CNGS Run 2007: Radiation Issues

Slides:



Advertisements
Similar presentations
Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Advertisements

Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
Now2008 Paola Sala for the CNGS SBWG CNGS status Paola Sala, INFN Milano on behalf of the CNGS Secondary beam working group.
January 23 rd, 2008 CNGS & OPERA status Yves Déclais 1 I) CNGS status radiation damage on electronics strip line repair II) OPERA issues Based on the work.
1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
ISS, 23 September 2005E. Gschwendtner, CERN1 Beam Instrumentation at CNGS 1. Introduction 2. Layout 3. Beam Instrumentation 4. Summary.
CNGS Operation Results 2008 Edda Gschwendtner AB/ATB on behalf of the CNGS team.
Performance and Operational Experience of the CNGS Facility Edda GSCHWENDTNER, Dario AUTIERO, Karel CORNELIS, Ilias EFTHYMIOPOULOS, Alfredo FERRARI, Alberto.
The CNGS Operation and Perspectives l Edda Gschwendtner, CERN.
Status of the OPERA experiment Yoshiaki Nonoyama Nagoya Univ.
Radiation Environment at AWAKE Silvia Cipiccia, Eduard Feldbaumer, Helmut Vincke.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
WIN’11 CERN Neutrinos to Gran Sasso: The CNGS Facility at CERN l Edda Gschwendtner, CERN WIN’11, Cape Town, South Africa, 31 st Jan – 5 th Feb 2011.
LAGUNA/LBNO WP4: secondary beam line status report M. Calviani, P. Velten, A. Ferrari, I. Efthymiopoulos, C. Lazaridis (CERN) + M. Zito, V. Galymov (CEA),
CNGS ISSUES - THAT COULD DISTURB A SMOOTH OPERATION IN 2009 Thanks to colleagues who contributed to the slides: E. Gschwendtner, A. Pardons, H. Vincke,
The CNGS Facility: Performance and Operational Experience Edda GSCHWENDTNER, Karel CORNELIS, Ilias EFTHYMIOPOULOS, Alfredo FERRARI, Ans PARDONS, Heinz.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
Electrical Discharge Circuit for CNGS Horn & Reflector PH/DT1 Group Meeting, 23 October 2007 Gilles MAIRE PH/DT1-IC Section Leader.
CNGS PROJECT STATUS D.Autiero 21/5/2003 General status 2003 Project review CNGS upgrade.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
6 April 2006E. Gschwendtner, CERN AB/ATB1 CNGS Project: Secondary Beam 1. Layout 2. Beam Instrumentation 3. Commissioning Plans for the Secondary Beam.
Integrated Radiation Measurement and Radiation Protection of BES Ⅲ Zhang Qingjiang, Wu protection group, accelerator center, IHEP,
ATC/ABOC days, 24 January 2007Edda Gschwendtner1 CNGS : Status and Outlook Edda Gschwendtner, AB/ATB Summary of CNGS 2006 Reflector Repair OPERA Brick.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
CNGS Operation Summary Edda Gschwendtner, CERN. Outline Introduction CNGS Performance Highlights since last NBI 2010 in Japan Issues Summary 2E. Gschwendtner,
6 April 2006Malika Meddahi 1 CNGS Project: primary beam 1.Project Overview 2. Proton beam line overview and status 3. Target status 4. Commissioning preparation.
Application of FLUKA to fixed- target programs at CERN: a short, not exhaustive selection M. Calviani (CERN) With contributions from: M. Brugger, F. Cerutti,
M.Moll, M.Silari, H.Vincke – 3.April Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN:
WP2 progress on safety E. Baussan EUROnu CB Meeting Monday 10th & Tuesday 11th June 2011 CERN, Geneva, Switzerland.
Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN: mainly LHC related topics CERF: beside LHC topics.
AWAKE: D2E for Alexey beam properties Silvia Cipiccia, Eduard Feldbaumer, Helmut Vincke DGS/RP.
TE-MPE-CP, RD, LHC risk review 06-Mar R. Denz TE-MPE-CP Radiation Hardness of Cold By-pass Diodes Acknowledgements: D. Hagedorn (former project.
Ma zhongjian Ding yadong Wang qingbin Wu qingbiao Radiation Protection Group/IHEP.
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
Status of the FAIR pbar target: Target handling study (M. Helmecke)
The New Radiation test facility at CERN: CHARM December 8 th 2014 CERN R2E project ESA/CERN meeting - December 8 th 2014 The new radiation tests facility.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
HiRadMat Summary of Phase-I and plans for Phase-II commissioning J. Blanco, N. Conan, V. Kain, K. Cornelis, B. Goddard, C. Hessler, M. Meddahi, C. Theis,
KEK Radiation Related Topics neutrino beam construction subgroup Yuichi Oyama (KEK) and target monitor subgroup for.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Status of the FAIR Antiproton Target K. Knie.
V. Raginel, D. Kleiven, D. Wollmann CERN TE-MPE 2HiRadMat Technical Board - 30 March 2016.
Dark Current and Radiation Shielding Studies for the ILC Main Linac
Matters arising RADWG - 3 July 2009
Heating and radiological
BEAM LOSS MONITORING SYSTEM
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
Outlook by the Physics Coordinator
Status of the OPERA experiment
CNRAD dosimetry and Summary of the TS
OPERA Stato dell’esperimento Run 2007
TI8/WIC Incident & UJ87/UA87 Radiation Levels & Analysis
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
BEAM LOSS MONITORING SYSTEM
Collimator Control (SEUs & R2E Outlook)
Hadron stop Design Features
CNGS - CERN Neutrinos to Gran Sasso
Beam Tests of Ionization Chambers for the NuMI Neutrino Beam Monitoring System MINOS.
Use of Beam Loss Monitor type detectors in CNGS muon station
BLMs - Radmon – BSCs – BCMs for steering the beams in collision during the engineering run at 450 GeV Thijs Wijnands (TS/LEA), Richard Hall Wilton (TS/LEA),
Status of muon monitor R&D and construction
Preliminary Study – Radiation induced activity in a SB Target
CNGS Project Overview Konrad Elsener.
Beam Dump Experiments with Photon and Electron Beams
Antoine Cazes Université Claude Bernard Lyon-I December 16th, 2008
CEPC Radiation and Shielding
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

