Annual Report of the DWP Experiment 9th CAA Operations Review S. N. Walker, K. H. Yearby, and M. Balikhin ACSE, University of Sheffield
CAA 9th Operations Review, ESAC Introduction The DWP team provides the following data sets Science Cx_CP_DWP_CORR_FX Cx_CP_DWP_CORR_ST Time enhancement Cx_CP_DWP_TCOR WEC Operations Cx_CP_DWP_LOG CM_CD_DWP_UT_PIOR Caveats June 4th, 2014 CAA 9th Operations Review, ESAC
CAA 9th Operations Review, ESAC Introduction Summary of Activities During the past 12 months the DWP PI team has continued to process, validate, and deliver data products to CAA. The delivery of data has proceeded almost to schedule. CORR datasets slightly behind availability of FGM 5VPS and AUX data. These are now available until March/February 2014. Production of remaining CORR datasets for 2013 should by completed by end August as in proposed schedule. Reprocessing of CORR data sets due to FGM updates. June 4th, 2014 CAA 9th Operations Review, ESAC
CAA 9th Operations Review, ESAC Management Michael Balikhin is PI of the Cluster DWP instrument. Keith Yearby (Operations 100%) Simon Walker (CAA 40%) Michael Balikhin DWP PI Keith Yearby TCOR Double Star Simon Walker CORR, LOG, PIOR UG, ICD, CR June 4th, 2014 CAA 9th Operations Review, ESAC
Status of Software Development All software required to generate the current set of DWP datasets already exists. These applications have been running for several years. Following the problems with our UNIX RAID system production is now being ported to new MAC platform. LOG, COR completed, caveats partly complete UT_PIOR relies on commanding data – still Unix based CORR is still based on Linux hardware June 4th, 2014 CAA 9th Operations Review, ESAC
Calibration/Cross-calibration DWP data sets do not require any in orbit calibrations. DWP does not take part in any cross calibration activities. June 4th, 2014 CAA 9th Operations Review, ESAC
Dataset Delivery Status June 4th, 2014 CAA 9th Operations Review, ESAC
CAA 9th Operations Review, ESAC Data Delivery Plan Year 2001…2011 12 13 14 CORR1 D 08/14 08/15 CORR_PLOT1 TCOR 03/15 DWP_LOG2 UT_PIOR2 1 Requires FGM 5VPS and AUX data sets. Currently delivered up to end March, February 2014 respectively 2 Delivered up to end April 2014 June 4th, 2014 CAA 9th Operations Review, ESAC
CAA 9th Operations Review, ESAC Documentation No changes have been made to the UG, CR, and ICD since last OR. (PM later this month) June 4th, 2014 CAA 9th Operations Review, ESAC
CAA 9th Operations Review, ESAC Documentation Other documents GI paper Enhanced timing accuracy for Cluster data by Yearby et al has been published. Geosci. Instrum. Method. Data Syst., 2, 323–328, 2013 DWP_TCOR Documents describing the yearly production, validation and caveats for the TCOR data sets are available from CAA June 4th, 2014 CAA 9th Operations Review, ESAC
Recommendations from OR8 OR8-R13 The board recommends that instrument teams ensure that all ancillary datasets are fully described in their ICDs. DWP Response All DWP datasets are fully described in the ICD. OR8-R14 All instrument teams should ensure that their user guides contain a detailed description and time-line of instrument operations and failures. Most of this information is already contained within the UG. OR8-R15 The board recommends that all teams investigate data quality at mode changes and instrument switch-on or switch-off. We are currently looking into this aspect of operations. June 4th, 2014 CAA 9th Operations Review, ESAC
CAA 9th Operations Review, ESAC Action Items CC18-AI-13 to use a file listing flag in command line to get a listing of active files on the CAA DWP response DWP already checks for the availability of new FGM 5VPS and AUX files as they are required for production of the CORR data sets. CC19-AI-01 check that the headers are complete and correct. This concerns particularly various descriptions in different levels (experiment, instrument, dataset). The experiment/instrument/data set descriptions in the header files have been updated. CC19-AI-04 to reprocess the pitch-angle products for the reprocessed FGM dates (for list, see slide 7 of annex 7). All data periods have now been reprocessed and delivered to CAA June 4th, 2014 CAA 9th Operations Review, ESAC
CAA 9th Operations Review, ESAC Action Items CC19-AI-17 to deliver the annual report and ICD on the Double Star datasets for the OR-9 review. DWP response Done. CC19-AI-18 to deliver the Double Star datasets of 2004-8 to the CAA. The summary plots from LPP are ready for delivery. Pipeline for power spectra data is in place. Code for correlator products is being ported and test on MAC. June 4th, 2014 CAA 9th Operations Review, ESAC
CAA 9th Operations Review, ESAC Open Issues There are currently no major open issues with the production of the DWP data sets. June 4th, 2014 CAA 9th Operations Review, ESAC