OPTIFRAME : Project Overview

Slides:



Advertisements
Similar presentations
Transport TEN-T 2012 Calls for Proposals Info Day SESSION 2 MULTIMODAL AND CROSS-CUTTING PRIORITIES AIR TRAFFIC MANAGEMENT Unit Single European Sky - DG.
Advertisements

SIP/2012/ASBU/Nairobi-WP/19
Global ATM Operational Concept
Preliminary Hazard Analysis of EUROCONTROL Concept of Operations 2011 using the FAST method European Organisation for the Safety of Air Navigation presented.
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
Episode 3 / CAATS II joint dissemination event Gaming Techniques Episode 3 - CAATS II Final Dissemination Event Patricia López Aena Episode 3 Brussels,
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
New market instruments for RES-E to meet the 20/20/20 targets Sophie Dourlens-Quaranta, Technofi (Market4RES WP4 leader) Market4RES public kick-off Brussels,
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
Introduction to TIDE Transferability Methodology TIDE Workshop: Transferring walking innovation in the European context Walk21, Munich, 11 th September.
Continuous Climb Operations (CCO) Saulo Da Silva
SOUTH AFRICAN NATIONAL ROADS AGENCY LTD Pavement Research
The SMARTFREIGHT project Hans Westerheim SINTEF ICT.
SESAR and ASAS Opportunity
University of Minho School of Engineering Centre Algoritmi Uma Escola a Reinventar o Futuro – Semana da Escola de Engenharia - 24 a 27 de Outubro de 2011.
1 DLR/EEC Total Airport Management Christoph Meier & Peter Eriksen European Organisation for the Safety of Air Navigation.
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
BUSINESS CASE Episode 3 - CAATS II Final Dissemination Event Ignacio Zozaya Boeing Research & Technology Europe CAATS II Brussels, 13 & 14 Oct 2009.
European Innovation Partnership on Active and Healthy Ageing 07 April 2011 Jorge Pinto Antunes Strategy and Analysis Unit DG SANCO, European Commission.
SESAR Single European Sky Air traffic management Research
David Bowen Head of ATM Operations and Systems
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 1 Scene setting for Episode 3 Philippe Leplae EUROCONTROL Episode 3.
European Operational Concept Validation Methodology E-OCVM Version 3: What’s New Episode 3 - CAATS II Final Dissemination Event Matthias Poppe DFS Episode.
The roots of innovation Future and Emerging Technologies (FET) Future and Emerging Technologies (FET) The roots of innovation Proactive initiative on:
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
CLARIN work packages. Conference Place yyyy-mm-dd
Required Total System Performance (RTSP) Bernard Miaillier EUROCONTROL Agenda Item 3 EUROCONTROL.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau Agenda Item 1.
1 ILA Berlin - May 2008 Marc Brochard - EEC EPATS ATM General Requirements & relative issues to be solved.
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Total Resource and Energy Efficiency Management System for Process Industries The sole responsibility for the content of this document lies with the authors.
ICT Smartcities 2013 FP7-SMARTCITIES-2013 OPTIMUS Concept, Objectives and Work Plan OPTIMising the energy USe in cities with smart decision support system.
Module 8 Guidelines for evaluating the SDGs through an equity focused and gender responsive lens: Overview Technical Assistance on Evaluating SDGs: Leave.
Economic issues Formulation of Business cases H. Sudarshan
Collaborative Decision Making (CDM) Saulo Da Silva
COmbining Probable TRAjectories — COPTRA
Welcome to the SESAR SWIM Master Class 2013
CEATS Central European Air Traffic Services
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Workshop on preparations for ANConf/12 − ASBU methodology
Introduction of TBO within OptiFrame
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
OptiFrame WP6: Overview, status and contents
Continuous Climb Operations (CCO) Saulo Da Silva
OptiFrame WP7: Implications for Decision Makers and Dissemination of results LANCASTER UNIVERSITY Centre for Transportation Systems and Logistics (CENTRAL)
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Global ATM Operational Concept
Work Package 3 Data Management
OptiFrame WP2: State-of-the-art and Stakeholders Expectations
Agenda Item 1 A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau.
OptiFrame WP1: Project Management
Continuous Climb Operations (CCO) Saulo Da Silva
The Single European Sky Implementation Programme: SESAME
Trajectory-Based Operations(TBO) Saulo Da Silva
What is SESAR? SESAR is the European program for air traffic management infrastructure modernisation. SESAR aims at the development of the next generation.
Nikola Ivanov, Fedja Netjasov, Radosav Jovanovic
Workshop on preparations for ANConf/12 − ASBU methodology
SPECTRUM STRATEGY & VISION
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Soren Dissing - EUROCONTROL
Presentation transcript:

