M. Sullivan SuperB XIII June 1-4, 2010 Elba, Italy

Slides:



Advertisements
Similar presentations
TASD R&D IDS-NF Mumbai. 2 Alan Bross IDS Plenary Meeting – Mumbai October 12-14, 2009 Detector R&D There are 3 components to this detector and their respective.
Advertisements

Interaction region design and construction for BEPCII C. H. Yu IHEP Feb.4, 2007.
UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Sergey Kozub Institute for High Energy Physics Protvino, Russia SIS300 meeting 19 March, 2009 Sergey.
2E34 Meeting and MCC News IR2 Vacuum Studies (Mike Sullivan) Plans for Lattice and Optics Work (Yunhai Cai)
Philippe Grenier MDI Meeting – 09 June 2006 Philippe Grenier LER Temperature measurements during the long LER coastdown (may 28-29) 1 (lot of help from.
NLC - The Next Linear Collider Project NLC IP Layout What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 1 PEP-II Overview and MMS Status Michael Sullivan SLAC National Accelerator Laboratory.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
1 M. Modena for the CLIC MDI magnet study Team (A. Aloev, P. Thonet, E. Solodko, A. Vorozhtsov) CLIC MDI Meeting,16 January 2015.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
M. Modena, A. Aloev CERN, Geneva, CH “An alternative Super-ferric design for ILC QD0” “LCWS14, 6-10 October 2014 Belgrade.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
1 Tim Michalski October 6, 2015 Engineering Issues in MEIC.
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
X LCLS SCU NbTi Prototype Schedule Version: February 12, 2015 Update 23JUN2015 X X System complete and ready for test X System complete & tested w/Hall.
SLAC Accelerator Development Program: SuperB Mike Sullivan OHEP Accelerator Development Review January 24-26, 2011.
ILC IP SR and PEP-II M. Sullivan for the ILC IR engineering workshop IRENG07 Sept 17-21, 2007.
Joint Belle SuperB Background Meeting Feb 9 – 10, 2012 SuperB SR bkgds 1 SR Backgrounds in SuperB M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni,
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova The air core magnets.
May 31, 2010Bill Wisniewski1 Mechanical Integration Issues.
Summary of Accelerator Sessions M. Biagini for the Accelerator Team SuperB XV Workshop Caltech, CA, Dec
TDR and R&D Plans J. Seeman and M. Biagini For Super-B Staff.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Mini MAC II PEP-II hardware M. Sullivan Apr 23-24, 2009Page 1 PEP-II Hardware Status M. Sullivan SLAC National Accelerator Laboratory Mini-MAC II Frascati,
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
SuperB Gen meeting Oct 5-9, 2009 IR Interface 1 IR Interface Issues M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni, P. Raimondi, et al.
M Sullivan SuperB Workshop Elba, Italy May 31 - Jun 3, 2008
M. Sullivan Apr 27, 2017 MDI meeting
Machine Detector Interface Design Updates
Dither Luminosity feedback versus Fast IP feedback
MDI Issues M. Sullivan For
M. Sullivan SuperB General Meeting Perugia, Italy June 15-20, 2009
Visit to IHEP September 2015: recommendations for CEPC
FCC-ee IR magnetic element design – an update
M. Sullivan for the SLAC SuperB Workshop Jan , 2009
M. Sullivan International Review Committee November 12-13, 2007
The Interaction Region
SuperB General Meeting XI
M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
IR Summary M. Sullivan SuperB General Meeting XII
E. Paloni, S. Bettoni, R. Pantaleo, M Biagini, et al.
Requirements for the ELENA Electron Cooler
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
The IR beam pipe M. Sullivan For
The PEP-II Interaction e+e- Factories Workshop
IR Design Update M. Sullivan For
Challenges for FCC-ee MDI mechanical design
IR Summary M. Sullivan For
Interaction Region Design Options e+e- Factories Workshop
Accelerator R&D Results from the B-factory
S.Kuroda ( KEK ) Final Focus Optics Collimeter Final Doublet
EIC Accelerator Collaboration Meeting
IR Summary M. Sullivan For
Summary of Washington DOE Review
IR Lattice with Detector Solenoid
IR Summary M. Sullivan For
J. Seeman SLAC Paris Super-B 5th Workshop May 9-11, 2007
M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
SuperB Accelerator Overview
MEIC Shifting Magnet Tim Michalski August 6, 2015.
JLEIC Engineering Status
Summary of the FCCee IR Workshop Jan 2017 at CERN
Energy Changes and the IR
Some of the Points Raised During my JLAB Visit
BDS EDR Discussion EDR Organisation? Discussion of WP distribution
Presentation transcript:

M. Sullivan SuperB XIII June 1-4, 2010 Elba, Italy MDI TDR M. Sullivan SuperB XIII June 1-4, 2010 Elba, Italy

List of MDI topics I think need to be worked on for the TDR MDI TDR topics List of MDI topics I think need to be worked on for the TDR Prototyping and designing Prototype Panofsky quad Prototype air-core quad Model fast orbit correctors Design solenoid compensation Design vibration correction scheme

IR TDR topics (2) Cryostats, magnet supports, PMs Design cryostat and cryo magnet supports Engineer fast access – cryostat supports Supporting the W shields Supporting the cryostats Access to beam line components Design the beam pipes Incoming HER Incoming LER Outgoing HER Outgoing LER Central beam pipe Model PM quads

Engineers/physicists IR vacuum 1 Engineer, 0.5 physicist, 1 designer Cryostat + plumbing SC magnet designs Cryostat and W support, rapid access 1 Engineer, 0.5 physicist, 1 designer Permanent magnets