Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

3nd KEK-CEA Workshop on Superconducting magnets and cryogenics for accelerator frontier - 24/03/2009 Ceramic insulation for Nb3Sn accelerator magnets F.Rondeaux.
Mikko Karppinen Nb3Sn Coil Production for 11 T Dipole Model Magnets.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola January 29, 2014.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
Eucard-WP7-HFM 10 th Collaboration Meeting at LASA Milano Status on SMC & RMC Models J.C Perez on behalf of SMC/RMC collaboration team.
FReSCa2 Technical Review, 9 th June 2015, CEA Saclay FReSCa2 Technical Review June 2015 CEA Saclay J.C Perez on behalf of Fresca2 collaboration team.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
CERN/CEA Collaboration agreement No. KE2275/TE WP4 – Nb 3 Sn technology development Pré-Kick-off meeting 03/07/2014.
NED Project P. MANIL – CEA/IRFU/SIS – Short Model Coils meeting #18 – 25/01/2008 – slide 1/18 SHORT MODEL COILS PROGRAM SMC meeting #18 Pierre MANIL CEA/IRFU/SIS.
11 T Dipole Experience M. Karppinen CERN TE-MSC On behalf of CERN-FNAL project teams The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded.
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC E U CARD WP7 HFM S TATUS UPDATE MEETING O CTOBER 2011 J.C. Perez.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
HFM High Field Magnet, Engineering Design, 20/01/2011, Pierre Manil, 1/24 EuCARD-WP7-HFM ESAC Review of the dipole design Engineering Design Pierre MANIL.
1 Short Model Coils George Ellwood, Simon Canfer Jan 08.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
Superconducting Magnet Group Superconducting magnet development for ex-situ NMR LDRD 2003 Paolo Ferracin, Scott Bartlett 03/31/2003.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
11 T Dipole Project Goals and Deliverables M. Karppinen on behalf of CERN-FNAL collaboration “Demonstrate the feasibility of Nb3Sn technology for the DS.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
Dipole review, January Dipole design review: outlines of talks Gijs de Rijk, Francois Kircher and Jean- Michel Rifflet.
LARP Collaboration Meeting Racetrack Coil Fabrication
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
S. Caspi, LBNL TQS – Progress and plans Shlomo Caspi LBNL Collaboration meeting FNAL April
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
ESAC R EVIEW OF THE HIGH FIELD DIPOLE DESIGN R EACTION O VEN, S PLICING AND IMPREGNATION M ARCH 2012 FOR E U CARD-WP7-HFM J.C. Perez on behalf of SMC collaboration.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
KEK-CEA Superconducting Magnet Co-operation Program The FJPPL workshop LAPP, Annecy-Le-Vieux (France), June LHC-3 Superconducting Magnets.
J. Polinski, B. Baudouy -The NED heat transfer program at CEA CEA Saclay, January 11th NED heat transfer program at CEA NED heat transfer program.
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
Responses to the recommendations of the first ESAC dipole review
QXF Coil Fabrication & Tooling Reaction / Impregnation
MQXC Nb-Ti 120mm 120T/m 2m models
TQS Overview and recent progress
Status of the manufacturing process of a Nb3Sn wiggler prototype
Model magnet test results at FNAL
11 T Dipole Integration & Plans M. Karppinen
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
ESAC Review February 2013 CEA Saclay
ERMC/RMM activities May 2017
FCC 16 T dipole 4578 dipoles + 5 % spares : 4807 dipole magnets
CERN Conductor and Cable Development for the 11T Dipole
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
11 T dipole coil features and dimensions
FRESCA2 Update on the dipole design and new calculations
Mechanical stability and QXF coil winding
P. Ferracin and G. Ambrosio
the MDP High Field Dipole Demonstrator
SMC Design overview of the construction and project issues
MQXF updates P. Ferracin October 9th, 2014.
MQXF coil cross-section status
Presentation transcript:

J.C. Perez on behalf of SMC collaboration team J.C. Perez ESAC Review of the high field dipole design SMC as preparatory project January 2011 for EuCARD-WP7-HFM J.C. Perez on behalf of SMC collaboration team J.C. Perez

OUTLINE Aim of the SMC series SMC description SMC program 20/01/2011 Aim of the SMC series SMC description SMC program SMC1 tests results SMC3 status Future planed activities J.C. Perez TE-MSC-ML Eucard WP7-HFM ESAC Review (Saclay)

