Current Site Status at IP Preliminary survey of campus

Slides:



Advertisements
Similar presentations
Kitakami IR Access Discussions T. Markiewicz/SLAC 13 May 2014 SiD Meeting / AWLC Fermilab.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Cairo University Faculty of Engineering Petrochemicals Engineering Plant Layout May 2010.
Manpower and space requirements for ILD 2015/1/13 Y. meeting at SLAC 1.
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Thanks to all the presenters who made this an excellent meeting 1 Meeting Summary CFS-ADI Tokyo 2014 Mike Harrison.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Experimental hall in Japanese mountain site Y. Sugimoto 1.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
MEIC Collaboration Meeting Site Development - Rebecca YaskyOctober 6, 2015.
More than an idea not yet a project 1 Meeting Issues & Goals CFS-ADI Tokyo 2014 Mike Harrison.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
ILD Magnet & calorimeters integration meeting Questions to be addressed 01-02
ILD requirement for assembly space and time 2015/11/3 Yasuhiro 1.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
Ideas on TPC Assembly Volker Prahl, Thomas Schörner-Sadenius Paris, 8/9 October /9 October 2015TSS: TPC Assembly1.
Kitakami Side AHCAL Assembly or anywhere in any detector.
Access Hall Study for Cryogenics High Energy Accelerator Research Organization KEK- LC Project Office Masanobu Miyahara 2 Nov
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
ILC Utility Design Study for Kitakami-site
Environmental protection
Experimental Hall in Mountain Regions
Cryoplant Controls Installation
ENVIRONMENTAL PROTECTION External EHS Expert Panel Workshop
2016/9/30 Yasuhiro Infra/CFS mini-ws
CBETA Technical Review
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Updated Design of Detector Hall
Introduction and Meeting Objectives
Detector Utility/Service Cavern
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
ILCTown planning/Campus
Rob Conley City of Hamilton
Experimental hall design in Japanese site
Part II: Integrated Design of Infrastructures
Update of experimental hall in Japanese mountain site
Detector Service Cavern for ILC
Detector hall in mountain regions
Status of Cryogenics Facilities Design
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
Sub-Detector Assembly Area Summary of discussion at ALCW2015
ILD-0 overall dimensions C.Clerc ILD meeting, Seoul 17/02/09
CHAPTER 17 On-Site Services รศ.ดร.เสรี วงษ์มณฑา
An integrated design for ILC detectors services
Detector hall in mountain regions
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Scope, Requirements Deliverables & Schedule
8-10 April 2014 CFS-ADI Joint Meeting
Overview of Day One – 29 Feb 2016
Multi-Family Fourplex Apartment
On-Site Facilities for Pre-production deployment
JLEIC Accelerator R&D Meeting
Stoke Medical Centre RIBA Plan.
RIBA Plan Tom Robinson sir david Swindells Vii
Presentation transcript:

Current Site Status at IP Preliminary survey of campus Tokiko ONUKI (Tohoku U., Campus designer) Akira YAMAMOTO (KEK), Masanobu MIYAHARA (KEK), Tomoyuki SANUKI (Tohoku U.)

By Masanobu

IP Campus Facilities Facilities area(m2) notes Assembly Hall 4,887 Integrated Service building utility plant area 1,600 40×40m (40×100m) UT shaft & entrancehall 1,200 40×30m cryogenic plant electric facility 400 20×20m Emergency Generator Cooling Towers 20units Cooling Towers for CGP 5units He Gas tanks 1,600m3 ILD pre-assembling 4,000? NET SiD pre-assembling Same as ILD, NET building for Accelerator ? Research building Parking

IP Campus requirements-ILD (as of Oct . 2015) IP campus requirements from the slide presented at the ILD topical integration meeting held at LAL in the last October. sub detector room area(m2) Yoke Strage 1300 250t crane subtotal AHCAL load area 32 2 x 20t crane covering10m x 20m air conditioner test area 48 cooling water (16deg., sbar, 50L/min) strage area 120 4x (3phase 400V 32A) workshop 5x10m direct connection with test area 50 office 20m2 x4                  80 200 130 DHCAL assembly, GRPC 1200 storage 1400 ECAL barrel strage 160 15t crane test 40 assembly strage/test 520 endcap 80 50 180 310 TPC 100 clean room VTX/FTD ? total 3830 +VTX/FTD+130=3960+VTX/FTD ※+ restspace, WC, etc

IP Campus requirements-ILD

“New” candidate IP campus Topography (flat area), land use (house), ...,  9.4ha (94,000m2) is a good working assumption

IP Campus - Schedule(draft ; under consideration) Pre Preparatory Phase Preparatory Phase Construction Phase 1 2 3 4 5 6 7 8 9 10 11 legal procedures environmental assessment site acquisition arrangement site development building construction surrounding infrastructure (outside of campus) by local Pre study Urban Planning(development permission), Agricultural Land Act, Forest Act… by local 4years there is some possibility to cut environmental assessment Research & Conservation Plan Pre survey Post-project survey (depends on the development) by local Land survey & arrangement by local Pre study Basic & Detail design Development(depends on the site condition) Pre study Basic design Detail design start from the usable place Construction A.H(23month) ★experimental group work will start Pre study Basic & Detail design by local Development(depends on the site condition) ※all include the contract procedure ※A.H. schedule is from change request NO.ILC-CR-000R

+ necessary information facility requirements - SiD, in addition to ILD facilities for collider (cooling tower,…) critical size (width x depth x height) layout (gather & share the same function) other necessary equipment site volume (considering future expansion) Schedule (when do you need these facilities?)