Week coordinator report - C. Marchand

Slides:



Advertisements
Similar presentations
Report ~first collision Kotaro Kijima 2010/01/25 Local lab meeting.
Advertisements

CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
M. Dracos LNGS, 03 August Target Tracker. M. Dracos LNGS, 03 August Rate tests SM1 Sensor (1,3,4) no signal Plane 6 absent Sensor (1,2,7)
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
1 SSD status report – 16 July 2004 Jerome Baudot, Strasbourg STAR Collaboration Meeting BNL, 16 July 2004 Silicon Strip Detector status report  Report.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Run Coordinator Weekly Report EG6 Commissioning October Raffaella De Vita.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Problems with Muon System N. Bondar O.Maev
The 2007 CALICE Test CERN (part II) Erika Garutti, Fabrizio Salvatore.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
Status of NA62 straw electronics Webs Covers Services Readout.
1 BNL report ~ the history of Run7 start up ~ Yoshihide Nakamiya.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
30/06/08E. Garutti1 CALICE testbeam 2008 FNAL. 30/06/08E. Garutti2 The installation.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
Piquet report (07/Aug/ /Aug/2012) D. Pinci.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
Weekly Coordinator report July 30 th – August 6 th Murphys Law: If anything can go wrong, it will. Eric’s Observation: Catastrophies coming in sequentially,
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Vito Palladino Straw Working Group 23/3/2015
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Preparation for CERN test beam
Update on HW commissioning
LHCb & EYETS
Francesco Gonnella NA62 Collaboration meeting Washington DC, U.S.A.
ScECAL+AHCAL+TCMT Combined Beam FNAL
Status of n-XYTER read-out chain at GSI
Technische Universität München
CLAS12 Timing Calibration
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
E. Garutti - Main Meeting
November technical stop activities:
Testbeam analysis on module #1
Pierluigi Paolucci & Giovanni Polese
week coordination report 15/06/2018
Presentation transcript:

Week coordinator report - C. Marchand Beam availability 28/07 → 04/08 PS septum replacement CERN power cut 04/08/2006 Week coordinator report - C. Marchand

Status of detector « calibrations » Trigger T6 tgt Time Status Hcal2 HV tuning Halo air 2x4h +2x4h  29/07 to do Timing optimizations Hcal trigger optimization Phys CT 2h +3h Rich PMT Hadron rings CT+MT 1h Rich APV Latency scans 4h? BMS/SciFi Threshold scans HI 8h HCAL1 OT MM HV plateaux (eff) 2.5T & 1T Other det.  General alignement BT,VI.. to redo 04/08/2006 Week coordinator report - C. Marchand

Summary of week pbs & work Beam No beam since July 29, 8h: -General CERN power cut on July 29, 8h -PS septum replacement on August 1, no beam till Aug 8 Beam line -Pbs going to « Beam on » 28/07 22h: B2/3 set values off by 0.6A wrt ref. values -Interlock B4/5 during field rotation tested and works -SM1 readings fluctuations noticed night of 29/07: investigated and fixed by techs on 01/08: replaced ADC card General -AirWell conditioning unit for MM & DC FE fixed (water flow) -Problematic recovery of Demineralized water after power cut: →small leaks in solenoid PSU, fixed →bigger leak on SM2, fixed -Problematic restart of UPS units 04/08/2006 Week coordinator report - C. Marchand

Summary of week pbs & work Target - No He3 loss after power cut, but hectic restart - Polarization restarted 01/08 13h: today at 13h (3days): +46.5% ; -44.7%; +49.8% Build up time like « best 2004 » 04/08/2006 Week coordinator report - C. Marchand

Summary of week pbs & work DAQ -Online filter improvements -Work in progress to improve trigger rate: actual limitation ~ 15 k/spill, limited by DATE5 FE -New version of LOAD checks GEOID Monitoring -COOOL bug fixes - Synchronisation of afs-onl and Run-logbook DB - Inclusion of COOOL histos and MurphyTV in Run-logbook? - To do: include beam line info in Run-logbook « Jiawei’s » trigger rate control 04/08/2006 Week coordinator report - C. Marchand

Summary of week pbs & work DCS Done: - dependence on CERN network removed (except time server and SMS alerts) - Silicon & SciFi-J CAENET comm. Pbs cured? - RICH PD HV in DCS; #units for #modules - RICH Wiener LV in DCS - Display of straw temp. pannel finished - « Masked items » & « Channels off » implemented To do: - RICH PMT HV; some work on IT/CO side - SM2 NMR reading - RICH APV LV - Daq barrack temperature: asap - RICH LV trip on overheat: asap - etc… 04/08/2006 Week coordinator report - C. Marchand

Summary of week pbs & work BMS/SciFi D/J -T0 BMS/SciFi-J in DB - No change in trigger time: BMS 1/2/5 time shifted due to TCS clock cable SciFi 1/2 shifted due to F1 resolution changed SciFi W -Moved out of beam to fix discriminator board Trigger -Additional tuning when beam back Silicon -Latch all data taken: some noise dependant on solenoid field, further investigations needed GEM - GEM01/02/03 moved out (RICH work) 04/08/2006 Week coordinator report - C. Marchand

Summary of week pbs & work DCs - DC4 moved out (RICH work): - DC0 moved down 4.5mm and to Saleve 24mm MM - Trips and problematic operation in 2.5T understood: → Sebastien report Straws -Threshold scans taken - ST02 & ST03 moved out (RICH work) RW - Nothing special MWPC - Nothing special W45 - Fluctuations in gas flow due to pump pb: fixed - Few RO errors 04/08/2006 Week coordinator report - C. Marchand

Summary of week pbs & work MuonW1 - Few mismatches in detector map MuonW2 - Few problematic channels HCAL1 - LED HV tuning done, waiting for beam - Problematic ADC channels swapped to dead zone HCAL2 - Nothing special ECAL1 - A lot of work done this week on HV: all OK - Still missing part of FE ECAL2 - HV channels OK, 80% FE OK (FIADC pbs) 04/08/2006 Week coordinator report - C. Marchand

Summary of week pbs & work RICH - Radiator gas system: *no problem during power cut (UPS and diesel worked) *incident on 30/07 due to burned heater in one compressor; temporary fix during week-end, cured on Monday. *no gas lost; leak rate OK; O2 level slightly higher (8ppm) *thermalisation fixed, back to fast circulation on Tuesday 04/08/2006 Week coordinator report - C. Marchand

Summary of week pbs & work RICH - Read-out cooling: *not active on 01/08, due to short in thermalisation system (cooling & therm. linked through use of same PLC) *all RO elements connected; pbs on few MAD+APV lines *improvement on thermal protection of RO: needs reset to restart LV - PD: on since 01/08; HV in PVSS; CH4 system OK - LV: slow control in PVSS implemented for both PM and APV - MAMPT: all on; RO OK; threshold scan done - APV: sparsified mode checked, OK; pedestals measured; latency scans stopped by power cut. 04/08/2006 Week coordinator report - C. Marchand

Rich single event display 04/08/2006 Week coordinator report - C. Marchand