Brookhaven Science Associates for the U.S. Department of Energy A Pion Production and Capture System for a 4 MW Target Station X. Ding, D.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
MERIT Beam Collimator Design Nicholas Olesen 9 August 2006.
Nikolas Vassilopoulos, IPHC/CNRS, Strasbourg. Talk layout  Target Studies  Horn shape & SuperBeam Geometrical Optimization  Horn Thermo-mechanical.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
A new design for the CERN to Fréjus neutrino beam Marco Zito (IRFU/CEA-Saclay) For the EUROnu WP2 team NUFACT11 Geneva August 2nd 2011.
Radiological Aspects of ILC Hee-Seock Lee Pohang Accelerator Laboratory 2 nd Workshop of Korean ILC at PAL.
LAGUNA/LBNO WP4: secondary beam line status report M. Calviani, P. Velten, A. Ferrari, I. Efthymiopoulos, C. Lazaridis (CERN) + M. Zito, V. Galymov (CEA),
Horn design for the CERN to Fréjus neutrino Super Beam Nikolas Vassilopoulos IPHC/CNRS.
EUROnu Target and Horn Studies Nikolaos Vassilopoulos/IPHC-CNRS on behalf of WP2 1ECFA Review PanelDarensbury, 02/05/2011.
Low energy ν-beam for EUROSB Marcos Dracos, Nikos Vassilopoulos IPHC Strasbourg, IN2P3/CNRS.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Radiation Protection considerations concerning a future SPS dump design Helmut Vincke DGS-RP.
First AWAKE dump calculations Helmut Vincke. Beam on dump Muon axis inside and outside CERN Distances: Beam impact point to end of West hall: ~300 m Beam.
Status of the FAIR pbar Source K. Knie May 3, 2011.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
Safety issues for WP2 E. Baussan on behalf of WP2.
CENF secondary beam study group 1 st meeting - 7 th May 2013 M. Calviani (EN/STI)
Radiation safety evaluation for “KAMABOKO” Main Linac Tunnel KEK-APL : T.Sanami, S.Ban KEK-ACC : A.Enomoto, M.Miyahara ILC Mechanical & Electrical Review.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Integrated Radiation Measurement and Radiation Protection of BES Ⅲ Zhang Qingjiang, Wu protection group, accelerator center, IHEP,
Status of Radiation Protection Studies for the Linac4 beam dumps Joachim Vollaire DGS/RP.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
MARS15 RESULTS FOR THE LBNE-BLIP IRRADIATION TEST LBNE-BLIP Irradiation Test Meeting Fermilab February 19, 2010 Nikolai Mokhov FermilabAccelerator Physics.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Collimator and beamline heating External Review of the LHC Collimation Project CERN Wed 30/6/2004.
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
Considerations for an SPL-Beamdump Thomas Otto CERN in collaboration with Elias Lebbos, Vasilis Vlachoudis (CERN) and Ekaterina Kozlova (GSI) Partly supported.
Radiation Protection in J-PARC neutrino beam line Sep Yuichi Oyama (KEK) for T2K neutrino beam line construction group Happy birthday.
New SPS scraping system: preliminary RP remarks Helmut Vincke DGS-RP.
WP2 progress on safety E. Baussan EUROnu CB Meeting Monday 10th & Tuesday 11th June 2011 CERN, Geneva, Switzerland.
Radiation Protection Considerations for the CDR Helmut Vincke DGS-RP.
Target/Horn Station for ESS ν SB Nikolaos Vassilopoulos IPHC/CNRS.
Target/Horn Station for ESS ν SB Nikolaos Vassilopoulos IPHC/CNRS.
WP2 13/07/2011M. Dracos1 Marcos Dracos IPHC-IN2P3/CNRS, Strasbourg.
Engineering studies for CN2PY secondary beam. LAGUNA-LBNO General Helsinki, 26/08/20141 F. Sanchez Galan (CERN) on behalf of the CERN Secondary.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
Neutron double differential distributions, dose rates and specific activities from accelerator components irradiated by 50 – 400 MeV protons F. Cerutti.
Status of the target and beam line optimization for LAGUNA/LBNO Oxford meeting 2 nd -4 th July 2012 P. Velten, M. Calviani on behalf of the CERN-LAGUNA.
KEK Radiation Related Topics neutrino beam construction subgroup Yuichi Oyama (KEK) and target monitor subgroup for.
EUROnu Super Beam Work package Marco Zito (IRFU/CEA-Saclay) For the WP2 team EURONu Review CERN April
General overview, layout of the pbar separator Target handling concept FLUKA calculations - for the target station - for the shielding flask Status of.
ESSνSB: The ESS neutrino facility for CP violation discovery
Institute of Applied Mechanics
J. Bauer, V. Bharadwaj, H. Brogonia, A. Fasso, M. Kerimbaev, J. Liu, S
Heating and radiological
Horn and Solenoid Options in Neutrino Factory
Beam switching yard interfaces
Measurements and FLUKA Simulations of Bismuth and Aluminum Activation at the CERN Shielding Benchmark Facility(CSBF) E. Iliopoulou, R. Froeschl, M. Brugger,
Radiation protection of Linac4 M. Silari Radiation Protection Group
WP2 (SuperBeam) Targets Status of Work Programme
SPL Super Beam and MEMPHYS detector simulations
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Collector and the SPL Super-Beam Project
Use of Beam Loss Monitor type detectors in CNGS muon station
EUROnu Beam Window Studies Stress and Cooling Analysis
EURO Conclusions from Cracow meeting
Preliminary Study – Radiation induced activity in a SB Target
Fassò, N. Nakao, H. Vincke Aug. 2, 2005
CFS consideration on the Main Dump and around
Beam dump for J-Parc neutrino facility
MERIT Beam Collimator Design
Exercise: Activation 7th FLUKA Course NEA Paris, Sept.29-Oct.3, 2008.
Target Station Facility Safety ASPECTs
Presentation transcript:

Studies on Energy Deposition and Radiation for the 4horn system N.V., EUROnu, IPHC Strasbourg 1 1

N.V., EUROnu, IPHC Strasbourg Talk’s Layout Energy Deposition - packed bed target: Latest Horn Design 4horn system SB layout elements Radiation: activities - Ti packed bed target dose rates: see Eric’s talk N.V., EUROnu, IPHC Strasbourg 2 2

N.V., EUROnu, IPHC Strasbourg Power for 4horn System, 350kA 1.3MW, Ti packed bed target studies done with flair 0.9.1 with geoviewer 0.9, fluka 2008.3d for 1horn, 1.3 MW beam, 350kA total power for different parts: dpacked = 74% dTi (gr target in parenthesis) 1.7 (1.3)kW 1.28 (0.6)kW 2.3 (1.9)kW 1.2 (1)kW 0.38 (0.3)kW 9.8 (6)kW Et =113 (64)kW 0.58 (0.5)kW Etoth= 21.2 (14.4)kW 3.9 (2.6)kW stats: 106 protons N.V., EUROnu, IPHC Strasbourg 3 3

N.V., EUROnu, IPHC Strasbourg Power on horn # 2,4 (next to the active one) active horn is # 1, 1.3MW beam, 350kA, Gr target shown upstream plates Etoth= 14.4kW 2nd 1st 1st 3rd 4th Etoth= 0.8kW 2nd or 4th N.V., EUROnu, IPHC Strasbourg 4 4

N.V., EUROnu, IPHC Strasbourg Power on horn # 3 (diagonal to the active one) active horn is # 1, 1.3MW beam, 350kA, Gr target shown upstream plates Etoth= 0.8kW 2nd 1st 2st or 4th 3rd 4th Etoth= 0.4kW 3rd N.V., EUROnu, IPHC Strasbourg 5 5

N.V., EUROnu, IPHC Strasbourg Power for SB Layout, 4MW FLUKA schematics for SB layout, service gallery not studied yet stats: 4x105 protons He, Fe, Concrete, Gr to scale: Ddt= 4m Ptot = 3.25MW example model based on info from T2K talks at NBIs N.V., EUROnu, IPHC Strasbourg 6 6