CNGS Run 2007: Radiation Issues Edda Gschwendtner On behalf the CNGS Secondary Beam Working Group

Outline CNGS Overview Run 2007 Radiation Issues during the Run Expected Radiation Levels Summary 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

CNGS (CERN Neutrino Gran Sasso) A long base-line neutrino beam facility (732km) send nm beam produced at CERN detect nt appearance in OPERA experiment at Gran Sasso  direct proof of nm - nt oscillation (appearance experiment) Task for CERN: produce intense nm beam towards Gran Sasso 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

CNGS Proton Beam Parameters Nominal CNGS beam Nominal energy [GeV] 400 Normalized emittance [mm] H=12 V=7 Emittance [mm] H=0.028 V= 0.016 Momentum spread Dp/p 0.07 % +/- 20% # extractions per cycle 2 separated by 50 ms Batch length [ms] 10.5 # of bunches per pulse 2100 Intensity per extraction [1013 p] 2.4 Bunch length [ns] (4s) 2 Bunch spacing [ns] 5 Beta at focus [m] hor.: 10 ; vert.: 20 Beam sizes at 400 GeV [mm] 0.5 mm Beam divergence [mrad] hor.: 0.05; vert.: 0.03 Expected beam performance: 4.5 x 1019 protons/year on target 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

CNGS Challenges High Intensity, High Energy Proton Beam Tune, tune, tune Induced radioactivity In components, shielding, fluids, etc… Intervention on equipment ‘impossible’ Remote handling by overhead crane Replace broken equipment, no repair Human intervention only after long ‘cooling time’ Design of equipment: compromise E.g. horn inner conductor: for neutrino yield: thin tube, for reliability: thick tube Intense Short Beam Pulses, Small Beam Spot Interlock, interlock, interlock Thermo mechanical shocks by energy deposition (designing target rods, thin windows, etc…)  most challenging zone: Target Chamber (target–horn–reflector) 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

E. Gschwendtner, AB/ATB SPS protons LHC CNGS pions kaons muons neutrinos 6th LHC Radiation Workshop, 29 November 2007 Neutrinos to Gran Sasso E. Gschwendtner, AB/ATB

