Annual Report of the DWP Experiment 9th CAA Operations Review

Slides:



Advertisements
Similar presentations
CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,
Advertisements

FGM report 10 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Chris Carr, Tim Oddy, André Balogh I mperial College London November 2009.
FGM report 9 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Paul French, Chris Carr, Tim Oddy, André Balogh I mperial College London March.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
11 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 STAFF CAA products & Cross-Calibration activities Patrick ROBERT & STAFF Team 5) STAFF-SC CWF.
SSC SI Data Processing Pipeline Plans Tom Stephens USRA Information Systems Development Manager SSSC Meeting – Sept 29, 2009.
CAA 12th Cross-cal meeting Toulouse Oct STAFF status report N. Cornilleau-Wehrlin,P. Robert, V. Bouzid, and STAFF team.
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
CLUSTER/STAFF DATA at CAA. 11th Cross-Calibration Meeting, 7-9th April 2010, Goslar. C. Burlaud, P. Robert, O. Santolik, N. Cornilleau-Werhlin, P. Canu,
STAFF Report Patrick Robert, Rodrigue Piberne & STAFF team.
1 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 STAFF CAA products & Cross-Calibration activities Patrick ROBERT & STAFF Team 5) STAFF-SC CWF.
WFC3 PIPELINE CDR Jim Rose October 16, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 13 Science Data Processing
STAFF Report Prepared by R. PIBERNE. 2 1.Status of software development 2.Status of Experiment Calibration / Cross Calibration 3.Status of dataset delivery.
WHISPER action items Gábor Facskó, Jean-Gabriel Trotignon,Séna Kougblénou, Xavier Vallières, Guillaume Lointier LPC 2 E/CNRS, Orléans, France 10th CAA.
CAA PEACE Status Iryna Rozum, Andrew Fazakerley, Natasha Doss, Andrew Lahiff, Yulia Bogdanova, Branislav Mihaljčić & the PEACE ops team MSSL 12 th Cross-Calibration.
1 CAA 2009 Peer Review, Jesus College, Cambridge, UK, March CAA Peer Review: Selected Recommendations.
DAA PEACE Status A. Fazakerley, B. Mihaljčić, I. Rozum, A. Lahiff, G. Watson, D. Kataria UCL Department of Space and Climate Physics Mullard Space Science.
CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu EDI Status of Calibration and Archiving Activities.
CAA PEACE Status Andrew Fazakerley, Natasha Doss, Branislav Mihaljčić, Chandrasekhar and Gill Watson MSSL 20 th Cross Calibration Workshop, Gottingen,
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
Cluster Active Archive Status of DWP Activities Simon Walker, Keith Yearby, Hugo Alleyne ACSE, University of Sheffield.
FGM Report: Extended Mode Processing 22 nd Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox, Cary Colgan (summer.
Double Star Active Archive - STAFF-DWP Data errors and reprocessing Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin LPP.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
10th CrossCal Workshop, L'Observatoire de Paris, France Cluster Active Archive Status of DWP Action Items Simon Walker, Keith Yearby, Hugo Alleyne ACSE,
FGM report 5 th Operations Review of the CAA Elizabeth Lucek, Patrick Brown Chris Carr, Tim Oddy, André Balogh I mperial College London June 9 th 2010.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
20th CAA Cross Calibration Göttingen - October 15-16, 2014 Status of CIS Data Archival I. Dandouras, A. Barthe.