Aim of the SMC series SMC is a tool to learn: 20/01/2011 SMC is a tool to learn: Technologies needed for a Nb3Sn based high field magnet fabrication: Cable insulation Coil reaction Coil impregnation Trace fabrication Bladder fabrication Techniques of coil fabrication and magnet assembly Winding Coil instrumentation and Protection Structure instrumentation Magnet assembly with bladders and keys Nb3Sn – Nb-Ti cable connection J.C. Perez TE-MSC-ML Eucard WP7-HFM ESAC Review (Saclay) SMC is a tool to qualify: Nb3Sn cables in a real magnet configuration SMC is the “STEP 0” to build a Nb3Sn accelerator magnet at CERN

Coil pack and Iron yoke mounted in the instrumented Al2219 T851 shell SMC configuration 20/01/2011 Longitudinal rods Longitudinal compressing system for the rods Vertical key Iron yoke Lateral pad Vertical pad Racetrack coil J.C. Perez TE-MSC-ML Eucard WP7-HFM ESAC Review (Saclay) Coil pack and Iron yoke mounted in the instrumented Al2219 T851 shell

SMC Assembly Parts Assembly Parts Shell & Yoke Pads Coils & Rods 20/01/2011   Assembly Parts Shell & Yoke Pads Coils & Rods Bladders Keys Shims   Assembly Overview J.C. Perez TE-MSC-ML Eucard WP7-HFM ESAC Review (Saclay) Connection Side Non-Connection Side Ready for cold tests

SMC coils Coil and reaction mould Instrumented coil Traces 20/01/2011 Coil and reaction mould Traces Instrumented coil J.C. Perez TE-MSC-ML Eucard WP7-HFM ESAC Review (Saclay) Interconnection mock-up

SMC FEM Models CATIA ANSYS Design Modeler ANSYS Mechanical 20/01/2011 Courtesy of C. Kokkinos CATIA ANSYS Design Modeler ANSYS Mechanical Geometry Design Assembly Design Contact Regions J.C. Perez TE-MSC-ML Eucard WP7-HFM ESAC Review (Saclay) ANSYS Workbench Direct use of parameterized CATIA models Friendly environment for FEA Makes use of the new features and capabilities of the latest version of ANSYS Parametric Coil Block Meshing Process

SMC Program Not for prep. Fresca2, outside this review 1 2 3 4 5 6 SMC 20/01/2011 SMC Program SMC Coils winding Cable Insulation Spacers Impregnation 1 RAL & CERN Alstom IT 14 x ø1.25 mm Tape JPS ♯416 Ti Coated NY 750 & D400 2 CEA/Saclay PIT EAS HILTEX S2-Glass + Ceram. Ceramic precursor 3 CERN PIT S2-Glass sleeve FNAL type 4 18 x ø1.00 mm TBD 5 40 x ø1.00 mm 6 Braided S2-Glass Fibre Cyanate Esther Not for prep. Fresca2, outside this review J.C. Perez TE-MSC-ML Eucard WP7-HFM ESAC Review (Saclay)

Coil fabrication for SMC1 20/01/2011 2 double pancakes wound @ CERN in collaboration with RAL using “Low performance” cable (14 x Ø1.25 mm Alstom IT with low Jc from NED) Cables insulated with S2-Glass tape wrapped with 50% overlap Coils reacted @ RAL in TWO different furnaces and reaction tooling Coils instrumented and potted @ RAL in collaboration with CERN using TWO different moulds Coil #1 made in November 2009. Coil #2 made in March 2010 Coil #1 dimensions: 198 mm * 478 mm* 21 mm Coil #2 dimensions: 193 mm * 480 mm * 21 mm J.C. Perez TE-MSC-ML Eucard WP7-HFM ESAC Review (Saclay)

Heat treatment of SMC1 Coils 20/01/2011 Only coil#2 has been treated with a strand sample in the furnace Ic measurements of this sample performed at CERN (Ic= 1403 A @ 10T @ 4.3K) Ic measurements on an extracted sample of the 14 strand cable (Ic= 1570 A @ 10T @ 4.3K which corresponds to a Iccable= 21980 A) No degradation due to cabling ! J.C. Perez TE-MSC-ML Eucard WP7-HFM ESAC Review (Saclay) Changer photo

Assembly Configuration 20/01/2011   Overview- Assembly Parts Acronyms Explanation J Strain Gauges @ Coil Packs Connectors V-Pad Vertical Pad H-Pad Horizontal Pad VK Vertical Keys HK Horizontal Keys Bl Bladders R Rods Y Half Yoke Gap Keys Gap Keys @ Yoke . x Current Flow Direction J.C. Perez TE-MSC-ML Eucard WP7-HFM ESAC Review (Saclay)

Mechanical measurements during Assembly & Cold Tests 20/01/2011 Pump & Purge procedure to adapt the required pre-stress in the coil by using the LBNL type “Bladders & Keys” technique An accurate procedure to correlate the strain gauge readings with the FEA J.C. Perez TE-MSC-ML Eucard WP7-HFM ESAC Review (Saclay)