OPTIFRAME : Project Overview K. G. Zografos and G. Lulli Lancaster University Management School (LUMS) Centre for Transport and Logistics (CENTRAL) LANCASTER UNIVERSITY Brussels, October 5th 2016

Consortium [Insert name of the presentation]

Main objective Application of principles of mathematical modelling and optimization to configure and assess the performance of the Trajectory Based Operations (TBO) concept. Viability of the concept Major issues (e.g., barriers, constraints, stakeholders’ expectations, etc.) Whether and to what extend the objectives of flexibility of airspace users and predictability of the ATM system can be achieved

Project outcome Development of a framework to address the identified objectives and provide guidance to decision makers on the potential and conditions of deployment of the TBO concept. This framework, consisting of mathematical models, solution algorithms and conditions of applicability, can be used: as a “simulator” to fully understand the benefits and limitations of the TBO approach; to investigate trade-offs between different competing objectives relevant to the TBO concept ; as an engine for the preliminary identification, on a daily basis, of promising ATM interventions regarding the ECAC-wide area.

Innovative aspects of the proposed approach It explicitly takes into account the route preferences and flight criteria and priorities of the airspace users. Holistic view of the ATM system (by considering all ATM system components for the entire ECAC area). … but barriers, enablers and potential benefits from the TBO concept implementation should be analysed.

Research questions How stakeholders’ priorities and preferences can be incorporated into mathematical models? What are the scalability issues associated with the development and implementation of these models and algorithms?

Project activities (WPs) WP1 Project Management [ULANC] WP2 State-of-the-art and Stakeholder Expectations [CFR] WP3 Data Management [CFR] WP4 Modelling of TBO [ULANC] WP5 Development and Implementation of Solution Algorithms (exact and heuristic) [ULANC] WP6 Validation of the OptiFrame approach in normal and disturbance cases [NLR] WP7 Implications for Decision Makers and Dissemination of results [EUROCONTROL] WP8 Ethics requirements [ULANC]

Management structure SESAR JU CFR ULANC NLR ECTRL PROJECT COORDINATOR Lancaster University STEERING COMMITTEE ADVISORY COMMITTEE OF STAKEHOLDERS WP2 STATE-OF-THE-ART AND STAKEHOLDER EXPECTATIONS WP3 DATA MANAGEMENT WP4 MODELLING TRAJECTORY-BASED OPTIMISATION (TBO) WP5 DEVELOPMENT AND IMPLEMENTATION OF SOLUTION ALGORITHMS WP6 VALIDATION AND SENSITIVITY OF TBO TO PERTURBATIONS WP7 IMPLICATIONS FOR DECISION-MAKERS AND DISSEMINATION CFR ULANC NLR ECTRL

Interrelation of project activities WP5 Development & Impl. of Algorithms WP1 Project Management WP2 State-of the-art and Stakeholder Expectations WP3 Data Management WP4 Modelling TBO WP6 Validationon of OptiFrame Approach WP7 Implications for Decision Makers and Dissemination

Project schedule

Workshop related tasks WP 4: Modelling of TBO Task 4.1: Optimization modelling of ATM system. Task 4.2: Modelling of stakeholder preferences and priorities. Task 4.3: Preliminary model assessment and modelling refinements. WP6: Validation of the OptiFrame approach in normal and disturbance cases Task 6.1: Identification of disturbances and operational scenarios of TBO. Task 6.2: Qualitative assessment of OptiFrame models in normal and disturbance cases. Task 6.3: Assessment of the OptiFrame computational framework in normal and disturbance cases

Expected project impact Project impact will be assessed in relation to ICAO’s KPIs Capacity Access & equity Cost effectiveness Efficiency (environment) Flexibility Predictability

Expected impact on SESAR target concepts Moving from airspace sectors to 4D Trajectory Management Traffic Synchronisation Network Collaborative Management and Dynamic Capacity Balancing Airport Integration and Throughput

Thank you very much for your attention! OPTIFRAME : Project Overview Thank you very much for your attention!