FGM Report 17 th Cross Calibration Workshop Chris Carr, Elizabeth Lucek, Patrick Brown, Leah-Nani Alconcel, Barry Whiteside, Tim Oddy, Peter Fox, André.
CAA PEACE Status Natasha Doss, Andrew Fazakerley, Branislav Mihaljčić and Gill Watson MSSL 18 th Cross Calibration Workshop, Abingdon, UK, October.
Double Star Active Archive - DWP/STAFF 1 Double Star Active Archive STAFF/DWP Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin.
1 11 th CAA Cross-Calibration Workshop, Hotel die Tanne, Goslar, Germany 7-9 April 2010 CAA 11 th Cross-Calibration Workshop Hotel die Tanne, Goslar, Germany.
Laboratoire de Physique des Plasmas 20 TH CAA CROSS-CAL M EETING CLUSTER-STAFF REPORT O CTOBER 2014 G ÖTTINGEN The STAFF Team Laboratoire de Physique.
WHISPER report whisper team 16th CAA Cross-Calibration workshop Toulouse, France, 7-8 November 2012 CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE Laboratoire.
MSSL * A.N. Fazakerley, I. Rozum, N. Doss, B. Mihaljcic & the PEACE ops team PEACE CAA Action Items Status 11 th CAA Cross Calibration Meeting, 7 – 9 April.
CAA PEACE Status PEACE Operations Team Presented by Iryna Rozum MSSL Cross-Calibration Meeting, Uppsala, Sweden, April 2011.
1 CAA 20 th Cross Calibration Meeting, MPS, Gottingen 16th Oct 2014 CAA Cross Cal Meeting Oct 2014 Pipeline Automation Chris Perry.
WEC meeting TED status and WEC timing.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
DAA Status/Progress B. Mihaljčić, A. Fazakerley, N. Doss, G. Watson UCL Department of Space and Climate Physics Mullard Space Science Laboratory 18 th.
21st CAA Cross Calibration Workshop Leiden, March 2015 WHISPER report WHISPER team LPC2E/CNRS.
21 th CAA Cross-Calibration Workshop Leiden, Netherlands24-26 March Introduction.
FGM Report 21 st Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox Imperial College London 24 March 2015.
14 th CAA Cross-calibration Workshop CIS archiving activities York October 5-7, 2011.
Double Star Active Archive - STAFF- DWP 1 K.H. Yearby, S.N. Walker, M. Balikhin University of Sheffield.
Cluster Active Archive
CAA Operational Review 9 Double Star PEACE Team Report
Status Report of EDI on the CAA
CIS Data Archival Status
ASPOC Presentation for the CAA Operations Review-1 Klaus Torkar and Harald Jeszenszky IWF/OAW Graz ESTEC, May 2006.
16th CAA Cross-calibration Workshop
CIS Data Archival Status
10th CAA Operations Review Annual Report of the CIS Experiment
Cluster Active Archive – Wideband data BM2 mode
1. Introduction: general information
CSA Implementation overview since OR-8 Test campaigns Scheduled development plan Arnaud Masson CSA/CAA Operational Review 9 ESTEC, 04-June-2014.
20th CAA/DAA Cross Calibration Meeting
EDI – CAA STATUS REPORT EDI CAA Status
CAA-OR (End of Phase 1) CAA DWP Operations Review
H. Rème, I.Dandouras and A. Barthe IRAP, Toulouse, France
GLAST Large Area Telescope:
Cluster Active Archive 1st Operations Review May 16-17, 2006
Jolene S. Pickett, Joanne M. Seeberger, Ivar W
Natasha Doss, Andrew Fazakerley, Branislav Mihaljčić and Gill Watson
CAA Action Items Investigations PEACE Progress Meeting
Annual Report of the FGM Experiment for the 8th Operations Review of the Cluster Active Archive (CAA) Chris Carr, Leah-Nani Alconcel, Patrick Brown,
10th CAA Operations Review Annual Report of the FGM Experiment
SPACE LINK AREA MID-TERM REPORT
Lunar Calibration Workshop Status of the preparation
Presentation transcript:

