STT Status & News Peter Wintz (FZ Jülich) for the STT group

Slides:



Advertisements
Similar presentations
The Central Straw Tube Tracker In The PANDA Experiment
Advertisements

Calibration of a Modular Straw-Tube- Tracker for the COSY-TOF Experiment Sedigheh Jowzaee 3-6 June 2013, Symposium on Applied Nuclear Physics and Innovative.
Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
1 Pixel Readout of GEMs Motivation The Setup Results Next Steps A. Bamberger, K. Desch, J. Ludwig, M. Titov, U. Renz, N. Vlasov, P. Wienemann, A. Zwerger.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Design and test of a high-speed beam monitor for hardon therapy H. Pernegger on behalf of Erich Griesmayer Fachhochschule Wr. Neustadt/Fotec Austria (H.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
Short Range Correlation in 4 He E07 – 006 Update report presented to the Hall A User group meeting the Hall A User group meeting Igor Korover Tel Aviv.
DE/dx measurement with Phobos Si-pad detectors - very first impressions (H.P Oct )
Electromagnetic Calorimeter for HADES at SIS100: MAMI and CERN test results Lead-glass modules Tests -  beam at MAMI energy resolution -  - /e - beam.
Self triggered readout of GEM in CBM J. Saini VECC, Kolkata.
Front-end readout study for SuperKEKB IGARASHI Youichi.
Mitglied der Helmholtz-Gemeinschaft Calibration of the COSY-TOF STT & pp Elastic Analysis Sedigheh Jowzaee IKP Group Talk 11 July 2013.
Mariana Petris, NIPNE Bucharest CBM Meeting, March 9 -12, 2005 HIGH COUNTING RATE TRANSITION RADIATION DETECTOR Bucharest Prototype In Beam Tests.
The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 CDC Readout - upgrade for Higher Luminosity - Y.Sakai (KEK) 29-Oct-2002 TRG/DAQ Review of Status/Plan (based on materials from S.Uno/M.Tanaka)
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
A Prototype Diamond Detector for the Compton Polarimeter in Jefferson lab, Hall C Medium Energy Physics Group Amrendra.
Christian Lippmann (ALICE TRD), DPG-Tagung Köln Position Resolution, Electron Identification and Transition Radiation Spectra with Prototypes.
Juin 1st 2010 Christophe Beigbeder PID meeting1 PID meeting Electronics Integration.
Mitglied der Helmholtz-Gemeinschaft Hardware characterization of ADC based DAQ-System for PANDA STT A. Erven, L. Jokhovets, P.Kulessa, H.Ohm,
Mitglied der Helmholtz-Gemeinschaft STT News & Status Peter Wintz (FZ Jülich) for the STT group LII. PANDA CM Giessen, TRK session, Mar-18 th, 2015.
Outline Description of the experimental setup Aim of this work TDC spectra analysis Tracking method steps Autocalibration Single tube resolution Summary.
STT read-out concepts Detectors requirements and layout Read-out concepts Developments of Analog FE and Digital Boards STS el. group : INFN, FZ Juelich,
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Overview of TPC Front-end electronics I.Konorov Outline:  TPC prototype development  Readout scheme of the final TPC detector and further developments.
Beam detectors in Au+Au run and future developments - Results of Aug 2012 Au+Au test – radiation damage - scCVD diamond detector with strip metalization.
Rectifier-Capacitor Threshold Tracer for mu2e Straw Chamber Wu, Jinyuan Fermilab Jan
SKIROC status Calice meeting – Kobe – 10/05/2007.
STT Detector risk’s assessment. STT detector work packages Straw Tubes modules Straw Tracker mechanics Front-End Electronics Analog electronics Digital.
1 straw tube signal simulation A. Rotondi PANDA meeting, Stockolm 15 June 2010.
 13 Readout Electronics A First Look 28-Jan-2004.
1 J.M. Heuser − STS R&D Johann M. Heuser, GSI CBM-STS Project Leader Meeting on Experiment with external HI beams of the Nuclotron-M JINR, 4 February 2011.
Mitglied der Helmholtz-Gemeinschaft STT News Peter Wintz (IKP, FZJ) PANDA Collaboration Meeting, Dec-2013, FAIR.
for the HADES Collaboration
Activities and Results from PNPI GATCHINA
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
WBS 1.03 Readout Systems Specifications, Design and Acceptance
Read-out set-up and test results
TPC status report Marian Ivanov.
KLOE II Inner Tracker FEE
FEE for TPC MPD__NICA JINR
Activities on straw tube simulation
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
A General Purpose Charge Readout Chip for TPC Applications
Status of HESR 18th March Gießen Dieter Prasuhn.
on behalf of the AGH and UJ PANDA groups
STT Detector risk’s assessment
First results from prototype measurements
Start Detector for pion experiments
Saikat Biswas, A. Abuhoza, U. Frankenfeld, C. Garabatos,
Resolution Studies of the CMS ECAL in the 2003 Test Beam
Functional diagram of the ASD
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
SHiP straw tracker prototype tests
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
DCH FEE 28 chs DCH prototype FEE &
The Beam Test at Fermilab:
STT Status Update Peter Wintz (FZ Jülich) for the STT group
PADI for straw tube readout and diamonds for MIPs and for high precision tracking beam test – Jülich, Feb Jerzy Pietraszko, Michael Träger, Mircea.
M. Jones B. Wojtsekhowski
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
On behalf of CEPC calorimeter working group
HaRDROC status: (Hadronic RPC Detector Read Out Chip for DHCAL)
HaRDROC status: (Hadronic RPC Detector Read Out Chip for DHCAL)
Presented by T. Suomijärvi
Status of MUCH Electronics
Presentation transcript:

STT Status & News Peter Wintz (FZ Jülich) for the STT group 59. PANDA CM, FAIR, Dec-6th, 2016

Peter Wintz - STT Status - 59. CM Outline: STT Status & News Timelines Electronic Readout Beam test campaign in 2016 Dec-6th, 2016 Peter Wintz - STT Status - 59. CM

Peter Wintz - STT Status - 59. CM Status & Timelines Beam test campaign in 2016 at COSY completed last week New beam test area set up, straw test systems for both readouts Measure broad dE/dx range with proton & deuterons at COSY Readout workshop in Krakow fixed to Jan-30/31, 2017 https://indico.gsi.de/conferenceDisplay.py?confId=5290 Define decision process for final STT readout, TC involvement Aim for readout decision by Q1/2018 Request for next beam time, earliest for Q4/2017, beam program definition Pre-series system test set up (one STT sector) in Q4/2017 Straw productions in Julich will end 2017/18 Dec-6th, 2016 Peter Wintz - STT Status - 59. CM

Peter Wintz - STT Status - 59. CM Status Electronic Readout STT with readout of drift time and dE/dx for PID, two readout solutions FE-ASIC / TRB (drift time and time-over-threshold for dE/dx information) Pre-series system set up ongoing (700 ch) All components specified and available: ASICs, FEBs, TRB3 system Currently (automatic) bonding of >100 ASICs by company, QA issue dE/dx separation power by time-over-threshold demonstrated (s. below) Time-over-thresh resolution studies ongoing Amp/ADC - FPGA (pulse shape sampling for drift time and dE/dx) System design done (integrated amplifier / ADC backend) In-beam prototype test last week (16ch board, 3x diff. amplifier gains) Work flow plan set up, pre-series system scheduled for Q3-2017 Straw setup to be repaired (~ 6-7 years old) Dec-6th, 2016 Peter Wintz - STT Status - 59. CM

Peter Wintz - STT Status - 59. CM dE/dx - Readout Result (Prelim.) Krzysztof Pysz (IFJ Krakow) Beam test campaign in 2016 (Apr/Dec) 9 days proton beam: 3.0, 1.0, 0.75, 0.55 GeV/c 6 days deuteron beam: 1.5, 0.75, 0.6 GeV/c 600 MeV/c deuterons with 10mrad straggling Measured dE/dx range: ~ 5 .. 30 keV/cm (@ 2bar) Low noise level, same thresholds (in Apr/Dec) Measured dE/dx by FADC (40% truncation) for proton beam dE/dx (arb. units) Momentum (GeV/c) Pawel Strzempek (JU Krakow) 550 MeV/c 750 MeV/c (1 GeV/c) 3 GeV/c Separation power Momentum (GeV/c) Simulation of PID separation power for STT by simulated dE/dx (PANDA-STT TDR) Measured time-over-threshold (drifttime correct., 20% trunc.) for proton beams of diff. momenta Dec-6th, 2016 Peter Wintz - STT Status - 59. CM

Peter Wintz - STT Status - 59. CM ASIC/TRB – Readout Status (Raw Spectra from April 2016 Beam Time) In-beam position of straw setup with FE-ASIC boards (beam from the right) beam spot area ASIC analog output signals (in-beam), NL <5mV (stable), min. thresh. at 10mV TDC time (top) and time-over-threshold (below) vs channel Dec-6th, 2016 Peter Wintz - STT Status - 59. CM

Peter Wintz - STT Status - 59. CM Snapshots Beamtime Nov/Dec 2016 TRB3-DAQ, cts rate for 1.5 GeV/c beam, trigger (red), readout rate (green) COSY beam extraction cycle 2min (spike intensities on detectors) Hitmap (6x24 straws), ~ 2x2 cm2 spot 600 MeV/c deuteron beam dE/dx > 8x MIPS FE-ASIC analog outs on scope Some tail cancellation limit seen (i.e. yellow waveform) beam Dec-6th, 2016 Peter Wintz - STT Status - 59. CM

Peter Wintz - STT Status - 59. CM Snapshots Beamtime Nov/Dec 2016 FADC prototype readout Pre-liminary results (Krzysztof Pysz, Krakow) Results for 750 MeV/c deuteron ~ 153µm spatial resolution (top fig.) ~ 7% dE/dx resolution (lower fig.) Data analysis of 16ch Amp/ADC testboard in progress Straw setup to be improved/repaired Dec-6th, 2016 Peter Wintz - STT Status - 59. CM

Thank you for your attention Dec-6th, 2016 Peter Wintz - STT Status - 59. CM