SMC1 Cold Powering Tests 20/01/2011 SMC1 Cold Powering Tests Cold test 1: Limited to 3915 A. Quench detected in one Nb3Sn/Nb-Ti splice on coil #2 : 40 nOhms contact resistance measured Cold test 2: Single coil powering configuration using coil #1. Only one quench detected in layer 1 (estimated QPV: 25 m/s) All other quenches detected in layer 2 and never in the splice area J.C. Perez TE-MSC-ML Eucard WP7-HFM ESAC Review (Saclay) Quench in the splice Quench in coil #1

SMC1 Training Summary 20/01/2011 J.C. Perez TE-MSC-ML Eucard WP7-HFM ESAC Review (Saclay) Possible causes for lower than expected performance of the magnet are under investigation

Lessons from SMC1 20/01/2011 The splice zone between Nb3Sn and Nb-Ti cable has been identified as a possible high pre-stress area in the cable during heat treatment and magnet operation. The end saddle geometry and insulating pieces has been modified to prevent this phenomenon on SMC3 The heat treatment mould has been modified to guaranty the parallelism of the sides pushing bars and to better control the cavity dimension during reaction operation. Similar modifications of the impregnation mould have been made The layer jump at the central post extremity is a weak point of the present coil geometry (jump to be made on straight section on longer coils) Electrical insulation of the central island, particularly on the layer jump area has to be improved as well as for the end- spacers J.C. Perez TE-MSC-ML Eucard WP7-HFM ESAC Review (Saclay)

Coil Fabrication at CERN for SMC3 (1/2) 20/01/2011 Coil Fabrication at CERN for SMC3 (1/2) 2 coils for SMC3 with PIT 14 x Ø1.25 mm strand with Ti islands and spacers wound in November Cable insulated with S2-Glass sleeve (FNAL type) Electrical insulation of the central island on the layer jump area with ceramic 989F Heat treatment in a vacuum furnace @ CERN Coils instrumentation underway Coils will be potted Q1_2011 using Epoxy NY 750 & Jeffamine D-400 Magnet assembly scheduled for the end of Q1_2011 Cold powering tests scheduled Q2_2011 (Moving of Block4 to SM18) J.C. Perez TE-MSC-ML Eucard WP7-HFM ESAC Review (Saclay)

Coil Fabrication at CERN for SMC3 (2/2) 20/01/2011 Winding machine Winding operation Coil ready for reaction J.C. Perez TE-MSC-ML Eucard WP7-HFM ESAC Review (Saclay) Instrumented coil

Future Activities Coil fabrication 20/01/2011 2 coils for SMC3 with PIT 14 x Ø1.25 mm strand to be completed at CERN (January 2011) 2 coils for SMC4 with PIT 18 x Ø1.0 mm strand to be wound at CERN (Q1_2011) 2 coils for SMC5 with PIT 40 x Ø1.0 mm strand (FRESCA2- type cable) to be wound at CERN (Q2_2011) 2 coils for SMC6 with PIT 40 x Ø1.0 mm strand (FRESCA2-type cable) to be wound in collaboration CERN/RAL (using coated islands, braided glass fibre, Cyanate Esther, Q2_2011) J.C. Perez TE-MSC-ML Eucard WP7-HFM ESAC Review (Saclay)

Future Activities Magnet assembly 20/01/2011 SMC3 equipped with coils SMC3_C#_PIT_14/1.25 to be assembled and cold tested at CERN (Q2_2011) SMC4 equipped with coils SMC4_C#_PIT_18/1 to be assembled and cold tested at CERN (Q3_2011) SMC5 equipped with coil SMC5_C#_PIT_40/1.0 to be assembled and cold tested at CERN (Q3_2011) SMC6 equipped with coil SMC6_R#_PIT_40/1.0 to be assembled and cold tested at CERN (Q4_2011) J.C. Perez TE-MSC-ML Eucard WP7-HFM ESAC Review (Saclay)

Future Activities Technology improvement 20/01/2011 Future Activities Technology improvement Electrical insulation method for central islands and end spacers to be investigated (collaboration agreement with RAL) Cable insulation to be improved: S2-Glass tape, braided glass fibre, S2 Glass sleeve... (CERN, RAL, CEA) Cyanate Esther impregnation to be tried (collaboration agreement with RAL) Coil fabrication using “FNAL-LARP type” ceramic binder to be tried FRESCA2-type coil using final cable, insulation and impregnation method to be used for the Fresca2 magnet to be built J.C. Perez TE-MSC-ML Eucard WP7-HFM ESAC Review (Saclay) Thanks for your attention