Annual Report of the DWP Experiment 9th CAA Operations Review S. N. Walker, K. H. Yearby, and M. Balikhin ACSE, University of Sheffield

CAA 9th Operations Review, ESAC Introduction The DWP team provides the following data sets Science Cx_CP_DWP_CORR_FX Cx_CP_DWP_CORR_ST Time enhancement Cx_CP_DWP_TCOR WEC Operations Cx_CP_DWP_LOG CM_CD_DWP_UT_PIOR Caveats June 4th, 2014 CAA 9th Operations Review, ESAC

CAA 9th Operations Review, ESAC Introduction Summary of Activities During the past 12 months the DWP PI team has continued to process, validate, and deliver data products to CAA. The delivery of data has proceeded almost to schedule. CORR datasets slightly behind availability of FGM 5VPS and AUX data. These are now available until March/February 2014. Production of remaining CORR datasets for 2013 should by completed by end August as in proposed schedule. Reprocessing of CORR data sets due to FGM updates. June 4th, 2014 CAA 9th Operations Review, ESAC

CAA 9th Operations Review, ESAC Management Michael Balikhin is PI of the Cluster DWP instrument. Keith Yearby (Operations 100%) Simon Walker (CAA 40%) Michael Balikhin DWP PI Keith Yearby TCOR Double Star Simon Walker CORR, LOG, PIOR UG, ICD, CR June 4th, 2014 CAA 9th Operations Review, ESAC

Status of Software Development All software required to generate the current set of DWP datasets already exists. These applications have been running for several years. Following the problems with our UNIX RAID system production is now being ported to new MAC platform. LOG, COR completed, caveats partly complete UT_PIOR relies on commanding data – still Unix based CORR is still based on Linux hardware June 4th, 2014 CAA 9th Operations Review, ESAC

Calibration/Cross-calibration DWP data sets do not require any in orbit calibrations. DWP does not take part in any cross calibration activities. June 4th, 2014 CAA 9th Operations Review, ESAC

Dataset Delivery Status June 4th, 2014 CAA 9th Operations Review, ESAC

CAA 9th Operations Review, ESAC Data Delivery Plan Year 2001…2011 12 13 14 CORR1 D 08/14 08/15 CORR_PLOT1 TCOR 03/15 DWP_LOG2 UT_PIOR2 1 Requires FGM 5VPS and AUX data sets. Currently delivered up to end March, February 2014 respectively 2 Delivered up to end April 2014 June 4th, 2014 CAA 9th Operations Review, ESAC

CAA 9th Operations Review, ESAC Documentation No changes have been made to the UG, CR, and ICD since last OR. (PM later this month) June 4th, 2014 CAA 9th Operations Review, ESAC

CAA 9th Operations Review, ESAC Documentation Other documents GI paper Enhanced timing accuracy for Cluster data by Yearby et al has been published. Geosci. Instrum. Method. Data Syst., 2, 323–328, 2013 DWP_TCOR Documents describing the yearly production, validation and caveats for the TCOR data sets are available from CAA June 4th, 2014 CAA 9th Operations Review, ESAC

Recommendations from OR8 OR8-R13 The board recommends that instrument teams ensure that all ancillary datasets are fully described in their ICDs. DWP Response All DWP datasets are fully described in the ICD. OR8-R14 All instrument teams should ensure that their user guides contain a detailed description and time-line of instrument operations and failures. Most of this information is already contained within the UG. OR8-R15 The board recommends that all teams investigate data quality at mode changes and instrument switch-on or switch-off. We are currently looking into this aspect of operations. June 4th, 2014 CAA 9th Operations Review, ESAC

CAA 9th Operations Review, ESAC Action Items CC18-AI-13 to use a file listing flag in command line to get a listing of active files on the CAA DWP response DWP already checks for the availability of new FGM 5VPS and AUX files as they are required for production of the CORR data sets.   CC19-AI-01 check that the headers are complete and correct. This concerns particularly various descriptions in different levels (experiment, instrument, dataset). The experiment/instrument/data set descriptions in the header files have been updated. CC19-AI-04 to reprocess the pitch-angle products for the reprocessed FGM dates (for list, see slide 7 of annex 7). All data periods have now been reprocessed and delivered to CAA  June 4th, 2014 CAA 9th Operations Review, ESAC

CAA 9th Operations Review, ESAC Action Items CC19-AI-17 to deliver the annual report and ICD on the Double Star datasets for the OR-9 review. DWP response Done.   CC19-AI-18 to deliver the Double Star datasets of 2004-8 to the CAA. The summary plots from LPP are ready for delivery. Pipeline for power spectra data is in place. Code for correlator products is being ported and test on MAC. June 4th, 2014 CAA 9th Operations Review, ESAC

CAA 9th Operations Review, ESAC Open Issues There are currently no major open issues with the production of the DWP data sets. June 4th, 2014 CAA 9th Operations Review, ESAC