Injection BIS – next iteration

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

BEAM PREPARATION IN INJECTORS AND BEAM CHARACTERISTICS K.Cornelis BE-OP-SPS.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
SPS RESTARTING AFTER LS1 05/03/2015 Stéphane Cettour Cavé.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
EPC Power Converters and the Linac4/PSB Beam Interlock System B. Mikulec, B. Puccio & J-L. Sanchez.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
Stéphane Gabourin on behalf of TE/MPE-EP MPP Linac4 – 9 th July 2015 BIS installation in Linac4 For 50 MeV operation.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
23/06/2011 Linac4 BCC meeting. 23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
MPP Workshop: Injection System C. Bracco on behalf of ABT Acknowledgments: STI, ABP, BI,LHC and SPS OP.
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
The TV Beam Observation system - BTV
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Overview of the Beam Interlock System
About Interlocks, Timing Systems and how to send SPS beams to the LHC
Plans for ions in the injector complex D
LINAC4 50 MeV phase BIS STATUS
SPS extraction, transfer lines, injection
BE-BI Software for LINAC4
Jan Uythoven For discussion
M.Jonker CTC MPO-WG status
Monday :00 Stable beams 9_6_6_6 13:40 Access.
LHC injection W. Bartmann, M.J. Barnes, C. Bracco, F. Burkart, E. Carlier, B. Goddard, V. Kain, R. Steerenberg, L. Stoel, F. Velotti, C. Wiesner, C. Xu.
Safe mode transmission
Summary Friday h38: Ramp down and pre-cycle.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Monday 11/07: Recovery Plenty of accesses.
CNGS Proton Beam: Introduction
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Monday 6th August & night
CNGS Primary Beam Results 2010
Yesterday Issue of injection kicker not pulsing:
Wednesday 31 October: Morning
Interlocking of CNGS (and other high intensity beams) at the SPS
LHC Injection and Dump Protection
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
Friday Morning 7:30 injection for fill 2908
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Aims for the week Recover from technical stop and precycle at 10A/s
CNGS Primary Beam Results
Machine Protection System Commissioning plans
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Interlocking of LHC experiments
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
CNGS Primary Beam Results 2011
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
The LHC Beam Interlock System
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Thursday 30th September De-bunching test
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
SPS Injection BIS - Draft requirements
Presentation transcript:

Injection BIS – next iteration

Proposed layout: Hierarchical Basic principal: Two permits: Injection permit → MKP and MDSH PS2SPS transfer permit → BHZ and SPS 2 LINAC4 chopper Leave out BQM SBF always TRUE MKP MDSH BHZ SPS 2 LINAC4 chopper SPS BIS TT10 BLM data will only arrive after the injection PS2SPS transfer BIC Injection BIC MKP state TT10 FEI TT10 BLMs, SEM grids, BTVs

Use cases of MDSH If no injection permit → MDSH needs to pulse As soon as MDSH goes above 0 A, circulating beam needs to be dumped MDSH current interlock to ring BIC (same value for all users; 0 A) Injection studies: injection kicker MKP disabled (all kicks) Beam permit TRUE Injection permit TRUE MDSH cannot pulse (otherwise no beam permit) Should only be done with low intensity. If 4 injections programmed and only 2 enabled MDSH will not pulse for the two injections that are not enabled. This is not ideal. For LHC/HiRadMat beams, that are tagged LHC/HiRadMat OK. Should we extend concept of beam on request also for fixed target beams?

MDSH Functional specification Pulse if there is no injection permit Be able to ramp up to required value for any injection on the flat bottom (degauss to be taken into account when going down again) Now only function defined for entire cycle It should only ramp if it receives injection forewarning, with a flattop for a sufficient time for injection and then degauss down again. Otherwise if injection permit is removed later on in the cycle, MDSH will ramp up and the circulating beam will be lost

BHZ Very fruitful discussion with EPC New BHZ power converter will cycle every extraction. No predefined cycle, only set value. FGC will decide how to get to that value including degauss Functional spec: Receiving one injection still on the TBSJ is acceptable after injection permit removable If the beam arrives with bad trajectory and does not end up on TBSJ, losses will not damage Asynchronous permit of BIC will be taken into account if cycling has not started yet on FGC side and the power converter will not go to the SPS value (no state change e.g. standby) Should not interrupt if already started cycle to avoid spraying beam around in TT10 Cards and details on how to get the permit into the power converter controls being discussed.

Interlock SPS 2 LINAC Needs to only cut SPS beams Needs to cut beams in the right moment and make sure that beams are produced again for next cycle in the SPS To guarantee this the PS 2 SPS transfer cannot be asynchronously transferred to the LINAC (tail clipper or chopper), but using the same approach as the Nicolas’ gadget.

Use cases 1 2 Cycle 1 Cycle 2 PS 2 SPS transfer SPS 2 LINAC4 Permit Beam out Beam out 1 2 Cycle 1 Cycle 2 Injection Ramp FT Ramp down Injection Ramp FT Ramp down PS 2 SPS transfer SPS 2 LINAC4 Permit Cycle 1 Cycle 2 Injection Ramp FT Ramp down Injection Ramp FT Ramp down Power supply trip during injection Force to TRUE at the end of injection until beam-out

Use cases 3 4 Cycle 1 Cycle 2 Beam loss during ramp Cycle 1 Cycle 2 Injection Ramp FT Ramp down Injection Ramp FT Ramp down Beam loss during ramp Cycle 1 Cycle 2 Injection Ramp FT Ramp down Injection Ramp FT Ramp down Beam loss during injection This is already implemented like this in Nicolas’ card.

Another subject: How to interlock Timing Watch dogs on user side Beam dump Main power supplies BLMs Only work if receive timings Timing input in BA3: general timing problem To be defined with Jean-Claude Diagnostics in the control room would have to be available Timing BIS input on the TT60 BIC/TT40 BIC SPS – LHC clock drifts Anything else? Removed damper from the list: needs timings to have the correct settings…but difficult to cover all use cases with timing watch dogs.