Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)

Slides:



Advertisements
Similar presentations
FANS (Future Air Navigation System) Flight Crew Procedures
Advertisements

Federal Aviation Administration S1P1/P2 Production System: DCL Route Rules DCIT#32 16 April 2014.
Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:
Presented to: DCIT By: Andy Fry, Thane Inc. Date: September 20, 2011 Federal Aviation Administration Data Communications DCIT #9 Flight Deck Working Group.
AOC/FOC Interface for Data Comm Production System
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 En Route Route Clearances Draft Use Case Introduction Boeing –
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #26 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 07/11/12.
Federal Aviation Administration Data Communications Program Data Comm Trials and Production Requirements: High Level Impact Presented To: DCIT #23 Plenary.
12/01/2011 FEDERAL AVIATION ADMINISTRATION AIR TRAFFIC ORGANIZATION 1 Execution of Flow Strategies (XFS) (aka Go Button)
Presented to: DCIT #12 Plenary By: Andy Fry, Thane Inc. Date: January 12, 2012 Federal Aviation Administration Data Communications DCIT Update Flight Deck.
Data Link Communications
Data Communications Implementation Team (DCIT)
Document Tracking and the Related Process Andria Roney Rob Mead Andy Fry Andrew Onken.
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Harris.com Alex Murray | DCIS Benefits Lead DCIT Brief Data Comm Benefits & Metrics Alignment with DC Program, NIWG, & NAC.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT25 Update To:DCIT25 Plenary From: Matt Maki Date:
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Federal Aviation Administration DCIT 39: S1P1 DCL E2E Summary DRAFT To: DCIT All WG From: Data Comm Production SE Date: DCIT 39, 11 March DRAFT.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #33 Agenda 6/4/2014 Harris – Washington, DC.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 Agenda 06/12-06/13/2013 Boeing – Arlington, VA.
Federal Aviation Administration Test Planning for AOC/FOC Interface for Data Comm Production System To: DCIT 29 From: Data Comm Production Sub-Team Date:
EWR DCL Trial Update Capt Gregg Kastman MD-11 Flt Trng Sup.
SPAM Student Payroll And Management. SPAM Overview " Project Plans " Student functions " Administrator functions " Detailed Design " Technical Specifications.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT Meeting 08/24/2011.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #23 Plenary 05/09/2013 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Comm Production Summary vs. Trials: Presented To: DCIT WGs By: Production Sub-Team Date: March 13, 2014.
Presented to: DCIT By: Andy Fry, Thane Inc. Date: September 26, 2013 Federal Aviation Administration Data Communications DCIT FDWG Climb Via Discussion.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #27 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT 37 Plenary Agenda December 10, 2014 Harris Corp Washington, DC.
GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS.
Harris.com 02/01/2014 – 02/28/2015 Alex Murray | Systems Engineer DCIT 39 Plenary Health Monitoring Stats.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 08/22/12.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 2/1/13.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status Updates To:DCIT21 Plenary From: Matt Maki Date:
Courtesy Copy Messages DCIT WG meetings 3/6/2012.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #22 Plenary 03/14/2013 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Subscriber Database (SDB) and Web Access To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 3/13/13.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
FAA NextGen Data Comm Tower Service: CPDLC DCL New Operator Introduction.
Federal Aviation Administration Test Planning for AOC/FOC Interface for Data Comm Production System To: DCIT 26 From: Data Comm Production Sub-Team Date:
Presented to: DCIT Flight Deck Working Group By: Andy Fry, Thane Inc. Date: October 12, 2011 Federal Aviation Administration Data Communications DCIT #10.
COPYRIGHT © 2013 BOEING. ALL RIGHTS RESERVED Identifying potential service enhancements to increase operator participation DCIT May 2013 Brad Cornell.
International Civil Aviation Organization
EWR DCL Flight Tests Capt Gregg Kastman MD-11 Flt Trng Sup
Data Communications Implementation Team (DCIT)
Data Communications Implementation Team (DCIT)
FANS (Future Air Navigation System) Flight Crew Procedures
International Civil Aviation Organization
Data Communications Implementation Team (DCIT)
Chapter 6: Community Features.
Data Communications Program
Data Communications Implementation Team (DCIT)
Data Communications Implementation Team (DCIT)
ATC Clearances Chapter 3 Section C.
Flight Instruments / Comm / Nav / FMS
Operational Context and Use Case Focus Group
Operational Context and Use Case Focus Group
Presentation transcript:

Data Comm Departure Clearance End To End Summary: (DCIT #27 WG) 26 September 2013

Production DCL End2End Summary: Example Changes from Trials Users designate DCL and PDC flights via ICAO Flight Plan filing and Subscriber Data Base (SDB); no more FRC DCL in Field 18 REM/ field CPDLC (Connection establishment) only after ATC approves the DCL No CPDLC “Active Status” if user logs on early (prior to P-Time-30 min) Flights with local (unpublished) arrival procedures (PARs) in the route are now eligible for DCL; will not be cleared for the local arrival procedures until en route NAV Database differences may result in differences for international flights, i.e., “TO” point for UM79? Production uses ERAM NAV DB; Trials has its own Jeppesen UM83 currently in Production system; open issue for post-initial release to put in a switch Gate Request Message to AOCs as separate message, sent when controller approves the DCL Fallback from DCL to PDC capability and user preference to do so

Production End2End Document Based on Trials End2End Action Item from DCIT 26 Draft, and feedback appreciated Any comments to Carol Burr (cburr@mitre.org), Bruce Notley (Bruce.Notley@faa.gov) and Rob Mead (rob.mead@boeing.com)