Roger Wendell for the OD group

Slides:



Advertisements
Similar presentations
EMC Status Report: November 2003 Roger Barlow Events since last report (25 th Sept.) –The ROD Current status –Electronics –Neutron Generator –Light Pulser.
Advertisements

SOCIETY OF MOTOR MANUFACTURERS AND TRADERS LIMITED SMMT, the S symbol and the Driving the motor industry brandline are trademarks of SMMT Ltd DEALER ENERGY.
ClearCube Blade Manager 4.0 Overview and Demonstration Rev
Daikin Altherma™ Troubling Shooting
January 6. January 7 January 8 January 9 January 10.
38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
Technical Explanation Alumina Substrate Heater Resistor on Back Side Two Isolated Conductors Covered with Indium Tin Oxide Thin Film on Front Side Resistor.
 Description of PressurePro System  Identify system components  Display and Operational Modes  Sensor alerts  Checking of tire pressures  Manual.
In this presentation you will:
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
1 Engine Protector Safe Rider Vehicle Technologies (Pty) Ltd PO Box 11376, Rynfield South Africa Tel./ fax Cell:
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
Climate Monitoring WEB Interface Using 1_Wire™ Sensors Imad Hoteit Hassan Wehbe.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
Vegard Joa Moseng BI - BL Student meeting Reliability analysis summary for the BLEDP.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Data Center & IT Monitoring Use Cases Regional Seminar Series Carolyn.
AccuMax Multi-Point Injection Mechanics
Take 5 for Safety E. Lessard April 14, Power Disturbance on Sixteen 3-Phase Motors Failed due to “Single Phasing” 2 Arrow pointing to.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
What we can resolve and Our experience in the field of industrial solutions.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Ion Source Update. We now have 2 running sources Source B has been running since the first part of June Both sources have been modified extensively since.
1 RMS Update - ERCOT June 10, Supporting Reports Section.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
Progress in UCSD Chamber Simulation Experiments – Initial Results from Fast Thermometer Farrokh Najmabadi Sophia Chen, Andres Gaeris, John Pulsifer HAPL.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
IMAC 2007BEPCII Timing System Status1 Event timing system for BEPCII storage ring commissioning Presented by G. Lei May 2007.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
03/30/2009F.G. Garcia Linac Group Meeting – March 30, 2009 Agenda: 1) Linac week’s performance 2) Ongoing projects – Status report 3) AOB.
MCast Errors and HV Adjustments Multicast Errors (seen on the DATA ERIS connection) have caused a disruption of a HV Adjustment due to a timeout (since.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
1 Customer Objections in Complete Status (CCO Clean-up Phase 3) Background Next Steps.
Electricity and Electronic Engines Engine Management Systems and Refrigeration.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
HDD-2425/VF HDD- 2425/VFT COLOR DOME CAMERA USER’S MANUAL FEATURES MEMO 1/3” SONY 960H Super HAD CCD ll High Resolution of 700TV Lines Min. Illumination.
Development of new DAQ system at Super-Kamiokande for nearby supernova A.Orii T. Tomura, K. Okumura, M. Shiozawa, M. Nakahata, S. Nakayama, Y. Hayato for.
SANE Magnet Review ● Repaired polarized target magnet was successfully energized and put in persistent mode on 12/18/08 after the review, following the.
OD Tuning: SK-IV Roger Wendell TMC Meeting
TIRE PRESSURE MONITORING SYSTEMS
PIXEL CAEN Installation Status
BaBar Transition: Computing/Monitoring
US TileCal Meeting at UT Arlington
LKr status R. Fantechi.
LAV front-end and readout status
The High Voltage problem
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
2012 Technical Service Advisor’s Meeting
Self Diagnosis and Trouble Codes
RICH Status from last RICH meeting
Project Manager’s Report + DC/MoM Report
Online Database Status
Run period of summer 2012 Zoltán Fodor
DT Infrastructure: LV, HV, Gas
LPI Moscow, K. Zhukov, MEPhI-LPI Moscow, V. Kantserov
K. Grogg, M. Weinberg, M. Grothe
Symptoms of a Faulty Cylinder Head Temperature Sensor.
Basic Guidelines for Tachometer Troubleshooting.
4 Causes of Damaged or Failed Speedometer in the Car
Status of the Crystal Ball
The key to comfort and efficiency for heating and air-conditioning
RV Safety Alarms Education Test LP Gas Alarms / Detectors
Customer Service Workbook #3
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Roger Wendell for the OD group OD Status Roger Wendell for the OD group TMC Meeting 20090423 Status of OD Electronics

OD Tuning: SK-IV OD Light Leak : Roger Wendell TMC Meeting 20090423 Trigger spikes occurred during first shift only (mercury lamps) On March 17th first shift noticed changes in the OD trigger rate that had been present since ~ March 9th Caused by a loose covering on one a calibration portal behind hut 1 Covered during first shift March 18th Problem solved OD Tuning: SK-IV Roger Wendell TMC Meeting 20090423 Status of OD Tuning

OD TKO Power Supplies One OD TKO power supply that failed at the end of January and another that failed in Sept of last year were sent back to the manufacturer for repairs (see previous TMC talk) Failures were due to a manufacture's defect and has been repaired Both supplies were replaced with spares Supply was replaced with the repaired supply on April 8th Now all supplies are being monitored by SLC monitor (Spare supply was incapable of monitoring) The OD now has two complete spare power supplies in case of further disruptions Does not include loaner spare provided by Kenko ( to be returned )

TKO Crate Temperatures In early April one OD TKO crate fan was accidentally left off after the OD power supply replacement: The temperatures monitored by the QBEE on-board sensors rose and were noticed by Awai-san The fan was later switched on No damage done to the QBEEs

TKO Crate Temperatures(2) This problem made us aware that the SLC monitor was not checking the temperature data from the custom cards in each OD crate Temperature cards were installed in January and the Vortex monitor has been writing measured temperatures (and supply voltages) to the data file for the SLC monitor since that time. Hayato-san has now modified SLC to check this temperature Shifter will be alerted to potential problems when either power supply voltages or temperatures are out of range

Summary OD is now running stably with repaired TKO power supplies Two spare supplies available Light problem in early March was resolved SLC has been updated to monitor OD TKO crate temperatures