CNGS Layout 43.4m 100m 1095m 18m 5m 67m 2.7m TBID (multiplicity) Muon Detectors Pit 1 Pit 2 p + C  (interactions)  p+, K+  (decay in flight)  m+ + nm 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

CNGS Target Chamber Installation of target magazine (4 in-situ spares) Focusing magnet (‘Horn’) 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

Muon Monitors 270cm LHC type Beam Loss Monitors 60cm Stainless steel cylinder Al electrodes, 0.5cm separation N2 gas filling 2x41 fixed monitors + 2x1 movable Online feedback to neutrino beam quality (sensitivity to any misalignment of beam vs. target vs. horn, horn/reflector currents, etc…) 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

CNGS Run 2007 (17/09-22/10/2007) nm CC interaction Smooth start-up, very good beam performance 38 OPERA events in bricks More than 400 events from interactions outside OPERA detector nm CC interaction Muon 7GeV/c Tue, 2 Oct, 17:04:25 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

CNGS Run 2007 (17/09-22/10/2007) Smooth start-up, very good beam performance 38 OPERA events in bricks More than 400 events from interactions outside OPERA detector Successive failures in the ventilation system Strong efforts made by TS/CV to save the situation Physics run stopped on Monday 22 October 2007, 5 days ahead of time. Failures in the ventilation system control electronics that blocked switching to access mode in a safe manner  intolerable for an INB facility 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

CNGS Electronics Layout Temperature Probes Ventilation Units Target Chamber Service Gallery Proton Beam Line target horn He tube 1 reflector He tube 2 decay tube Radiation ‘safe’ area for electronics TSG4 TCV4 …electronics equipment 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

Ventilation System for CNGS Unit 232 TSG44 Surface TCV4 TSG4 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB M. Batz, SBWG, 31.10.07

Incidents of CNGS Ventilation System SEU in ventilation electronics: Loss of Control and Communication & 2.) Electronics of PLC Com, PLC unit 237 and remote I/O in unit 232 failed, Repeater in profibus failed  causes units in TCV4 and units 519 and 231 to stop. 3 x Incidents: Surface TCV4 TSG4 M. Batz, SBWG, 31.10.07 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

CNGS Radiation Levels Calculations with FLUKA M. Brugger, A. Ferrari, L.Sarchiapone, AB/ATB Simulation environment: Unified approach for physics (neutrino and muon fluxes), engineering (power deposition), prompt (radiation damage) dose rates residual (maintenance and interventions) dose rates Reasonably detailed geometry down to muon pits each BLM simulated in detail Service and connection galleries empty no rack, no ventilation unit, no piping, no ducts, no doors, no dividing walls  should be conservative Common effort of AB/ATB, RP, INFN Available outputs for radiation: Absorbed and equivalent dose maps (prompt and residual) High energy hadron fluences 1 MeV neutron equivalent fluences (for Si damage) Particle spectra at several locations 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

Expected Dose Levels Gy/yr for a nominal CNGS year of 4.5 1019 pot ‘Safe’ Area, Electronics for AB, IT, TS… 0.1-1 Gy/yr Electronics of Ventilation Units must be moved! Ventilation Units Electronics for CV, crane, fire detection TSG4 TCV4 TCC4 M. Brugger, A. Ferrari, L.Sarchiapone, 28.11.07, FLUKA 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

‘Safe’ Area for Electronics Control Equipment in the CNGS Area: Ventilation System, Crane, Fire Detectors, Transformers, Battery Charger, Switchboard, Ethernet, Control for Target, Shutter, Decay Tube, Temperature Probes, Horn & Reflector Cooling system, Radiation Detector, Beam Instrumentation (BLMs, TBID, BFCT, BPMs) Electronics Racks Transformer Battery charger Switchboard TSG4 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

Expected Neutron Fluence 1 MeV eq. neutron fluence (cm-2 yr-1) for a nominal CNGS year of 4.5 1019 pot 109-1010 1MeV n eq./cm2/yr TSG4 TCV4 TCC4 M. Brugger, A. Ferrari, L.Sarchiapone, 28.11.07, FLUKA 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