Power for SB Layout, 4MW FLUKA schematics for SB layout, service gallery not studied yet R-Z Power density distribution in kW/cm3 no target/station and upstream decay tunnel collimators power is confined in concrete, iron will be used in-between the target/horn and service galleries design in progress study based on info from T2K talks at NBIs N.V., EUROnu, IPHC Strasbourg 7 7

Power in Target Horn Station, 4MW Power scoring parameters: concrete: t = 5.7m L = 4m P = 128kW collimator, water cooled (in T2K): tFe = 60cm LFe =160cm PFe = 420kW He vessel, water cooled: tFe = 10cm LFe= 4m PFe = 243kW L = 4m, to be shorten shielding will be re-defined for the protection of the service gallery and equipment N.V., EUROnu, IPHC Strasbourg 8 8

Power in Target Horn Station, 4MW R-Z Power density distribution in kW/cm3 P concrete : 128kW P vessel = 243kW P collimator = 420kW N.V., EUROnu, IPHC Strasbourg 9 9

N.V., EUROnu, IPHC Strasbourg Power in Decay tunnel Power scoring parameters: concrete: t = 6m L = 20m P = 452kW upstream collimator (will be re-defined accordingly) : tFe = 5m LFe = 5m PFe = 420kW He vessel, water cooled tFe = 1.6cm LFe= 25m PFe = 362kW He decay tunnel: R = 2m L = 25m PHe = 1.5kW N.V., EUROnu, IPHC Strasbourg 10 10

Power in Decay Tunnel Elements R-Z Power density distribution in kW/cm3 end tunnel P collimator = 420kW P concrete = 452kW P vessel = 362 kW P He = 1.5kW N.V., EUROnu, IPHC Strasbourg 11 11

N.V., EUROnu, IPHC Strasbourg Power in Beam Dump Power scoring parameters: concrete: t = 5.4m L = 8.4m He vessel + iron plates, water cooled tFe = 10-40cm LFe= 4m upstream shield (iron plates), water cooled tFe = 40cm LFe = 1m Graphite beam dump: L = 3.2m, W = 4m, H = 4m P= 473kW downstream iron shield (iron plates), water cooled: LFe = 40cm, WFe = 4m, HFe = 4m PFe = 9.2kW outer iron shields (iron plates), water cooled L Fe= 2m, WFe = 4.8m, HFe = 4.8m PFe = 1kW N.V., EUROnu, IPHC Strasbourg 12 12

Power in Beam Dump P graphite = 473kW P outer shield= 1kW R-Z X-Y Power density distribution in kW/cm3 Power in Beam Dump R-Z Power density distribution in kW/cm3 P graphite = 473kW P outer shield= 1kW end of beam dump structure: Power Density minimum along the direction of secondary beam N.V., EUROnu, IPHC Strasbourg 13 13

Layout of Radiation Studies for a given part of the SB layout e.g. target, horn, cable, tunnel ... specify the level radioactivity and its synthesis after irradiation of 200days and different cooling times ... use MicroShield program to calculate effective doses at the different distances from the radiated material benchmark the results with CNGS studies: CNGS http://proj-cngs.web.cern.ch/proj-cngs/ private communication with Stefan Roesler, DGS/RP (radioprotection group), CERN more from Eric ... N.V., EUROnu, IPHC Strasbourg 14 14

N.V., EUROnu, IPHC Strasbourg Ti packed target's radioactivity, 4MW (also, for 1.3MW) : irradiation=200days, cooling times= 1d, 10y cooling: 1d stats: 106 protons cooling: 10y N.V., EUROnu, IPHC Strasbourg 15 15

N.V., EUROnu, IPHC Strasbourg Ti packed target's radioactivity, 4MW : irradiation=200days cooling times= 1d, 1m, 1/2y, 1y, 10y, 50y, 100y 1m 1/2y 1y 10y 50y stats: 106 protons N.V., EUROnu, IPHC Strasbourg 16 16

N.V., EUROnu, IPHC Strasbourg plans for next 2 months further studies on Power Densities add service gallery and optimize SB layout on radiation use 4horn system to calculate the activities on target and horns initially, along the layout later in addition, utilize FLUKA to calculate the dose rates: private communication with CERN THANKS N.V., EUROnu, IPHC Strasbourg 17 17