X-band Technologies IFIC, Valencia Test Infrastructure

Slides:



Advertisements
Similar presentations
RF Development for ESS at Uppsala University
Advertisements

Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
An RF & High-Speed Acquisition Systems for High-Gradient Tests at CLIC Test Facility Raquel Fandos.
SRF Test Infrastructure in Europe W. Weingarten with O. Brunner, S. Calatroni, B. Vullierme (CERN) and R. Eichhorn, E. Elsen, D. Gardès, J. Knobloch, G.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Introduction to the X-band resource estimation exercise W. Wuensch Collaboration meeting 3 November 2011.
Passivation of HPGe Detectors at LNL-INFN Speaker: Gianluigi Maggioni Materials & Detectors Laboratory (LNL-INFN) Scientific Manager: Prof. Gianantonio.
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
Walter WuenschLCWS October 2012 Workshops on X-band and high gradients: collaboration and resource.
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
Jose Alberto Rodriguez.  Describe how we currently characterize structures at CTF3  Describe how we want to improve the characterization  Learn from.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
CLIC Spain collaboration CIEMAT: AC structures and Dipoles magnetsCIEMAT: AC structures and Dipoles magnets CELLS - ALBA: Stripline kickers, Impedance.
Contribution from Pakistan to CLIC & CTF-3 Project. NASIR ABBAS
WP2 status Gijs de Rijk This project has received funding from the European Community's Seventh Framework Programme (FP7/ )
12 GHz Stand alone power source. Provisional Klystron Parameters ParametersSpecificationsunitsObservations RF Frequency12 (11.4)GHz Peak RF power50 -75MW.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Status of the 1.2 MW MB-IOT for ESS Morten Jensen CLIC Workshop 2016, January, CERN.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
Task 4.3: Mitigate beam-induced vacuum effects (STFC, CERN) O.B. Malyshev and R. Valizadeh, ASTeC Vacuum Science Group, STFC Daresbury Laboratory, UK EuroCirCol.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Introduction to Summary of the X-band resource estimation exercise
CALIFES A proposed electron beam test facility at CERN
How does a klystron work? TE-MPE Section Meeting Karolina Kulesz
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
Contribution of Ankara University Accelerator Technology Institute
WP5 Elliptical cavities
Thales Klystrons for Linacs
Development of X-band 50MW klystron in BVERI
Uppsala Commitment to ESS and FREIA Planning
Pulsed DC System Facilities
CLIC-Spain collaboration report
Accelerator Research and Innovation for European Science and Society
Access to radiofrequency testing facilities
Chris Adolphsen Sergei Nagaitsev
Overview High-Powered Amplifier Exciter Receiver Oscillators
The situation is far better than I had thought.
X-band and high-gradient development plans at Tsinghua University
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
12 GHz High Power RF components requirements for CEA activities
Collaboration New collaborators in 2016:
Testing Infrastructure, Program and Milestones
WP11: electron and proton beam testing
ESS RF Development at Uppsala University
Task 2: High-gradient normal-conducting technology development
X-band Facilities and High Gradient Tests Stands Around the World
Recent high-gradient testing results from the CLIC XBoxes
Accelerators R&D at IFIC “Reunión de Electrónicos”, May 2010
CEPC RF Power Sources System
Olivier Napoly, coordinator CEA/Irfu
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
RF Pulse Shaping.
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
Saclay Test Facilities
Cryomodules Challenges for PERLE
Explanation of the Basic Principles and Goals
STATUS REPORT OF THE SPARC HIGH POWER RF SYSTEM Nov. 16, 2005 R
CLIC Feasibility Demonstration at CTF3
Novel Accelerator and Detector Systems
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

X-band Technologies IFIC, Valencia Test Infrastructure - X-band RF structure High Power Testing (TESTING) Creation and Operation of X-band High Power Testing Facilities (TEST AREAS) Basic High Gradient R&D (HIGH-GRADIENT) IFIC, Valencia Test Infrastructure CLIC Collaboration Working Meeting, 2012-16 Work Packages 3-4 November 2011 Work Package: X-band Technologies In the areas of: - X-band RF structure High Power Testing (TESTING) - Creation and Operation of X-band High power Testing Facilities (TEST AREAS) - Basic High-Gradient R&D (HIGH-GRADIENT) Title: IFIC, Valencia - Test infrastructure S. Verdú-Andrés on behalf of IFIC, GAP (Group of Accelerator Physics) http://gap.ific.uv.es Valencia, Spain

+ City Hall of Valencia + Valencian Regional Governement) Experience The European Space Agency (ESA) and the Val Space Consortium (VSC) (= Universitat de València Estudi General (UV) + Universidad Politécnica de Valencia (UPV) + + City Hall of Valencia + Valencian Regional Governement) High Power RF Space Laboratory is the ESA Laboratory especialized in: - RF breakdown phenomena (Multipactor, Corona and power handling) - Passive Inter-Modulation (PIM). The IFIC Group of Accelerator Physics (GAP) is participating in: development of medical accelerator structures (cyclinacs in S and C-bands, PARTNER project) measurement and data analysis of high-gradient structures at KEK and CTF3 (in collaboration with CLIC RF group)

Intentions Strong willingness to join efforts of both communities, Accelerators and Space Communications, in the study and measurement of RF structures and associated phenomena. RF breakdown & multipactor study, surface characterization (electronic microscopy, XPS-UPS, SEM), outgassing, nano-layer growing techniques, surface backing, etc. creation and operation of X-band high-power testing facility (high-gradient test stand in X-band (9.3 GHz)) X-band RF structure high-power testing There is a strong willingness coming from … Our interest in this WP is:

Equipment EXISTING EQUIPMENT TO BE FUNDED 5 high-vacuum chambers (min. press. 10-8 mbar), Power amplifiers from 435 MHz to 30 GHz Several spectrum analyzers, network analyzers, … Waveguides, directional couplers, cables, attenuators, circulators, isolators, bolometers and others Multichannel multipactor station , unique in the world Electron sources: electron gun, 90Sr, Hg ultraviolet sources XPS-UPS, SEM, electronic spectroscopy Evaporation system for layer growing and outgassing studies 2 clean rooms class 10000 (equivalent to ISO 7) + mechanics & electronics workshop (2D and 3D metrology system) TO BE FUNDED 9.3 GHz pulsed klystron: 6 MW peak, 6 kW average Vacuum chamber XPS-UPS So far, the High Power RF Space Laboratory (X ray Photo emission Spectrography – Ultraviolet Photo Emission Spectrography) Vacuum chambers: min. pressure 10-6, 10-7 and 10-8 mbar. Dimesions of vacuum chamber with lowest pressure: 1 meter long and 0.6 meter diameter. 9 GHz pulsed klystron

Collaboration Info Institute: Valencia, IFIC Main contacts:   Main contacts: Angeles Faus-Golfe CERN responsible: Walter Wuensch and Erk Jensen Activity/work package/task: X-band rf/high-gradient test areas/task 4 Related X-band test areas Technical subject: X-band technology development and high-power test area. Main activity is medical X-band linac development Working arrangement: Facility installed in VALspace consortium. Scientific program defined by IFIC Funding status: Applying for funding to Valencia region and someplace else. Decision expected January 2012. Formal agreement: Will be made for this activity after funding approved. CTF3 agreement with IFIC already exists. Expected resources 2012 2013 2014 2015 2016 Comment Material budget [keuro at current rate] 40 applying funding Manpower at institute [FTEyears] 2 1 technical, 0.5 professor, 0,5 engineer Manpower at CERN [FTEyears] 1 1 PhD student