Expected High Energy Hadron Fluence Energetic (> 20 MeV) hadron fluence (cm-2 yr-1) for a nominal CNGS year of 4.5 1019 pot 107-108 hadrons/cm2/yr TSG4 TCV4 TCC4 M. Brugger, A. Ferrari, L.Sarchiapone, 28.11.07, FLUKA 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

Radiation Measurements TCV4 ‘safe’ area for electr. TSG4 (vent. units) X X proton beam target X RadMon Monitors (T. Wijnands) TLDs (SC/RP) PMI detectors (SC/RP) Measurements only during last day of operation: 7.2·1016 pot 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

Summary I Detailed analysis and comparison between the simulations and measurements ongoing The numbers basically agree: Some better understanding of RadMon monitor sensitivity needed. No major changes in simulations (updated geometry) with respect to previous calculations  confirmed by measurements 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

Summary II  CNGS must be ready for beam on 28 May 2008 All installed electronics are COTS (most not even rad hard) Nearest completely safe area is ~1000m away For much of the electronics there are technical reasons to limit the cable lengths to <100m. For MTBF > 1year Area with electronics must be shielded (gain factor >104 ?!) Or move electronics to storage area and add shielding For both cases: Critical equipment for access must be moved to the surface (mainly ventilation parts) Redundancy and preventive maintenance and actions Radiation monitoring  CNGS must be ready for beam on 28 May 2008 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

Spare Slides E. Gschwendtner, AB/ATB 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

High energy hadron levels, TCV4 Energetic (> 20 MeV) hadron fluence (cm-2 yr-1) for a nominal CNGS year of 4.5 1019 pot: vertical cut along TCV4 M. Brugger, A. Ferrari, L.Sarchiapone, 28.11.07, FLUKA 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

Example Expected Particle Spectra in TSG4 Neutron (black), photon (purple), and electron (red) spectra in the service gallery M. Brugger, A. Ferrari, L.Sarchiapone, 28.11.07, FLUKA 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

Possible solutions leave electronics in place, add shielding Required reduction factor: ~104 Typical shielding: ~1.6m Fe + ~1m concrete but hermetic! 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

Possible solutions... 2) use existing tunnel (TSG40) to house all the electronics TSG40 is foreseen as garage to store broken horn/reflector/target during the lifetime of the facility. Alternative storage areas must be found in that case.... 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

CNGS 07 Commissioning Week 38-40 MD (+strip-line cable) First brick event # pot/extr. 1.84 E13 pot/extr. 2 Oct. 07: 1.84E13 pot (max. 2006: 1.77E13 pot) With reference setting:  increasing intensity Setting-up of secondary beam: Alignment beam vs. target vs. horn Calibration of TBID Study behavior for neutrinos/antineutrinos Setting up of SC Interlock tests horn/reflector test 24 hr run MD (+strip-line cable) 2 E12 pot/extr. Time 21 Sept 07 28 Sept 07 1 Oct 07 Total: ~5E16 pot 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

CNGS Physics Run 2007 Total: 7.9 E17 pot 6.3E17 pot 8.4E16 pot First brick event 2 E13 pot/extr. 7.2E16 pot Loss of ventilation control  Stop beam Modifications in ventilation control 5 Oct 07 12 Oct 07 19 Oct 07 6th LHC Radiation Workshop, 29 November 2007 Stop CNGS: non-standard mode of operation (access) not possible in an INB controlled facility E. Gschwendtner, AB/ATB

On-line Muon Profiles after Optimizations 2 x 1.4E13pot/extr. Horizontal, pit1 Horizontal, pit2 Pit 1: sensitive to target vs horn alignment Pit 2: sensitive to beam vs target alignment Vertical, pit1 Vertical, pit2 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB

Radiological Issues Beam on: Access is controlled < 100Sv/h outside the horn shielding < 2Sv/h in service gallery Beam off immediately afterwards 100mSv/h For intervention: dose rate < 2mSv/intervention (CERN rule) Examples: 1 week shutdown to change a motor of the target 1 month shutdown to exchange the horn Only possible because most is remotely handled! Access is controlled with ‘radiation veto’! 6th LHC Radiation Workshop, 29 November 2007 E. Gschwendtner, AB/ATB