EC Activities Status for the LIU

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
ABT Consolidation Review Electronics & Controls Etienne Carlier
Kicker generator and controls installation in ECA5? Etienne CARLIER
Replacement of Obsolete/Old Hardware L. Ducimetière SPS Consolidation Review Luc Sermeus, Mike Barnes, Viliam Senaj, Thomas Kramer, Luis Feliciano, Vasco.
Electronics issues for MTE Etienne CARLIER TE/ABT Outline: o CAMAC eradication o PPM limitations o Electronics & Controls for MTE only CT only CT-MTE hybrid.
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
Planned activities during (E)YETS… up to LS2 for PSB-PS equipment Etienne CARLIER On behalf of TE/ABT/EC.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
Mar 26, 2014 FGClite Power Control TE-EPC-CCE.
LIU-SPS Project baseline, objectives and reviews for 2016 B.Goddard 20/01/16.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
Electrial Safety LS2 days November 2016 AP
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
V4.
Linac4-PSB 160 MeV connection readiness review
ABT-EC EYETS Activities 2nd reports
Outcome of BI.DIS Fast Interlocks Peer Review
PS / Booster septa control
LIU – EVM status and next steps
Update on the Critical Path of the PS Booster Schedule for the EYETS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
BE-ICS Activities during the LS2 Period (15 min)
Brief Status SPS Prototype PSB Prototype Installed in LS1
LIU Wire Scanner Milestones June 2017
Injector De-cabling Project
EC Activities Status for LIU September 2017
LIU – EVM status and next steps
Injectors BLM system: PS Ring installation at EYETS
LIU–PLI report LIU PSB meeting.
LINAC4 50 MeV phase BIS STATUS
Future Kicker Generator strategy
MKD/MKB Review Meeting Scope and Definition
LIU–PLI report LIU SPS meeting.
Power converters for 2GeV injection
YETS & LS2 Reminder G. Girardot 20 juin 2017.
prepared by R.A.Barlow 13/09/2016
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
TE-ABT Activities for LS2
Status of the BI Work Package in the LIU-PSB frame
prepared by R.A.Barlow 30/056/2016
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
J. Uythoven for the MPE-MI & MS Teams
WPs concerned by L4 connection:
SPS activities during LS2 TE-EPC (Power Converter Group)
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
LIU and TE/ABT/PPE activities
Status with crucial LSS5 kicker transmission line cables
BE-CO Activities for PSB
East Hall under construction
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
GIS Portal Racks Project
1v1.
Experimental Areas – LS2 planning
LIU-SPS review for BI (no BWS)
East Hall under construction
Status of the BI Work Package in the LIU-PSB frame
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

EC Activities Status for the LIU Alain Antoine, Roger Barlow, Etienne Carlier, Christophe Chanavat, Thierry Gharsa, Gregor Gräwer, Pieter Van Trappen 08-08-2016 LIU and TE/ABT activities

L4 – Electronics & Controls for Pre-chopper Thierry Gharsa Status Comment Specification Test procedure for connection to BIS to be produced Design / Architecture Power electronics One spare available in L4 test bench. Second spare to be produced. Control electronics Fast controls Prototype / Pre-series Production Infrastructure Electrical distribution to be consolidated (prototype PDC actually deployed not fully compliant with latest safety norms) Budget Operational cost not yet included in PS-Complex exploitation budget Integration (CCC)

PSB - Electronics & Controls for BI.DIS PLAN 10275 Roger Barlow Status Comment Specifications / Timeline Final specification for connection to BIS still missing Detailed planning for installation and commissioning missing Design / Architecture Prototype / Pre-series Power electronics Slow controls Fast controls On critical path. Higher complexity than expected. Combination of equipment and operational requests not obvious. Production External production ongoing for slow controls ongoing. Fast control to be launched ( mainly based on off-the-shelve components). Infrastructure Requirements sent to EN-EL & BE-CO. Waiting for final validation. First estimation of cabling cost higher than expected (~50%). Budget Last re-baseline 08/2016. CtC increased by 50 kCHF. To be re-baselined if extra cabling cost confirmed. Spare production shifted to 2007. Integration (CCC) API and FESA classes not yet defined. Integration in BE-OP environment still to be done.

PSB – Electronics & Controls for Strip-foils PLAN 10371 Pieter Van Trappen Status Comment Specifications / Timeline Final specification for connection to BIS still missing Detailed planning for installation and commissioning missing Design / Architecture Power electronics Slow controls Fast controls Prototype / Pre-series No full re-validation of membrane potentiometer after irradiation test possible up to now due to availability of loaders. Production External production planned for 10/2016. Validation of pre-series unit ongoing in HST and L4T Infrastructure Requirements sent to EN-EL & BE-CO. Ready for execution. Budget Latest re-baseline 08/2016. CtC reduced by 46 kCHF Spare production shifted to 2017 Integration (CCC) API defined. First version of FESA class released. Integration in BE-OP environment still to be done

PSB – Electronics & Controls for BI.KSW PLAN 10274 Gregor Gräwer Status Comment Specification / timeline Final specification for connection to BIS still missing Detailed planning for installation and commissioning missing Design / Architecture Power electronics All sub-systems individually tested. Long term stability and reliability tests still to be done. Slow controls Test ongoing. Fast controls Signal analysis still to be implemented. Waveform parameters calculation and calibration still to be done. Prototype / Pre-series High current prototype waveforms validated (90%). Low current prototype validation just started. No issue identified up to now. Production External production ongoing. High current generator in 10/2016, low current generator in 11/2017 Infrastructure Requirements sent to EN-EL & BE-CO. Ready for execution. Budget Latest re-baseline 08/2016 Spare production shifted to 2017 Integration (CCC) Definition of API started. FESA class still to be done. Integration in BE-OP environment still to be done.

PSB – BI.BSW Electronics & Controls PLAN 10273 Christophe Chanavat Status Comment Specification / timeline Detailed planning for installation and commissioning missing. Design / Architecture Connection to power converter through WIC to be validated. Power electronics Slow controls Test ongoing. Fast controls Prototype / Pre-series Will be tested in HST. Production External production planned for 11/2016. Infrastructure Requirements sent to EN-EL & BE-CO. Ready for execution. Budget Latest re-baseline 08/2016. CtC reduced by 20 kCHF. Spare production shifted to 2017. Integration (CCC) API defined. First version of FESA class released. Integration in BE-OP environment still to be done.

PS – Electronics & Controls for PI.KFA45 PLAN 10752 Alain Antoine Status Comment Specification / Timeline Functional specification missing (operational mode). Reengineering started. Roadmap up to end of LS2 missing. Design / Architecture AD approach will be reused. Some components to be consolidated. Power electronics 300V / 10A power supplies. DO in preparation. Consolidation of power trigger unit (CONS). Slow controls No concern. Will be based on well known technologies. Consolidation of primary capacitor bank (CONS). Fast controls Consolidation thyratron protection. FIDS solution will be used (CONS). Prototype / Pre-series Performance validation strategy in B867 to be defined. Production Not yet started. No major concerns. All components already used in others systems. Infrastructure Not yet started. Budget To be precisely re-baselined after engineering specification. Integration (CCC)

SPS – Electronics & Controls for SBDS PLAN 10625 Pieter Van Trappen Status Comment Specification / Timeline Draft version of functional specification. Clear strategy for consolidation / upgrade of electronics and controls up to LS2 available. Staged approach. Design / Architecture New control architecture to be approved by SIWG (removal of flat-bottom dump). Ongoing. Power electronics Power Trigger Unit for MKDV solid state switches 12kV / 500mA MKDH power supplies. DO in preparation. Slow controls Consolidated during LS1. MKDV solid state switches surveillance to be implemented. Fast controls Will be upgraded during YETS17-18 (Timing) New fast interlock system (CONS). Beta-deployment during EYETS16-17. Prototype / Pre-series Test of Power Trigger Unit prototype (Q3/2016). Global system performance assessment before launching production. Production Not yet started (Power Trigger Unit). Not a concern (small series). Infrastructure Ongoing (EN-EL, BE-CO, TE-MPE…). Budget To be re-baselined after engineering specification. Integration (CCC) Migration FESA2.x  FESA3.x scheduled for YETS17-18. Extension of IPOC/OASIS to be specified.

SPS – Electronics & Controls for ZS Ion Traps PLAN 10631 Roger Barlow Status Comment Specification / Timeline Design / Architecture Power electronics Slow controls Fast controls Design of new ZS ion traps (prototype) finalised. Production engineering to be done. Some irradiation tests of critical components still to be planned. Prototype / Pre-series Test with beam on ZS6 still to be done for full validation. Production Not yet started. Waiting for validation of prototype with beam. Infrastructure Not yet started. Budget To be re-baselined after test with beam. Integration (CCC)

Summary On track for LS2… or earlier for LIU-PSB Major concerns LIU-L4 “Consolidation” of some units (prototypes / pre-series) still to done LIU-PSB Connection strategy of equipment to BIS to be finalised Missing detailed planning if L4 connection to PSB done before LS2 (beam stop to beam start) as possible from beginning of next year Integration within BE-CO infrastructure for operation from CCC to be finalised LIU-PS Missing detailed functional specification for KFA45 (operational modes) KFA45 performance validation strategy in B867 to be decided LIU-SPS SBDS infrastructure requirements (EN-EL, SMB…) to be finalised Performance with beam still to be validated for ZS ion traps before going ahead Global detailed LS2 planning missing (LIU + CONS + Maintenance) Re-commissioning strategy Requested support from others groups a priori validated in PLAN